Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 635.8 113.13 17.79  
1 ALIPURDUAR Falakata Alipurduar Division Khagenhat Piped Water Supply Scheme , SM/18151 New Providing FHTC from existing distribution system as per specification for Khagenhat PWSS under Alipurduar Division, PHE Dte. Birpara A.E RWS Falakata Block ORD/000305/2023-2024 2170/ALD 06/10/2023 60 TAPASH DAS 5.58 0.00 0 0
2 ALIPURDUAR Falakata Alipurduar Division Khagenhat Piped Water Supply Scheme , SM/18151 New Material Requisition To Resource Division RTOR000077/2023-2024 101/ALD 10/01/2024 Resource Division 12.67 0.00 0 0
3 ALIPURDUAR Falakata Alipurduar Division Khagenhat Piped Water Supply Scheme , SM/18151 New Cons. Of tube wells at H/W site by Reverse rotary method of drilling , cons. of pump house and boundary wall at H/W , rising main, distribution line(B) and providing FHTC as per Departmental Design & drawing for Khagenhat PWSS Under Birpara Subdivision, Alipurduar Division PHE DTE. Birpara A.E RWS Falakata Block ORD/000053/2023-2024 422/ALD 24/05/2023 120 MADHAB SAHA 201.45 0.00 0 100
4 ALIPURDUAR Falakata Alipurduar Division Khagenhat Piped Water Supply Scheme , SM/18151 New Cons. of tube wells at 2nd site by Reverse rotary method of drilling, cons. of pump house and boundary wall at 2nd site, rising main, distribution line(C) and providing FHTC as per Departmental Design & drawing for Khagenhat PWSS Under Birpara Subdivision, Alipurduar Division PHE DTE. Birpara A.E RWS Falakata Block ORD/000023/2023-2024 257/ALD 08/05/2023 120 PRAMESH LAMA 176.90 26.11 14.76 10
5 ALIPURDUAR Falakata Alipurduar Division Khagenhat Piped Water Supply Scheme , SM/18151 New Soil investigation at OHR site, constructions of 300 Cum OHR at HW , distribution line and providing FHTC as per Departmental Design & drawing for Khagenhat PWSS Under Birpara Subdivision, Alipurduar Division PHE DTE. Birpara A.E RWS Falakata Block ORD/000022/2023-2024 258/ALD 08/05/2023 180 DILIP MAHATO 217.32 87.02 40.04 20
6 ALIPURDUAR Falakata Northern Mechanical Division II Khagenhat Piped Water Supply Scheme , SM/18151 New Supply, delivery, installation, commissioning and trial run of electro-mechanical components along with Cu wound line voltage corrector for KHAGENHAT water supply scheme, TW no I AND II under JJM under NMD-II, PHE Dte. APD. Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 1, Northern Mechanical Division-II,PHE ORD/000991/2023-2024 2621/NMD-II 25/08/2023 30 ASHOKE ADHIKARY 21.88 0.00 0 40
Total 635.81 113.14 17.79