1 |
Alipurduar Division |
ALIPURDUAR |
|
Procurement of Chemicals & Consumables, Glassware for Laboratories, Consumables for OMAS, OMAS Kit & Annual Maintenance contract of Computer, Printer, UPS & other peripherals for Laboratories. ,SM/06623 |
Support |
|
|
|
05/02/2020 |
23/06/2021 |
31/03/2024 |
29/01/2024 |
6 |
0 |
21.16 |
21.01 |
99 |
99 |
2 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Jateswar Water Supply Scheme (Phase-1),SM/07057 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
RWS Falakata Block |
25/11/2020 |
01/12/2020 |
31/03/2024 |
29/01/2024 |
14 |
2,066 |
99.09 |
50.89 |
99 |
51 |
3 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Bakla Piped Water Supply Scheme (Phase-2),SM/07058 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
25/11/2020 |
04/01/2021 |
31/03/2024 |
29/02/2024 |
6 |
1,036 |
82.69 |
60.39 |
72 |
73 |
4 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Chotosalkumar Piped Water Supply Scheme (Phase-1),SM/07059 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
RWS Falakata Block |
25/11/2020 |
03/05/2022 |
31/03/2024 |
29/01/2024 |
11 |
967 |
97.58 |
93.14 |
43 |
95 |
5 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Patlakhawa Piped Water Supply Scheme (Phase-1),SM/07060 |
Retrofitting |
Birpara Sub-Division |
Alipurduar RWS |
Birpara Sub Division |
25/11/2020 |
01/06/2022 |
31/03/2024 |
29/01/2024 |
9 |
1,400 |
86.77 |
85.11 |
98 |
98 |
6 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Patlakhawa Piped Water Supply Scheme (Phase-2),SM/07061 |
Retrofitting |
Birpara Sub-Division |
Alipurduar RWS |
Birpara Sub Division |
25/11/2020 |
01/12/2020 |
31/03/2024 |
29/02/2024 |
7 |
1,581 |
93.85 |
82.47 |
64 |
88 |
7 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Uttar Kamakshyaguri Piped Water Supply Scheme (Phase-1),SM/07062 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
Alipurduar Sub Division |
25/11/2020 |
25/12/2020 |
31/03/2024 |
29/01/2024 |
10 |
2,826 |
87.86 |
82.08 |
99 |
93 |
8 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Salsalabari Piped Water Supply Scheme (Phase-2),SM/07063 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
25/11/2020 |
01/12/2020 |
31/03/2024 |
29/01/2024 |
8 |
1,709 |
91.90 |
63.47 |
99 |
69 |
9 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Hantupara Tea Garden Piped Water Supply Scheme,SM/07064 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
Birpara Sub Division |
25/11/2020 |
25/12/2020 |
31/03/2024 |
29/01/2024 |
9 |
1,612 |
99.04 |
73.51 |
99 |
74 |
10 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Kaijali Basty Piped Water Supply Scheme (Phase-2),SM/07065 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
25/11/2020 |
01/12/2020 |
31/03/2024 |
29/02/2024 |
7 |
596 |
73.85 |
24.29 |
68 |
33 |
11 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Lankapara Water Supply Scheme (Phase-2),SM/07066 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
Birpara Sub Division |
25/11/2020 |
26/12/2020 |
31/03/2024 |
29/01/2024 |
10 |
2,682 |
80.75 |
77.71 |
99 |
96 |
12 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Radharani T.G Water Supply Scheme (Phase-1),SM/07067 |
Retrofitting |
Alipurduar Division |
HQ-A.E |
RWS Kalchini Block |
25/11/2020 |
15/01/2021 |
31/03/2024 |
29/01/2024 |
10 |
345 |
98.86 |
88.90 |
99 |
90 |
13 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Dimdima T.G Water Supply Scheme (Phase-1),SM/07068 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Birpara A.E |
Alipurduar Sub Division |
25/11/2020 |
05/01/2021 |
31/03/2024 |
29/01/2024 |
8 |
1,509 |
85.62 |
67.79 |
81 |
79 |
14 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Dimdima T.G Water Supply Scheme (Phase-2),SM/07069 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Birpara A.E |
Alipurduar Sub Division |
25/11/2020 |
05/01/2021 |
31/03/2024 |
29/01/2024 |
5 |
1,509 |
61.34 |
28.13 |
99 |
46 |
15 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Birpara (APD) Piped Water Supply Scheme (Phase-2),SM/07121 |
Retrofitting |
Birpara Sub-Division |
Alipurduar RWS |
Birpara Sub Division |
26/11/2020 |
07/12/2020 |
31/03/2024 |
29/01/2024 |
7 |
2,686 |
82.27 |
72.24 |
99 |
88 |
16 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-III, Phase-2),SM/07122 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
Alipurduar Sub Division |
26/11/2020 |
26/12/2020 |
31/03/2024 |
29/01/2024 |
5 |
1,051 |
98.68 |
97.80 |
91 |
99 |
17 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-III, Phase-1),SM/07123 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
Alipurduar Sub Division |
26/11/2020 |
26/12/2020 |
31/03/2024 |
29/01/2024 |
10 |
1,051 |
98.96 |
86.58 |
91 |
87 |
18 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Purba Chenpani Piped Water Supply Scheme (Phase-2),SM/07124 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
Alipurduar Sub Division |
26/11/2020 |
25/12/2020 |
31/03/2024 |
29/01/2024 |
3 |
1,477 |
55.28 |
27.64 |
96 |
50 |
19 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-II, Phase-2),SM/07125 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
Alipurduar Sub Division |
26/11/2020 |
26/12/2020 |
31/03/2024 |
29/01/2024 |
5 |
1,051 |
90.17 |
0.00 |
91 |
0 |
20 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-II, Phase-1),SM/07126 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
Alipurduar Sub Division |
26/11/2020 |
26/12/2020 |
31/03/2024 |
29/01/2024 |
6 |
1,051 |
93.00 |
79.18 |
91 |
85 |
21 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-I, Phase-2),SM/07127 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
Alipurduar Sub Division |
26/11/2020 |
26/12/2020 |
31/03/2024 |
29/01/2024 |
8 |
1,051 |
66.37 |
33.19 |
99 |
50 |
22 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Tapshikatha Piped Water Supply Scheme (Phase-2),SM/07128 |
Retrofitting |
Birpara Sub-Division |
Alipurduar RWS |
Birpara Sub Division |
26/11/2020 |
25/12/2020 |
31/03/2024 |
29/02/2024 |
8 |
895 |
62.07 |
31.59 |
65 |
51 |
23 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Jagijhora Barabak Piped Water Supply Scheme ,SM/07129 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
RWS Falakata Block |
26/11/2020 |
01/12/2020 |
31/03/2024 |
29/01/2024 |
6 |
