Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
15 1,412.42 220.71 15.63  
1 ALIPURDUAR Kumargram Northern Mechanical Division II BARUIPARA AND ADJOINING MOUZAS PIPED WATER SUPPLY SCHEME , SM/13241 New Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for BARUIPARA TG water supply scheme, TW no I and II under Northern Mechanical Division-II, PHE Dte.Alipurduar. Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 1, Cooch-Behar Mechanical Sub-Division, ORD/000831/2023-2024 2412/NMD-II 10/08/2023 30 A.S. ENTERPRISE 18.42 0.00 0 0
2 ALIPURDUAR Kumargram Alipurduar Division BARUIPARA AND ADJOINING MOUZAS PIPED WATER SUPPLY SCHEME , SM/13241 New Providing balance FHTC for Baruipara PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division Alipurduar Sub Division ORD/000211/2023-2024 1565/ALD 24/08/2023 30 RAMEN DEY & CO 4.89 0.00 0 0
3 ALIPURDUAR Kumargram Alipurduar Division BARUIPARA AND ADJOINING MOUZAS PIPED WATER SUPPLY SCHEME , SM/13241 New Material Requisition To Resource Division RTOR000033/2023-2024 1278/ALD 11/08/2023 0 Resource Division 12.57 0.00 0 0
4 ALIPURDUAR Kumargram Alipurduar Division BARUIPARA AND ADJOINING MOUZAS PIPED WATER SUPPLY SCHEME , SM/13241 New Supply of DI pipe & CI special for Baruipara PWSS under Alipurduar Division PHE Dte. Alipurduar Sadar Sub Division Birpara Sub Division ORD/000045/2023-2024 391/ALD 19/05/2023 30 HARI CONSTRUCTION 34.33 34.27 99.83 90
5 ALIPURDUAR Kumargram Alipurduar Division BARUIPARA AND ADJOINING MOUZAS PIPED WATER SUPPLY SCHEME , SM/13241 New Material Requisition To Resource Division RTOR000103/2023-2024 127/ALD 10/01/2024 0 Resource Division 8.85 0.00 0 0
6 ALIPURDUAR Kumargram Alipurduar Division BARUIPARA AND ADJOINING MOUZAS PIPED WATER SUPPLY SCHEME , SM/13241 New Material Requisition To Resource Division RTOR000044/2024-2025 4260/ALD 13/12/2024 0 Resource Division 13.75 0.00 0 0
7 ALIPURDUAR Kumargram Northern Mechanical Division II BARUIPARA AND ADJOINING MOUZAS PIPED WATER SUPPLY SCHEME , SM/13241 New New Service Connection Charges for Baruipara pwss PH NO-II BILL/00860/2024-2025 BP-261/24-25 09/08/2024 0 WBSEDCL 5.87 0.00 0 0
8 ALIPURDUAR Kumargram Northern Mechanical Division II BARUIPARA AND ADJOINING MOUZAS PIPED WATER SUPPLY SCHEME , SM/13241 New New Service Connection Charges for Baruipara pwss PH NO-I under NMD-II BILL/01181/2024-2025 BP-326/24-25 04/10/2024 0 WBSEDCL 5.85 0.00 0 0
9 ALIPURDUAR Kumargram Alipurduar Division BARUIPARA AND ADJOINING MOUZAS PIPED WATER SUPPLY SCHEME , SM/13241 New Cons. of pump house and Sinking of 250 mm x 200 mm X 150 mtr Big dia TW at HW site and 2nd site, LDS with UPVC pipeline, Cons. of 200 Cum OHR as per Departmental Design and drawing inclu. Soil testing, providing FHTC and others allied works for BARUIPARA PWSS under Alipurduar Division PHE DTE. Alipurduar Sadar Sub Division Alipurduar Sub Division ORD/000429/2022-2023 2856/ALD 17/01/2023 985 TAPAN CHANDA 403.77 186.44 46.17 80
10 ALIPURDUAR Kumargram Northern Mechanical Division II BARUIPARA AND ADJOINING MOUZAS PIPED WATER SUPPLY SCHEME , SM/13241 New Solarization of grid connected pumping installation at Different PWSS at Kumargram Block in the dist.of Alipurduar under JJM programme under Northern Mechanical Division-II, PHE Dte. Assistant Engineer,Alipurduar Mechanical Sub-Division,P ORD/001206/2024-2025 820/NMD-II 06/03/2025 30 WATER TECH 29.68 0.00 0 0
11 ALIPURDUAR Kumargram Alipurduar Division BARUIPARA AND ADJOINING MOUZAS PIPED WATER SUPPLY SCHEME , SM/13241 New Supplying and Laying of Water supply line (using HDD/micro tunneling machine) for supply of drinking water in different areas of Alipurduar district under Alipurduar Division PHE Dte. Birpara A.E,HQ-A.E RWS Falakata Block,RWS Kumargram Block ORD/000464/2024-2025 5287/ALD 07/03/2025 240 APEX ENGINEERING 74.36 0.00 0 65
12 ALIPURDUAR Kumargram Alipurduar Division BARUIPARA AND ADJOINING MOUZAS PIPED WATER SUPPLY SCHEME , SM/13241 New Providing Functional Tap Connection (FHTC) in connection with Jaldhara/JalSwapna for Kumargram Block under Alipurduar Division, PHE Dte. (Pin point site of the FHTC will be given at the time of issue of work order) Alipurduar Sadar Sub Division Alipurduar Sub Division ORD/000081/2025-2026 1049/ALD 17/06/2025 60 MOTI INDUSTRIES 18.14 0.00 0 0
13 ALIPURDUAR Kumargram Northern Mechanical Division II BARUIPARA AND ADJOINING MOUZAS PIPED WATER SUPPLY SCHEME , SM/13241 New Implementation of Affordable IoT-Enabled Water Service Delivery Measurement and Monitoring Sensing System for Rural Deployment in the Proposed Villages Under Different Water Supply Schemes at Diferrent Block of Alipurduar District in West Bengal Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 1, Cooch-Behar Mechanical Sub-Division,,Junior Engineer 1, Northern Mechanical Division-II,PHE ,Junior Engineer 2,Alipurduar Mechanical sub-division,PH ORD/000062/2025-2026 1155/NMD-II 19/05/2025 180 WEBEL TECHNOLOGY LIMITED 726.15 0.00 0 0
14 ALIPURDUAR Kumargram Alipurduar Division BARUIPARA AND ADJOINING MOUZAS PIPED WATER SUPPLY SCHEME , SM/13241 New Laying of new UPVC/DI Pipeline for interconnection in the distribution system and bridge/culvert crossing and other allied works in connection with Baruipara PWSS Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division Alipurduar Sub Division ORD/000050/2025-2026 675/ALD 21/05/2025 90 TAPAN CHANDA 29.05 0.00 0 50
15 ALIPURDUAR Kumargram Northern Mechanical Division II BARUIPARA AND ADJOINING MOUZAS PIPED WATER SUPPLY SCHEME , SM/13241 New Yard lighting arrangement at Head Work Site for Different PWSS (PASCHIM CHENGMARI and others) under JJM in the BLOCK: Kumargram, DISTRICT: ALIPURDUAR under NMD-II,PHE Dte. Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 1, Cooch-Behar Mechanical Sub-Division, ORD/000138/2025-2026 1347/NMD-II 19/06/2025 30 S.K ENTERPRISE 26.74 0.00 0 0
Total 1,412.41 220.71 15.63