Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 694.21 190.01 27.37  
1 ALIPURDUAR Madarihat Alipurduar Division MADHYA KHAIRBARI PIPED WATER SUPPLY SCHEME , SM/13248 New Providing FHTC from existing distribution system as per specification for MADHYA KHAIRBARI PWSS under Alipurduar Division, PHE Dte. Alipurduar RWS,Birpara A.E JUNIOR ENGINEER,RWS Madarihat - Birpara Block ORD/000285/2023-2024 1992/ALD 15/09/2023 360 DINABANDHU RAY 16.91 0.00 0 0
2 ALIPURDUAR Madarihat Northern Mechanical Division II MADHYA KHAIRBARI PIPED WATER SUPPLY SCHEME , SM/13248 New NEW SERVICE CONNECTION FOR MADHYA KHAIRBARI PWSS P/H NO I APPLICATION NO 4003065159 BILL/01788/2023-2024 BP-2023-24-367 27/09/2023 WBSEDCL 15.45 0.00 0 0
3 ALIPURDUAR Madarihat Northern Mechanical Division II MADHYA KHAIRBARI PIPED WATER SUPPLY SCHEME , SM/13248 New NEW CONNECTION SETRVICE FOR MADHYA KHAIRBARI PWSS P/H NO II APPLICATION NO 4003065166 BILL/01789/2023-2024 BP-2023-24-368 27/09/2023 WBSEDCL 8.34 0.00 0 0
4 ALIPURDUAR Madarihat Northern Mechanical Division II MADHYA KHAIRBARI PIPED WATER SUPPLY SCHEME , SM/13248 New NEW CONNECTION SETRVICE FOR MADHYA KHAIRBARI PWSS P/H NO III APPLICATION NO 4003065168 BILL/01790/2023-2024 BP-2023-24-369 27/09/2023 WBSEDCL 5.82 0.00 0 0
5 ALIPURDUAR Madarihat Alipurduar Division MADHYA KHAIRBARI PIPED WATER SUPPLY SCHEME , SM/13248 New Material Requisition To Resource Division RTOR000091/2023-2024 115/ALD 10/01/2024 Resource Division 15.17 0.00 0 0
6 ALIPURDUAR Madarihat Alipurduar Division MADHYA KHAIRBARI PIPED WATER SUPPLY SCHEME , SM/13248 New Boring of TW, Cons. Of Pump House, boundary wall, OHR (300 cum) inclu. Soil investigation works, Laying of rising main, distribution system and providing FHTC for MADHYA KHAIRBARI PWSS under Alipurduar Division PHE DTE. Alipurduar RWS,Birpara A.E JUNIOR ENGINEER,RWS Falakata Block ORD/000553/2022-2023 3575/ALD 27/03/2023 540 DILIP MAHATO 553.32 176.15 31.84 35
7 ALIPURDUAR Madarihat Northern Mechanical Division II MADHYA KHAIRBARI PIPED WATER SUPPLY SCHEME , SM/13248 New Supply, delivery, installation, commissioning and Trial run of electro mechanical component along with Cu wound line voltage corrector for Madhya Khairbari Water Supply Scheme TW No.- I,II AND III under NMDII, PHE.Dte,APD. Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 1, Cooch-Behar Mechanical Sub-Division, ORD/001141/2023-2024 2886/NMD-II 17/10/2023 30 M/S BHOWMIK & CO. 29.84 12.18 40.82 60
8 ALIPURDUAR Madarihat Alipurduar Division MADHYA KHAIRBARI PIPED WATER SUPPLY SCHEME , SM/13248 New Conceptualization, design and implementing mass awareness generation through Wall writing at 20 nos. villages (Block - Kalchini) by dissemination of awareness generation IEC messages FHTC, Provision on legal provision damage or illegal connection of PWSS; safe handling & storage of safe water Quality issues, water conservation and WASH related issues as per guideline of JJM at Alipurduar district under Alipurduar Division, PHE Dte, Govt. of West Bengal. (SM/13248) Birpara A.E JUNIOR ENGINEER ORD/000496/2023-2024 752/ALD 12/03/2024 60 M/S SARKAR & CO 4.76 1.68 35.29 100
9 ALIPURDUAR Madarihat Alipurduar Division MADHYA KHAIRBARI PIPED WATER SUPPLY SCHEME , SM/13248 New Continuation work order of the work of "Boring of TW, Cons. Of Pump House, boundary wall, OHR (300 cum) inclu. Soil investigation works, Laying of rising main, distribution system and providing FHTC for MADHYA KHAIRBARI PWSS under Alipurduar Division PHE DTE." (As per approval of SE NBC-I P.H.E. Dte. vide e-file no-DPHE-33014/10/2024-EE(ALI_D) SEC-DPHE (Computer No-974292)) Alipurduar RWS,Birpara A.E JUNIOR ENGINEER,RWS Falakata Block ORD/000200/2024-2025 1914/ALD 26/06/2024 60 DILIP MAHATO 26.54 0.00 0 0
10 ALIPURDUAR Madarihat Alipurduar Division MADHYA KHAIRBARI PIPED WATER SUPPLY SCHEME , SM/13248 New Sinking of Big dia Tube Well (250 x 200 x 150 mm dia) by Modified DTH - ODEX of drilling at Madhya Khairbari PWSS within Madarihat-Birpara Block of RWS SUB-Division under Alipurduar Division, PHE Dte. (SM/13248) Alipurduar RWS JUNIOR ENGINEER,RWS Falakata Block ORD/000237/2024-2025 2297/ALD 07/08/2024 30 EFFLUENT AND WATERTREATMENT ENGINEERS PVT LTD 18.06 0.00 0 0
Total 694.20 190.01 27.37