1,328 |
72.16 |
55.12 |
56 |
76 |
24 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
FHTC under Jaldhara / Jalswapna including retrofitting of existing distribution system under DHUMCHIPARA T.G. Piped Water Supply Scheme,SM/07130 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
Birpara Sub Division |
26/11/2020 |
26/12/2020 |
31/03/2024 |
29/01/2024 |
10 |
1,568 |
94.15 |
74.22 |
47 |
79 |
25 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
FHTC under Jaldhara / Jalswapna including retrofitting of existing distribution system under DHEKLAPARA T.G. Piped Water Supply Scheme,SM/07131 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
Birpara Sub Division |
26/11/2020 |
26/12/2020 |
31/03/2024 |
29/01/2024 |
7 |
567 |
73.16 |
42.13 |
50 |
58 |
26 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
FHTC under Jaldhara / Jalswapna including retrofitting of existing distribution system under DALMORE RAMJHORA T.G. Piped Water Supply Scheme (Phase-2),SM/07132 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
Birpara Sub Division |
26/11/2020 |
26/12/2020 |
31/03/2024 |
29/01/2024 |
8 |
1,847 |
88.70 |
8.56 |
22 |
10 |
27 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
FHTC under Jaldhara / Jalswapna including retrofitting of existing distribution system under DALMORE RAMJHORA T.G. Piped Water Supply Scheme (Phase-1),SM/07133 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
Birpara Sub Division |
26/11/2020 |
26/12/2020 |
31/03/2024 |
29/01/2024 |
11 |
1,169 |
95.65 |
93.42 |
99 |
98 |
28 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Purba Chenpani Piped Water Supply Scheme (Phase-1),SM/07134 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
Alipurduar Sub Division |
26/11/2020 |
25/12/2020 |
31/03/2024 |
29/01/2024 |
4 |
1,477 |
89.44 |
36.24 |
98 |
41 |
29 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Paschim Khairbari Piped Water Supply Scheme (Phase-1) ,SM/07135 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
Birpara Sub Division |
26/11/2020 |
25/12/2020 |
31/03/2024 |
29/01/2024 |
6 |
822 |
87.03 |
70.35 |
98 |
81 |
30 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Paschim Khairbari Piped Water Supply Scheme (Phase-2) ,SM/07136 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
Birpara Sub Division |
26/11/2020 |
25/12/2020 |
31/03/2024 |
29/01/2024 |
5 |
822 |
80.05 |
57.13 |
87 |
71 |
31 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Dalimpur Piped Water Supply Scheme (Phase-1) ,SM/07137 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
RWS Falakata Block |
26/11/2020 |
01/12/2020 |
31/03/2024 |
29/01/2024 |
10 |
1,073 |
97.16 |
66.14 |
99 |
68 |
32 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Lankapara Piped Water Supply Scheme (Phase-1) ,SM/07138 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
Birpara Sub Division |
26/11/2020 |
26/12/2020 |
31/03/2024 |
29/01/2024 |
8 |
2,682 |
96.46 |
72.58 |
99 |
75 |
33 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Bakla Piped Water Supply Scheme (Phase-1),SM/07174 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
04/12/2020 |
04/01/2021 |
31/03/2024 |
29/01/2024 |
6 |
1,388 |
76.33 |
51.46 |
99 |
67 |
34 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Birpara (APD) Piped Water Supply Scheme (Phase-1),SM/07175 |
Retrofitting |
Birpara Sub-Division |
Alipurduar RWS |
Birpara Sub Division |
04/12/2020 |
07/12/2020 |
31/03/2024 |
29/01/2024 |
10 |
2,686 |
91.69 |
86.22 |
91 |
94 |
35 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Chotosalkumar Piped Water Supply Scheme (Phase-2),SM/07176 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
RWS Falakata Block |
04/12/2020 |
19/12/2020 |
31/03/2024 |
29/01/2024 |
14 |
1,621 |
70.54 |
33.59 |
80 |
48 |
36 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Salsalabari Piped Water Supply Scheme (Phase-1),SM/07177 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
04/12/2020 |
25/12/2020 |
31/03/2024 |
29/01/2024 |
8 |
761 |
68.96 |
66.65 |
99 |
97 |
37 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Munshipara Piped Water Supply Scheme (Phase-1),SM/07178 |
Retrofitting |
Birpara Sub-Division |
Alipurduar RWS |
Birpara Sub Division |
04/12/2020 |
25/12/2020 |
31/03/2024 |
29/01/2024 |
10 |
1,419 |
98.08 |
91.98 |
72 |
94 |
38 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Munshipara Piped Water Supply Scheme (Phase-2),SM/07179 |
Retrofitting |
Birpara Sub-Division |
Alipurduar RWS |
Birpara Sub Division |
04/12/2020 |
25/12/2020 |
31/03/2024 |
29/01/2024 |
7 |
1,419 |
69.14 |
41.99 |
72 |
61 |
39 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Totopara Piped Water Supply Scheme,SM/07180 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
RWS Madarihat - Birpara Block |
04/12/2020 |
25/12/2020 |
31/03/2024 |
29/01/2024 |
4 |
624 |
64.83 |
11.34 |
42 |
17 |
40 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Kaijali Basty Piped Water Supply Scheme (Phase-1),SM/07181 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
Alipurduar Sub Division |
04/12/2020 |
25/12/2020 |
31/03/2024 |
29/01/2024 |
6 |
571 |
89.66 |
88.39 |
98 |
99 |
41 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Loknathpur and Amp Adj. Mouza Piped Water Supply Scheme (Phase-1),SM/07182 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
04/12/2020 |
25/12/2020 |
31/03/2024 |
29/01/2024 |
5 |
870 |
98.81 |
95.63 |
99 |
97 |
42 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Loknathpur and Amp Adj. Mouza Piped Water Supply Scheme (Phase-2),SM/07183 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
04/12/2020 |
25/12/2020 |
31/03/2024 |
29/01/2024 |
3 |
870 |
56.02 |
28.89 |
87 |
52 |
43 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Jashodanga Piped Water Supply Scheme,SM/07184 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
04/12/2020 |
25/12/2020 |
31/03/2024 |
29/01/2024 |
8 |
901 |
82.41 |
64.27 |
98 |
78 |
44 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-1,Phase-1),SM/07185 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
Alipurduar Sub Division |
04/12/2020 |
26/12/2020 |
31/03/2024 |
29/01/2024 |
11 |
1,051 |
82.87 |
77.65 |
96 |
94 |
45 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Radharani T.G Piped Water Supply Scheme (Phase-2),SM/07186 |
