1 |
ALIPURDUAR |
Falakata |
Alipurduar Division |
ETHELBARI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME , SM/13449 |
New |
Material Requisition To Resource Division |
|
|
RTOR000044/2022-2023 |
3486/ALD |
23/03/2023 |
|
Resource Division |
11.43 |
0.00 |
0 |
0 |
2 |
ALIPURDUAR |
Falakata |
Alipurduar Division |
ETHELBARI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME , SM/13449 |
New |
Construction of Rig Bored tubewells (1 nos.) by Reverse rotary method of drilling at HW site , construction of pump house and boundary wall at H/W, laying of rising main, distribution line and providing FHTC as per Departmental Design & drawing for Ethelbari Tea Garden PWSS (zone-2) Under Birpara Subdivision, Alipurduar Division PHE DTE. |
Birpara A.E |
Alipurduar Sub Division |
ORD/000395/2022-2023 |
2660/ALD |
22/12/2022 |
600 |
M/S DUTTA AND CO |
87.73 |
39.95 |
45.54 |
26 |
3 |
ALIPURDUAR |
Falakata |
Northern Mechanical Division II |
ETHELBARI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME , SM/13449 |
New |
QUOTATION FOR NEW SERVICE CONNECTION AT ETHELBARI TG TW NO-I,Z-II |
|
|
BILL/00067/2023-2024 |
BP-2023-24-62 |
13/05/2023 |
|
WBSEDCL |
1.60 |
0.00 |
0 |
0 |
4 |
ALIPURDUAR |
Falakata |
Northern Mechanical Division II |
ETHELBARI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME , SM/13449 |
New |
QUOTATION FOR NEW SERVICE CONNECTION AT ETHELBARI TG TW NO-I,Z-I |
|
|
BILL/00069/2023-2024 |
BP-2023-24-61 |
13/05/2023 |
|
WBSEDCL |
1.60 |
0.00 |
0 |
0 |
5 |
ALIPURDUAR |
Falakata |
Northern Mechanical Division II |
ETHELBARI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME , SM/13449 |
New |
QUOTATION FOR NEW SERVICE CONNECTION AT ETHELBARI TG TW NO-II,Z-I |
|
|
BILL/00068/2023-2024 |
BP-2023-24-63 |
13/05/2023 |
|
WBSEDCL |
1.60 |
0.00 |
0 |
0 |
6 |
ALIPURDUAR |
Falakata |
Alipurduar Division |
ETHELBARI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME , SM/13449 |
New |
Providing FHTC from existing distribution system as per specification for Ethelbari PWSS under Alipurduar Division, PHE Dte.
|
Birpara A.E |
Alipurduar Sub Division |
ORD/000260/2023-2024 |
1878/ALD |
07/09/2023 |
30 |
NARENDRA BHADANI. |
3.87 |
0.00 |
0 |
0 |
7 |
ALIPURDUAR |
Falakata |
Alipurduar Division |
ETHELBARI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME , SM/13449 |
New |
Material Requisition To Resource Division |
|
|
RTOR000057/2023-2024 |
2719/ALD |
13/12/2023 |
|
Resource Division |
60.01 |
0.00 |
0 |
0 |
8 |
ALIPURDUAR |
Falakata |
Alipurduar Division |
ETHELBARI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME , SM/13449 |
New |
Material Requisition To Resource Division |
|
|
RTOR000068/2023-2024 |
2781/ALD |
18/12/2023 |
|
Resource Division |
11.43 |
0.00 |
0 |
0 |
9 |
ALIPURDUAR |
Falakata |
Northern Mechanical Division II |
ETHELBARI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME , SM/13449 |
New |
Additional Quotation Charges for Ethelbari Zone-II,PH NO-I PWSS |
|
|
BILL/00826/2024-2025 |
BP-271/24-25 |
12/08/2024 |
|
WBSEDCL |
6.53 |
0.00 |
0 |
null |
10 |
ALIPURDUAR |
Falakata |
Alipurduar Division |
ETHELBARI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME , SM/13449 |
New |
Gap filling by HDPE/DI pipe in Ethelbari TG under Birpara Sub-Division, Alipurduar Division, PHE Dte. |
Birpara A.E |
Alipurduar Sub Division |
ORD/000392/2023-2024 |
203/ALD |
16/01/2024 |
60 |
BHAGWATI BHUJEL |
14.02 |
0.00 |
0 |
85 |
11 |
ALIPURDUAR |
Falakata |
Alipurduar Division |
ETHELBARI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME , SM/13449 |
New |
Cons. of Rig bored TW(2nos) by Reverse Rotary method of drilling at HW and 2nd site, cons of 200 cum OHR at HW including soil testing, cons. of P/H and B/W at HW,2nd site, Laying of rising main, distribution line and providing FHTC as per Departmental Design & drawing for ETHELBARI TG PWSS (ZONE-I)under Birpara Sub-Division, Alipurduar Division, PHE DTE. |
Birpara A.E |
Alipurduar Sub Division |
ORD/000434/2022-2023 |
2861/ALD |
17/01/2023 |
180 |
DILIP MAHATO |
385.44 |
241.33 |
62.61 |
90 |
12 |
ALIPURDUAR |
Falakata |
Northern Mechanical Division II |
ETHELBARI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME , SM/13449 |
New |
Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for Ethelbari water supply scheme, TW no I and II of Zone-I under Northern Mechanical Division-II, PHE Dte.Alipurduar. |
Assistant Engineer,Alipurduar Mechanical Sub-Division,P |
Junior Engineer 1, Northern Mechanical Division-II,PHE |
ORD/000677/2023-2024 |
2082/NMD-II |
26/07/2023 |
30 |
DIAMOND ELECTRICAL WORKS |
20.86 |
0.00 |
0 |
100 |
13 |
ALIPURDUAR |
Falakata |
Northern Mechanical Division II |
ETHELBARI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME , SM/13449 |
New |
Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for Ethelbari water supply scheme, TW no I of Zone-II under Northern Mechanical Division-II, PHE Dte.Alipurduar. |
Assistant Engineer,Alipurduar Mechanical Sub-Division,P |
Junior Engineer 1, Northern Mechanical Division-II,PHE |
ORD/001101/2023-2024 |
2834/NMD-II |
12/10/2023 |
30 |
MITRA ENTERPRISE |
9.72 |
0.00 |
0 |
40 |
14 |
ALIPURDUAR |
Falakata |
Northern Mechanical Division II |
ETHELBARI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME , SM/13449 |
New |
Solarization of grid connected pumping installation at Different PWSS at Falakata Block in the dist.of Alipurduar under JJM programme under Northern Mechanical Division-II, PHE Dte. |
Assistant Engineer,Alipurduar Mechanical Sub-Division,P |
|
ORD/001207/2024-2025 |
821/NMD-II |
06/03/2025 |
30 |
THE BUSINESS ENGINEERS INDIA |
28.94 |
0.00 |
0 |
0 |