Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
13 1,725.35 362.94 21.04  
1 ALIPURDUAR Falakata Alipurduar Division MAIRADANGA PIPED WATER SUPPLY SCHEME , SM/15206 New Material Requisition To Resource Division RTOR000058/2023-2024 2720/ALD 13/12/2023 0 Resource Division 68.94 0.00 0 0
2 ALIPURDUAR Falakata Alipurduar Division MAIRADANGA PIPED WATER SUPPLY SCHEME , SM/15206 New Construction of tube wells (2 nos.) by Reverse rotary method of drilling at HW site and 2nd TW site , Soil investigation at OHR site, constructions of 350 Cum OHR at HW , construction of pump house and boundary wall at H/W and 2nd site, laying of rising main, distribution line and providing FHTC as per Departmental Design & drawing for MAIRADANGA PWSS Under Birpara Subdivision, Alipurduar Division PHE DTE. Birpara A.E Birpara Sub Division ORD/000030/2023-2024 334/ALD 16/05/2023 720 MESSRS A.B.G CONSTRUCTION 653.77 362.94 55.51 65
3 ALIPURDUAR Falakata Alipurduar Division MAIRADANGA PIPED WATER SUPPLY SCHEME , SM/15206 New Material Requisition To Resource Division RTOR000096/2023-2024 120/ALD 10/01/2024 0 Resource Division 15.91 0.00 0 0
4 ALIPURDUAR Falakata Northern Mechanical Division II MAIRADANGA PIPED WATER SUPPLY SCHEME , SM/15206 New New Servivce Connection for Marindanga PH NO-I PWSS BILL/00985/2024-2025 BP-279/24-25 22/08/2024 0 WBSEDCL 7.07 0.00 0 0
5 ALIPURDUAR Falakata Northern Mechanical Division II MAIRADANGA PIPED WATER SUPPLY SCHEME , SM/15206 New New Service Connection for Mairadanga PH NO-II PWSS BILL/00984/2024-2025 BP-278/24-25 22/08/2024 0 WBSEDCL 5.22 0.00 0 0
6 ALIPURDUAR Falakata Northern Mechanical Division II MAIRADANGA PIPED WATER SUPPLY SCHEME , SM/15206 New Supply, delivery, installation, commissioning and Trial run of electro mechanical component along with Cu wound line voltage corrector for Mairadanga Water Supply Scheme TW No.-I and II under NMD-II,PHE.Dte,Apd. Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 1, Northern Mechanical Division-II,PHE ORD/000896/2023-2024 2475/NMD-II 11/08/2023 753 SUBODH KUMAR BANIK 21.06 0.00 0 80
7 ALIPURDUAR Falakata Alipurduar Division MAIRADANGA PIPED WATER SUPPLY SCHEME , SM/15206 New Construction of slab culvert, pathway and other allied works at 3rd TW Site, painting existing boundary wall, pump house, roof treatment, plinth protection at 2nd TW site of Chhoto Salkumar WSS adjacent to Mairadanga PWSS including gap filling in distribution line (90mm dia) under Alipurduar Division, PHE Dte. Birpara A.E RWS Falakata Block ORD/000354/2023-2024 2606/ALD 04/12/2023 692 ASSOCIATE CONSTRUCTION COMPANY 23.88 0.00 0 95
8 ALIPURDUAR Falakata Alipurduar Division MAIRADANGA PIPED WATER SUPPLY SCHEME , SM/15206 New Supplying and Laying of Water supply line (using HDD/micro tunneling machine) for supply of drinking water in different areas of Alipurduar district under Alipurduar Division PHE Dte. Birpara A.E,HQ-A.E RWS Falakata Block,RWS Kumargram Block ORD/000464/2024-2025 5287/ALD 07/03/2025 240 APEX ENGINEERING 74.36 0.00 0 65
9 ALIPURDUAR Falakata Northern Mechanical Division II MAIRADANGA PIPED WATER SUPPLY SCHEME , SM/15206 New Yard lighting arrangement at Head Work Site for Different PWSS (KADAMBINI TG and Others) under JJM in the BLOCK: Falakata, DISTRICT: ALIPURDUAR under NMD-II,PHE Dte. Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 1, Northern Mechanical Division-II,PHE ORD/000137/2025-2026 1346/NMD-II 19/06/2025 30 M/S SAJAHAN CHOWDHURY 23.98 0.00 0 0
10 ALIPURDUAR Falakata Northern Mechanical Division II MAIRADANGA PIPED WATER SUPPLY SCHEME , SM/15206 New Solarization of grid connected pumping installation at Different PWSS at Falakata Block in the dist.of Alipurduar under JJM programme under Northern Mechanical Division-II, PHE Dte Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 1, Northern Mechanical Division-II,PHE ORD/000134/2025-2026 1344/NMD-II 19/06/2025 90 M/S SAJAHAN CHOWDHURY 42.58 0.00 0 0
11 ALIPURDUAR Falakata Northern Mechanical Division II MAIRADANGA PIPED WATER SUPPLY SCHEME , SM/15206 New Implementation of Affordable IoT-Enabled Water Service Delivery Measurement and Monitoring Sensing System for Rural Deployment in the Proposed Villages Under Different Water Supply Schemes at Diferrent Block of Alipurduar District in West Bengal Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 1, Cooch-Behar Mechanical Sub-Division,,Junior Engineer 1, Northern Mechanical Division-II,PHE ,Junior Engineer 2,Alipurduar Mechanical sub-division,PH ORD/000062/2025-2026 1155/NMD-II 19/05/2025 180 WEBEL TECHNOLOGY LIMITED 726.15 0.00 0 0
12 ALIPURDUAR Falakata Alipurduar Division MAIRADANGA PIPED WATER SUPPLY SCHEME , SM/15206 New Laying of additional DI & HDPE pipeline, Costruction of Sluice Valve chamber & other works for Providing FHTC at Mairadanga PWSS under Alipurduar Division, PHE Dte. Birpara A.E Birpara Sub Division ORD/000051/2025-2026 677/ALD 21/05/2025 90 ANIRBAN DEY SARKAR CONSTRUCTION 44.30 0.00 0 0
13 ALIPURDUAR Falakata Alipurduar Division MAIRADANGA PIPED WATER SUPPLY SCHEME , SM/15206 New Providing Functional Tap Connection (FHTC) in connection with Jaldhara/JalSwapna for Falakata Block under Alipurduar Division, PHE Dte. (Pin point site of the FHTC will be given at the time of issue of work order) Birpara A.E RWS Falakata Block ORD/000130/2025-2026 1629/ALD 04/08/2025 60 NARENDRA BHADANI. 18.13 0.00 0 0
Total 1,725.33 362.94 21.04