Retrofitting |
Alipurduar Division |
HQ-A.E |
RWS Kalchini Block |
04/12/2020 |
15/01/2021 |
31/03/2024 |
29/01/2024 |
14 |
345 |
99.29 |
80.34 |
99 |
81 |
46 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Banchukamari Piped Water Supply Scheme (Phase-1),SM/07187 |
Retrofitting |
Birpara Sub-Division |
Alipurduar RWS |
Birpara Sub Division |
04/12/2020 |
25/12/2020 |
31/03/2024 |
29/02/2024 |
9 |
828 |
73.94 |
56.02 |
75 |
76 |
47 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Banchukamari Piped Water Supply Scheme (Phase-2),SM/07188 |
Retrofitting |
Birpara Sub-Division |
Alipurduar RWS |
Birpara Sub Division |
04/12/2020 |
25/12/2020 |
31/03/2024 |
29/02/2024 |
4 |
828 |
73.94 |
51.99 |
75 |
70 |
48 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Tapshikhata Piped Water Supply Scheme (Phase-1),SM/07189 |
Retrofitting |
Birpara Sub-Division |
Alipurduar RWS |
Birpara Sub Division |
04/12/2020 |
25/12/2020 |
31/03/2024 |
29/01/2024 |
11 |
895 |
97.67 |
97.67 |
81 |
100 |
49 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Paitkapara T.G Piped Water Supply Scheme,SM/07190 |
Retrofitting |
Birpara Sub-Division |
Alipurduar RWS |
Birpara Sub Division |
04/12/2020 |
19/12/2020 |
31/03/2024 |
29/01/2024 |
8 |
1,026 |
83.82 |
55.17 |
98 |
66 |
50 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Dhaolajhora T.G Piped Water Supply Scheme,SM/07191 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
04/12/2020 |
04/01/2021 |
31/03/2024 |
29/02/2024 |
3 |
788 |
62.80 |
30.70 |
97 |
49 |
51 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Madhu T.G Piped Water Supply Scheme,SM/07192 |
Retrofitting |
Birpara Sub-Division |
HQ-A.E |
Birpara Sub Division |
04/12/2020 |
04/01/2021 |
31/03/2024 |
29/01/2024 |
8 |
1,000 |
83.76 |
80.90 |
99 |
97 |
52 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Jayanti Piped Water Supply Scheme,SM/07193 |
Retrofitting |
Birpara Sub-Division |
HQ-A.E |
Birpara Sub Division |
04/12/2020 |
04/01/2021 |
31/03/2024 |
29/01/2024 |
6 |
608 |
60.86 |
27.95 |
98 |
46 |
53 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Dima T.G Piped Water Supply Scheme,SM/07194 |
Retrofitting |
Birpara Sub-Division |
HQ-A.E |
Birpara Sub Division |
04/12/2020 |
04/01/2021 |
31/03/2024 |
29/01/2024 |
7 |
1,298 |
98.15 |
90.29 |
98 |
92 |
54 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Jayanti T.G Piped Water Supply Scheme,SM/07195 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
Alipurduar Sub Division |
04/12/2020 |
25/12/2020 |
31/03/2024 |
29/01/2024 |
4 |
1,222 |
98.84 |
92.99 |
99 |
94 |
55 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Rahimabad T.G Piped Water Supply Scheme,SM/07196 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
Alipurduar Sub Division |
04/12/2020 |
04/01/2021 |
31/03/2024 |
29/01/2024 |
4 |
803 |
67.24 |
46.39 |
98 |
69 |
56 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Gargenda T.G Piped Water Supply Scheme,SM/07197 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
Birpara Sub Division |
04/12/2020 |
25/12/2020 |
31/03/2024 |
29/01/2024 |
7 |
1,121 |
84.07 |
45.84 |
81 |
55 |
57 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Mujnai T.G Piped Water Supply Scheme,SM/07198 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
Birpara Sub Division |
04/12/2020 |
04/01/2021 |
31/03/2024 |
29/01/2024 |
7 |
882 |
69.04 |
26.44 |
98 |
38 |
58 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Makrapara T.G Piped Water Supply Scheme,SM/07199 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
Birpara Sub Division |
04/12/2020 |
25/12/2020 |
31/03/2024 |
29/01/2024 |
8 |
688 |
61.63 |
44.58 |
99 |
72 |
59 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
FHTC under Jaldhara/Jal Sapna including retrofitting of existing distribution system under the command area of Jaigaon & Falakata water supply scheme. ,SM/08080 |
Retrofitting |
Alipurduar Division |
HQ-A.E |
RWS Kalchini Block |
04/02/2021 |
05/02/2021 |
31/03/2024 |
01/12/2023 |
75 |
29,206 |
1,224.31 |
847.79 |
72 |
69 |
60 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
FHTC under Jaldhara Jalswapna Including Retrofitting of existing distribution system under the command area of UTTAR MADARIHAT Water Supply Scheme,SM/08880 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Birpara A.E |
Alipurduar Sub Division |
27/09/2021 |
04/10/2021 |
31/03/2024 |
29/01/2024 |
9 |
2,328 |
140.24 |
121.90 |
81 |
87 |
61 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
FHTC under Jaldhara Jalswapna Including Retrofitting of existing distribution system under the command area of UTTAR SISHUBARI Water Supply Scheme,SM/08881 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
Birpara Sub Division |
27/09/2021 |
04/10/2021 |
31/03/2024 |
29/01/2024 |
7 |
874 |
184.32 |
96.26 |
99 |
52 |
62 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
FHTC under Jaldhara Jalswapna Including Retrofitting of existing distribution system under the command area of CHANDIRJHAR Water Supply Scheme,SM/08882 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
Alipurduar Sub Division |
27/09/2021 |
04/10/2021 |
31/03/2024 |
29/01/2024 |
7 |
1,096 |
129.45 |
107.13 |
98 |
83 |
63 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
FHTC under Jaldhara Jalswapna Including Retrofitting of existing distribution system under the command area of SALKUMARHAT Water Supply Scheme,SM/08883 |
Retrofitting |
Birpara Sub-Division |
Alipurduar RWS |
Birpara Sub Division |
27/09/2021 |
04/10/2021 |
31/03/2024 |
29/01/2024 |
8 |
1,393 |
87.85 |
82.80 |
61 |
94 |
64 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
FHTC under Jaldhara Jalswapna Including Retrofitting of existing distribution system under the command area of HASIMARA Water Supply Scheme,SM/08884 |
Retrofitting |
Alipurduar Division |
HQ-A.E |
RWS Kalchini Block |
27/09/2021 |
04/10/2021 |
31/03/2024 |
29/01/2024 |
17 |
2,599 |
398.83 |
332.21 |
77 |
83 |
65 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
AUGMENTATION OF BHOLARDABRI PIPE WATER SUPPLY SCHEME,SM/09883 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
08/12/2021 |
11/01/2022 |
31/03/2024 |
29/01/2024 |
25 |
6,045 |
451.23 |
276.03 |
98 |
61 |
66 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
AUGMENTATION OF PUTIMARI PIPED WATER SUPPLY SCHEME,SM/09884 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
08/12/2021 |
11/01/2022 |
31/03/2024 |
29/03/2024 |
24 |
2,333 |
484.93 |
400.37 |
97 |
83 |
67 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
AUGMENTATION OF BHUTNIRGHAT PIPED WATER SUPPLY SCHEME,SM/09885 |
Augmentation |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Alipurduar Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) |
08/12/2021 |
11/01/2022 |
31/03/2024 |
29/03/2024 |
18 |
3,226 |
449.91 |
376.67 |
95 |
84 |
68 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
REJUVENATION OF MADHYA PAROKATA PIPED WATER SUPPLY SCHEME,SM/09886 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
08/12/2021 |
11/01/2022 |
31/03/2024 |
29/03/2024 |
8 |
2,202 |
257.81 |
190.95 |
98 |
74 |
69 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
REJUVENATION OF HASIMARA WATER SUPPLY SCHEME,SM/09887 |
Augmentation |
Alipurduar Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block |
08/12/2021 |
13/05/2022 |
31/03/2024 |
29/01/2024 |
20 |
0 |
92.50 |
26.03 |
92 |
28 |
70 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
REJUVINATION OF 'DHAOLAJHORA .T.G WATER SUPPLY SCHEME',SM/09888 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
08/12/2021 |
14/01/2022 |
31/03/2024 |
29/03/2024 |
4 |
0 |
43.87 |
21.93 |
62 |
50 |
71 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
REJUVENATION OF 'BAKLA WATER SUPPLY SCHEME',SM/09890 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
08/12/2021 |
11/01/2022 |
31/03/2024 |
29/03/2024 |
3 |
0 |
45.21 |
20.92 |
95 |
46 |
72 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
REJUVENATION OF 'BANCHUKAMARI WATER SUPPLY SCHEME',SM/09891 |
Augmentation |
Birpara Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
08/12/2021 |
11/01/2022 |
31/03/2024 |
29/03/2024 |
6 |
0 |
47.49 |
19.57 |
90 |
41 |
73 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
REJUVINATION OF 'CHANDIRJHAR WATER SUPPLY SCHEME',SM/09892 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
08/12/2021 |
11/01/2022 |
31/03/2024 |
29/01/2024 |
9 |
0 |
47.49 |
31.93 |
99 |
67 |
74 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
REJUVENATION OF 'PURBA CHEPANI WATER SUPPLY SCHEME',SM/09893 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
08/12/2021 |
17/10/2022 |
23/08/2024 |
29/02/2024 |
4 |
0 |
45.22 |
30.26 |
52 |
67 |
75 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
REJUVENATION OF MUNSHIPARA WATER SUPPLY SCHEME,SM/09894 |
Augmentation |
Birpara Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
08/12/2021 |
14/01/2022 |
31/03/2024 |
29/03/2024 |
5 |
0 |
44.01 |
20.22 |
57 |
46 |
76 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
Rejuvenation of Makrapara TG WSS.,SM/09895 |
Augmentation |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
08/12/2021 |
31/01/2022 |
31/03/2024 |
29/01/2024 |
6 |
0 |
45.22 |
42.54 |
73 |
94 |
77 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
REJUVENATION OF DHUMCHIPARA. T.G. WATER SUPPLY SCHEME,SM/09896 |
Augmentation |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
08/12/2021 |
31/01/2022 |
31/03/2024 |
29/02/2024 |
6 |
0 |
45.23 |
15.77 |
89 |
35 |
78 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
REJUVENATION OF BIRPARA(APD) WATER SUPPLY SCHEME,SM/09897 |
Augmentation |
Birpara Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
08/12/2021 |
11/01/2022 |
31/03/2024 |
29/01/2024 |
6 |
0 |
45.48 |
22.82 |
59 |
50 |
79 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
REJUVENATION OF JAYANTI WATER SUPPLY SCHEME',SM/09898 |
Augmentation |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
08/12/2021 |
31/01/2022 |
31/03/2024 |
29/01/2024 |
12 |
608 |
47.48 |
37.43 |
67 |
79 |
80 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
REJUVINATION OF 'JASHODANGA WATER SUPPLY SCHEME',SM/09899 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Cooch-Behar Mechanical Sub-Division, PHE Dte. |
Alipurduar Sub Division,Junior Engineer 1, Northern Mechanical Division-II,PHE Dte. |
08/12/2021 |
31/01/2022 |
31/03/2024 |
29/01/2024 |
6 |
0 |
45.28 |
34.57 |
98 |
76 |
81 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
REJUVENATION OF 'PASCHIM KHAIRBARI WATER SUPPLY SCHEME',SM/09900 |
Augmentation |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
08/12/2021 |
27/12/2021 |
31/03/2024 |
01/12/2023 |
1 |
0 |
45.23 |
2.87 |
5 |
6 |
82 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
REJUVENATION OF HANTUPARA TG WATER SUPPLY SCHEME',SM/09901 |
Augmentation |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
08/12/2021 |
23/02/2022 |
31/03/2024 |
29/02/2024 |
6 |
0 |
44.25 |
31.47 |
89 |
71 |
83 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
REJUVINATION OF ' UTTAR MADARIHAT WATER SUPPLY SCHEME',SM/09902 |
Augmentation |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
08/12/2021 |
11/01/2022 |
20/11/2024 |
01/10/2024 |
5 |
0 |
47.49 |
16.21 |
69 |
34 |
84 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
REJUVENATION OF 'CHOTO SALKUMAR WATER SUPPLY SCHEME',SM/09903 |
Augmentation |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Alipurduar Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) |
08/12/2021 |
14/01/2022 |
31/03/2024 |
29/01/2024 |
10 |
0 |
45.22 |
25.46 |
63 |
56 |
85 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
Rejuvenation Of Dima T.G. W.S.S,SM/09904 |
Augmentation |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
08/12/2021 |
27/12/2021 |
31/03/2024 |
29/01/2024 |
5 |
0 |
44.51 |
13.51 |
39 |
30 |
86 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
REJUVENATION OF 'LOKNATHPUR WATER SUPPLY SCHEME',SM/09905 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
08/12/2021 |
11/01/2022 |
31/03/2024 |
29/01/2024 |
9 |
0 |
45.51 |
4.19 |
99 |
9 |
87 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
Rejuvenation of Gargenda Tea Garden Water Supply Scheme,SM/09906 |
Augmentation |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
08/12/2021 |
31/01/2022 |
31/03/2024 |
29/02/2024 |
2 |
0 |
45.22 |
14.67 |
87 |
32 |
88 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
REJUVENATION OF SALSALABARI WATER SUPPLY SCHEME,SM/09907 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
08/12/2021 |
25/02/2022 |
31/03/2024 |
29/01/2024 |
2 |
0 |
44.74 |
2.39 |
99 |
5 |
89 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
REJUVENATION OF 'TAPSHIKHATA WATER SUPPLY SCHEME',SM/09908 |
Augmentation |
Birpara Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
08/12/2021 |
11/01/2022 |
31/03/2024 |
29/03/2024 |
6 |
0 |
46.31 |
34.82 |
59 |
75 |
90 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
REJUVENATION OF MADHU TG WATER SUPPLY SCHEME,SM/09909 |
Augmentation |
Alipurduar Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
08/12/2021 |
11/01/2022 |
31/03/2024 |
29/01/2024 |
6 |
0 |
45.46 |
34.65 |
61 |
76 |
91 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
REJUVENATION OF PAITKAPARA WATER SUPPLY SCHEME,SM/09910 |
Augmentation |
Birpara Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
08/12/2021 |
27/12/2021 |
31/03/2024 |
29/01/2024 |
3 |
0 |
47.45 |
18.03 |
95 |
38 |
92 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
Dheklapara Tea Garden Area Piped Water Supply Scheme in relation with Chaa Sundari Project.,SM/10038 |
New |
Birpara Sub-Division |
Birpara A.E |
Birpara Sub Division |
19/01/2022 |
21/02/2022 |
31/03/2024 |
29/01/2024 |
3 |
567 |
247.03 |
68.46 |
98 |
28 |
93 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
Torsha Tea Garden Area Piped Water Supply Scheme in relation with Chaa Sundari Project.,SM/10039 |
New |
Alipurduar Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block |
19/01/2022 |
26/04/2022 |
31/03/2024 |
29/01/2024 |
10 |
1,348 |
284.23 |
230.24 |
98 |
81 |
94 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
AUGMENTATION OF NARATHALI PIPED WATER SUPPLY SCHEME,SM/10154 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
11/02/2022 |
14/02/2022 |
31/03/2024 |
29/01/2024 |
23 |
3,764 |
632.84 |
526.81 |
97 |
83 |
95 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
REJUVENATION OF TATPARA PIPED WATER SUPPLY SCHEME,SM/10155 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
11/02/2022 |
24/02/2022 |
24/07/2024 |
01/12/2023 |
7 |
1,040 |
140.66 |
109.66 |
94 |
78 |
96 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
AUGMENTATION OF JATESWAR PIPED WATER SUPPLY SCHEME,SM/10156 |
Augmentation |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Alipurduar Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) |
11/02/2022 |
25/02/2022 |
31/03/2024 |
28/03/2024 |
24 |
1,020 |
706.17 |
419.69 |
84 |
59 |
97 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
AUGMENTATION OF JAGIJHORA BARABAK PIPED WATER SUPPLY SCHEME,SM/10169 |
Augmentation |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Alipurduar Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) |
16/02/2022 |
27/12/2022 |
31/03/2024 |
29/01/2024 |
11 |
1,527 |
378.84 |
79.62 |
90 |
21 |
98 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
REJUVENATION OF UTTAR KAMAKHYAGURI PIPED WATER SUPPLY SCHEME,SM/10170 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
16/02/2022 |
28/02/2022 |
31/03/2024 |
29/01/2024 |
20 |
2,836 |
509.72 |
268.14 |
93 |
53 |
99 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
MATHURA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME,SM/10172 |
New |
Birpara Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
16/02/2022 |
17/02/2022 |
31/03/2024 |
29/03/2024 |
13 |
2,579 |
810.28 |
447.04 |
98 |
55 |
100 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
MADARIHAT TEA GARDEN AREA PIPED WATER SUPPLY SCHEME,SM/10173 |
New |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
16/02/2022 |
17/02/2022 |
31/03/2024 |
29/02/2024 |
22 |
2,277 |
886.25 |
474.01 |
91 |
53 |
101 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
DAKSHIN PAITKAPARA PIPED WATER SUPPLY SCHEME,SM/10174 |
New |
Birpara Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
16/02/2022 |
17/02/2022 |
31/03/2024 |
29/03/2024 |
16 |
1,867 |
732.56 |
463.70 |
95 |
63 |
102 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
SIDHABARI PIED WATER SUPPLY SCHEME,SM/10175 |
New |
Birpara Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
16/02/2022 |
17/02/2022 |
31/03/2024 |
28/03/2024 |
13 |
1,605 |
360.32 |
209.30 |
60 |
58 |
103 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
MECHPARA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME,SM/10176 |
New |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
16/02/2022 |
17/02/2022 |
31/03/2024 |
29/03/2024 |
14 |
1,425 |
426.36 |
51.29 |
56 |
12 |
104 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
JAYBIRPARA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME,SM/10177 |
New |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
16/02/2022 |
17/02/2022 |
31/03/2024 |
29/02/2024 |
9 |
1,248 |
338.59 |
114.19 |
56 |
34 |
105 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
GOPALPUR TEA GARDEN AREA PIPED WATER SUPPLY SCHEME,SM/10178 |
New |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
16/02/2022 |
17/02/2022 |
31/03/2024 |
28/03/2024 |
18 |
1,487 |
577.33 |
267.85 |
82 |
46 |
106 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
CHUNIA JHORA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME,SM/10179 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
16/02/2022 |
17/02/2022 |
31/03/2024 |
29/03/2024 |
10 |
647 |
364.15 |
315.92 |
99 |
87 |
107 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
GANGUTIA TEA GARDEN AREA PIPED WATER SUPPLY SHEME,SM/10180 |
New |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
16/02/2022 |
17/02/2022 |
31/03/2024 |
29/02/2024 |
9 |
1,250 |
376.91 |
176.06 |
85 |
47 |
108 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
AUGMENTATION OF SALKUMARHAT PIPED WATER SUPPLY SCHEME,SM/10316 |
Augmentation |
Birpara Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
04/03/2022 |
02/05/2022 |
02/11/2024 |
29/03/2024 |
11 |
2,393 |
281.05 |
51.28 |
80 |
18 |
109 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
Providing FHTC of existing LDS under command area UTTARLATABARI WSS at Kalchini Block.,SM/10637 |
Augmentation |
Birpara Sub-Division |
HQ-A.E |
Birpara Sub Division |
21/04/2022 |
11/05/2022 |
31/03/2024 |
29/01/2024 |
11 |
3,877 |
252.10 |
124.40 |
93 |
49 |
110 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
AUGMENTATION OF BAKLA WATER SUPPLY SCHEME,SM/10667 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
29/04/2022 |
21/12/2022 |
21/04/2024 |
29/03/2024 |
5 |
40 |
186.88 |
51.71 |
95 |
28 |
111 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
AUGMENTATION OF JASHODANGA WATER SUPPLY SCHEME,SM/10668 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
29/04/2022 |
14/03/2023 |
14/08/2024 |
12/10/2023 |
3 |
20 |
69.44 |
20.89 |
96 |
30 |
112 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
AUGMENTATION OF SALSALABARI WATER SUPPLY SCHEME.,SM/10670 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
29/04/2022 |
19/09/2022 |
31/05/2024 |
29/03/2024 |
4 |
45 |
108.13 |
29.74 |
56 |
28 |
113 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
AUGMENTATION OF BIRPARA (APD) WATER SUPPLY SCHEME,SM/10671 |
Augmentation |
Birpara Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
29/04/2022 |
13/05/2022 |
31/03/2024 |
29/03/2024 |
5 |
38 |
152.39 |
18.79 |
96 |
12 |
114 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
AUGMENTATION OF LOKNATHPUR WATER SUPPLY SCHEME,SM/10673 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
29/04/2022 |
13/05/2022 |
31/03/2024 |
29/01/2024 |
6 |
50 |
252.98 |
16.34 |
92 |
6 |
115 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
AUGMENTATION OF BANCHUKAMARI WATER SUPPLY SCHEME,SM/10674 |
Augmentation |
Birpara Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
29/04/2022 |
10/08/2022 |
30/06/2024 |
29/03/2024 |
4 |
60 |
236.97 |
22.03 |
80 |
9 |
116 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
AUGMENTATION OF MUNSHIPARA WATER SUPPLY SCHEME,SM/10675 |
Augmentation |
Birpara Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
29/04/2022 |
16/03/2023 |
16/08/2024 |
29/03/2024 |
1 |
50 |
178.64 |
51.29 |
90 |
29 |
117 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
AUGMENTATION OF TAPASHIKHATA PIPED WATER SUPPLY SCHEME,SM/10676 |
Augmentation |
Birpara Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
29/04/2022 |
13/05/2022 |
31/03/2024 |
29/03/2024 |
3 |
40 |
252.39 |
18.51 |
90 |
7 |
118 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
AUGMENTATION OF CHANDIRJHAR WATER SUPPLY SCHEME,SM/10677 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
29/04/2022 |
13/05/2022 |
31/03/2024 |
29/01/2024 |
5 |
2,678 |
192.09 |
12.09 |
98 |
6 |
119 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
AUGMENTATION OF JOGENDRAPUR WATER SUPPLY SCHEME,SM/10678 |
Augmentation |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) |
29/04/2022 |
01/03/2023 |
01/09/2024 |
28/03/2024 |
4 |
2,100 |
274.45 |
48.44 |
47 |
18 |
120 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
IMPLEMENTATION OF STANDALONE WATER SUPPLY SYSTEM IN THE VILLAGES HAVING LESS THAN 100 HOUSEHOLD UNDER ALIPURDUAR DISTRICT PIPED WATER SUPPLY SCHEME,SM/10776 |
New |
Birpara Sub-Division |
Birpara A.E |
Birpara Sub Division |
23/05/2022 |
31/05/2022 |
30/11/2024 |
28/03/2024 |
2 |
0 |
167.97 |
97.37 |
72 |
58 |
121 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
AUGMENTATION OF PATLAKHAWA WATER SUPPLY SCHEME,SM/11401 |
Augmentation |
Birpara Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
04/07/2022 |
07/07/2022 |
31/03/2024 |
28/03/2024 |
10 |
2,981 |
140.89 |
126.34 |
60 |
90 |
122 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
AUGMENTATION OF JAYANTI PIPED WATER SUPPLY SCHEME,SM/11402 |
Augmentation |
Alipurduar Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
04/07/2022 |
07/07/2022 |
31/03/2024 |
29/01/2024 |
10 |
608 |
86.31 |
55.06 |
74 |
64 |
123 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME,SM/11459 |
Augmentation |
Birpara Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
12/07/2022 |
15/07/2022 |
31/03/2024 |
28/03/2024 |
40 |
7,440 |
1,873.61 |
881.75 |
60 |
47 |
124 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
KUMARGRAM TG AREA PIPED WATER SUPPLY SCHEME,SM/11482 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
14/07/2022 |
15/07/2022 |
31/03/2024 |
29/03/2024 |
18 |
1,493 |
395.23 |
183.90 |
86 |
47 |
125 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
Bandpani Tea Garden Areas Piped Water Supply Scheme.,SM/11483 |
New |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
14/07/2022 |
15/07/2022 |
31/03/2024 |
26/12/2023 |
18 |
1,272 |
528.37 |
227.19 |
60 |
43 |
126 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
NEWLANDS TG AREA PIPED WATER SUPPLY SCHEME,SM/11484 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
14/07/2022 |
15/07/2022 |
31/03/2024 |
29/02/2024 |
14 |
1,520 |
455.23 |
229.14 |
86 |
50 |
127 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
SANKOSH TG AREA PIPED WATER SUPPLY SCHEME,SM/11485 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
14/07/2022 |
15/07/2022 |
31/03/2024 |
29/03/2024 |
13 |
1,567 |
389.92 |
194.07 |
78 |
50 |
128 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
HOASINBAD TEA GARDEN AREA PIPED WATER SUPPLY SCHEME,SM/11696 |
New |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
29/07/2022 |
10/11/2022 |
10/04/2024 |
29/02/2024 |
8 |
990 |
411.35 |
189.76 |
79 |
46 |
129 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
SHRINATHPUR TEA GARDEN AREA PIPED WATER SUPPLY SCHEME,SM/11709 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
29/07/2022 |
10/11/2022 |
10/04/2024 |
29/03/2024 |
24 |
1,702 |
817.44 |
554.78 |
90 |
68 |
130 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
AUGMENTATION OF TOTOPARA AREA PIPED WATER SUPPLY SCHEME,SM/11765 |
Augmentation |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Madarihat - Birpara Block |
03/08/2022 |
07/11/2022 |
04/09/2024 |
01/12/2023 |
6 |
110 |
154.07 |
57.84 |
32 |
38 |
131 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
AUGMENTATION OF NEPANIA PIPED WATER SUPPLY SCHEME,SM/11766 |
Augmentation |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
03/08/2022 |
13/12/2022 |
13/05/2024 |
28/03/2024 |
4 |
400 |
88.14 |
39.06 |
64 |
44 |
132 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
AUGMENTATION OF LANKAPARA TG FOR LONKAPARA HAT AREA PIPED WATER SUPPLY SCHEME,SM/11767 |
Augmentation |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
03/08/2022 |
13/12/2022 |
13/05/2024 |
28/03/2024 |
13 |
250 |
204.15 |
59.54 |
39 |
29 |
133 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
AUGMENTATION OF KAIJALI BASTY WATER SUPPLY SCHEME,SM/11958 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
25/08/2022 |
21/11/2022 |
21/04/2024 |
29/03/2024 |
10 |
493 |
562.16 |
103.51 |
57 |
18 |
134 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
AUGMENTATION OF UTTAR SISUBARI WATER SUPPLY SCHEME,SM/11959 |
Augmentation |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
25/08/2022 |
19/05/2023 |
19/11/2024 |
28/03/2024 |
9 |
807 |
648.63 |
43.33 |
50 |
7 |
135 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
AUGMENTATION OF DALMORE & RAMJHORA TEA GARDEN PIPED WATER SUPPLY SCHEME,SM/11960 |
Augmentation |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
25/08/2022 |
27/12/2022 |
27/05/2024 |
28/03/2024 |
6 |
1,031 |
512.91 |
80.30 |
36 |
16 |
136 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
AUGMENTATION OF DAKSHIN SONAPUR WATER SUPPLY SCHEME,SM/11970 |
Augmentation |
Alipurduar RWS Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block |
29/08/2022 |
05/09/2022 |
30/06/2024 |
28/03/2024 |
21 |
7,780 |
1,275.43 |
344.65 |
58 |
27 |
137 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
AUGMENTATION OF KUMARGRAM PIPED WATER SUPPLY SCHEME,SM/11985 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
01/09/2022 |
05/09/2022 |
30/06/2024 |
29/03/2024 |
24 |
7,273 |
2,156.38 |
809.21 |
59 |
38 |
138 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
KARTIKA TEA GARDEN AREA PIPED WAATER SUPPLY SCHEME,SM/11991 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
01/09/2022 |
21/11/2022 |
21/04/2024 |
29/03/2024 |
11 |
1,128 |
432.05 |
259.66 |
88 |
60 |
139 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
PHASKHAWA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME,SM/11992 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
Birpara Sub Division |
01/09/2022 |
21/11/2022 |
31/10/2024 |
29/03/2024 |
11 |
705 |
269.79 |
118.23 |
71 |
44 |
140 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
KOHINUR TEA GARDEN AREA PIPED WATER SUPPLY SCHEME,SM/12113 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
02/09/2022 |
21/11/2022 |
21/04/2024 |
29/03/2024 |
15 |
2,542 |
821.35 |
311.03 |
78 |
38 |
141 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
RAYDAK TEA GARDEN AREA PIPED WATER SUPPLY SCHEME,SM/12114 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
02/09/2022 |
21/11/2022 |
21/04/2024 |
29/03/2024 |
21 |
1,999 |
588.27 |
201.06 |
66 |
34 |
142 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
AUGMENTATION OF HASIMARA WATER SUPPLY SCHEME,SM/12361 |
Augmentation |
Alipurduar Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block |
13/09/2022 |
10/01/2023 |
10/06/2024 |
28/03/2024 |
9 |
1,277 |
1,269.79 |
75.08 |
34 |
6 |
143 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME,SM/12561 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
14/09/2022 |
19/09/2022 |
30/04/2024 |
29/03/2024 |
38 |
7,428 |
1,852.66 |
1,047.22 |
86 |
57 |
144 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
SISHA JUMRHA PIPED WATER SUPPLY SCHEME,SM/12753 |
New |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
20/09/2022 |
27/03/2023 |
27/09/2024 |
28/03/2024 |
8 |
2,683 |
797.79 |
264.33 |
62 |
33 |
145 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
NAOTHOARTARI PIPED WATER SUPPLY SCHEME,SM/12754 |
New |
Alipurduar RWS Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block |
20/09/2022 |
31/03/2023 |
31/08/2024 |
28/03/2024 |
6 |
295 |
415.72 |
99.76 |
31 |
24 |
146 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
KADAMBINI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME,SM/13239 |
New |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick),RWS Falakata Block |
14/10/2022 |
17/01/2023 |
17/06/2024 |
28/03/2024 |
14 |
4,031 |
716.98 |
375.10 |
71 |
52 |
147 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
PASCHIM CHENGMARI PIPED WATER SUPPLY SCHEME ,SM/13240 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
14/10/2022 |
17/01/2023 |
19/11/2024 |
21/06/2024 |
7 |
929 |
741.26 |
235.73 |
77 |
32 |
148 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
CHUOTA DALDALI PIPED WATER SUPPLY SCHEME.,SM/13242 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
14/10/2022 |
16/03/2023 |
20/11/2024 |
06/08/2024 |
9 |
1,001 |
615.61 |
65.51 |
23 |
11 |
149 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
PURBA KHALISHAMARI PIPED WATER SUPPLY SCHEME.,SM/13243 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
14/10/2022 |
27/03/2023 |
30/11/2024 |
29/03/2024 |
8 |
1,919 |
963.61 |
341.12 |
61 |
35 |
150 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
NIMTI DOMOHANI PIPED WATER SUPPLY SCHEME,SM/13244 |
New |
Alipurduar Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block |
14/10/2022 |
31/03/2023 |
30/09/2024 |
28/03/2024 |
9 |
1,482 |
710.27 |
233.41 |
78 |
33 |
151 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
PASCHIM SATALI PIPED WATER SUPPLY SCHEME,SM/13245 |
New |
Alipurduar Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block |
14/10/2022 |
17/01/2023 |
25/09/2024 |
28/05/2024 |
9 |
2,797 |
969.65 |
619.87 |
81 |
64 |
152 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
BARIGURI PIPED WATER SUPPLY SCHEME,SM/13246 |
New |
Alipurduar RWS Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block |
14/10/2022 |
16/05/2023 |
16/11/2024 |
28/03/2024 |
9 |
6,943 |
895.77 |
154.90 |
28 |
17 |
153 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
PRODHANPARA PIPED WATER SUPPLY SCHEME,SM/13247 |
New |
Alipurduar RWS Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block |
14/10/2022 |
16/03/2023 |
16/08/2024 |
28/03/2024 |
5 |
1,353 |
638.14 |
99.45 |
28 |
16 |
154 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
MADHYA KHAIRBARI PIPED WATER SUPPLY SCHEME,SM/13248 |
New |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Madarihat - Birpara Block |
14/10/2022 |
27/03/2023 |
27/08/2024 |
28/03/2024 |
10 |
2,462 |
877.17 |
219.62 |
37 |
25 |
155 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
BUXA FOREST (RAJA BHATKHAWA) PIPED WATER SUPPLY SCHEME,SM/13249 |
New |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
14/10/2022 |
23/03/2023 |
21/11/2024 |
26/06/2024 |
19 |
2,652 |
860.22 |
79.49 |
18 |
9 |
156 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
KAYAKHATA PIPED WATER SUPPLY SCHEME,SM/13299 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
17/10/2022 |
16/03/2023 |
16/09/2024 |
04/04/2024 |
9 |
1,585 |
682.41 |
168.32 |
42 |
25 |
157 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
BRAJERKUTHI PIPED WATER SUPPLY SCHEME,SM/13300 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
17/10/2022 |
17/01/2023 |
17/06/2024 |
29/03/2024 |
15 |
1,847 |
944.20 |
414.81 |
85 |
44 |
158 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
PURBA CHIKLIGURI PIPED WATER SUPPLY SCHEME,SM/13301 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
17/10/2022 |
17/01/2023 |
30/09/2024 |
29/03/2024 |
12 |
1,869 |
875.66 |
295.10 |
56 |
34 |
159 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
DAKSHIN BARAJHAR FOREST PIPED WATER SUPPLY SCHEME,SM/13302 |
New |
Alipurduar RWS Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block |
17/10/2022 |
19/01/2023 |
19/06/2024 |
28/03/2024 |
4 |
308 |
171.75 |
69.95 |
53 |
41 |
160 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
TELIPARA PIPED WATER SUPPLY SCHEME.,SM/13303 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
17/10/2022 |
31/03/2023 |
30/09/2024 |
29/03/2024 |
9 |
1,029 |
488.14 |
94.05 |
52 |
19 |
161 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
MARAKHATA PIPED WATER SUPPLY SCHEME.,SM/13304 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
17/10/2022 |
17/01/2023 |
30/06/2024 |
04/04/2024 |
10 |
3,129 |
839.09 |
277.49 |
80 |
33 |
162 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
DAKSHIN MAJIDKHANA PIPED WATER SUPPLY SCHEME.,SM/13305 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
17/10/2022 |
17/01/2023 |
17/06/2024 |
29/03/2024 |
10 |
1,402 |
760.21 |
361.88 |
83 |
48 |
163 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
KALABERIA PIPED WATER SUPPLY SCHEME,SM/13306 |
New |
Alipurduar RWS Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block |
17/10/2022 |
27/03/2023 |
27/08/2024 |
28/03/2024 |
6 |
1,065 |
461.28 |
103.23 |
40 |
22 |
164 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
JAYANTI TEA GARDEN -II AREA PIPED WATER SUPPLY SCHEME,SM/13448 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
02/11/2022 |
06/06/2023 |
06/11/2024 |
29/03/2024 |
7 |
563 |
305.16 |
64.64 |
34 |
21 |
165 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
ETHELBARI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME ,SM/13449 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) |
02/11/2022 |
17/01/2023 |
30/10/2024 |
10/05/2024 |
13 |
1,856 |
695.45 |
298.93 |
71 |
43 |
166 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
ATIABARI TEA GARDEN PIPED WATER SUPPLY SCHEME.,SM/14092 |
New |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
12/12/2022 |
01/03/2023 |
01/09/2024 |
28/03/2024 |
10 |
1,884 |
895.42 |
260.65 |
75 |
29 |
167 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
RAJABHAT TEA GARDEN PIPED WATER SUPPLY SCHEME.,SM/14093 |
New |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
12/12/2022 |
01/03/2023 |
01/09/2024 |
28/03/2024 |
7 |
1,074 |
528.73 |
151.32 |
76 |
29 |
168 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
AUGMENTATION OF BHATIBARI PIPED WATER SUPPLY SCHEME,SM/14096 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
15/12/2022 |
21/12/2022 |
21/05/2024 |
29/03/2024 |
57 |
8,070 |
2,031.40 |
805.96 |
38 |
40 |
169 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
PARARPAR PIPED WATER SUPPLY SCHEME,SM/14209 |
New |
Alipurduar RWS Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block |
10/01/2023 |
16/03/2023 |
16/08/2024 |
28/03/2024 |
8 |
1,187 |
561.82 |
120.75 |
28 |
21 |
170 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
FOSKADANGA PIPED WATER SUPPLY SCHEME,SM/14210 |
New |
Alipurduar RWS Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block |
10/01/2023 |
27/03/2023 |
27/08/2024 |
28/03/2024 |
6 |
684 |
510.99 |
141.71 |
17 |
28 |
171 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
BHATKHAWA TEA GARDEN PIPED WATER SUPPLY SCHEME,SM/14211 |
New |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
10/01/2023 |
01/03/2023 |
01/09/2024 |
28/03/2024 |
7 |
1,604 |
530.22 |
133.00 |
61 |
25 |
172 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
BHATPARA TEA GARDEN PIPED WATER SUPPLY SCHEME,SM/14212 |
New |
Alipurduar RWS Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block |
10/01/2023 |
31/01/2023 |
31/07/2024 |
28/03/2024 |
9 |
2,321 |
570.23 |
203.35 |
72 |
36 |
173 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
BEECH TEA GARDEN PIPED WATER SUPPLY SCHEME,SM/14214 |
New |
Alipurduar Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block |
10/01/2023 |
16/03/2023 |
16/08/2024 |
28/03/2024 |
9 |
1,579 |
527.26 |
239.21 |
85 |
45 |
174 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
NIMTIJHORA TEA GARDEN PIPED WATER SUPPLY SCHEME,SM/14215 |
New |
Alipurduar Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block |
10/01/2023 |
31/03/2023 |
28/11/2024 |
27/08/2024 |
7 |
1,002 |
336.47 |
92.90 |
63 |
28 |
175 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
GAROCHIRA BANDAPANI PIPED WATER SUPPLY SCHEME,SM/14216 |
New |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
10/01/2023 |
19/01/2023 |
29/08/2024 |
02/04/2024 |
4 |
130 |
129.41 |
41.71 |
69 |
32 |
176 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
NURPUR PIPED WATER SUPPLY SCHEME.,SM/14218 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
10/01/2023 |
01/03/2023 |
01/09/2024 |
29/03/2024 |
10 |
423 |
451.36 |
139.58 |
92 |
31 |
177 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
TURTURI PIPED WATER SUPPLY SCHEME.,SM/14219 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
10/01/2023 |
27/03/2023 |
27/08/2024 |
29/03/2024 |
13 |
1,003 |
948.08 |
261.16 |
57 |
28 |
178 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
TORSHA FOREST PIPED WATER SUPPLY SCHEME,SM/14220 |
New |
Alipurduar RWS Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block |
10/01/2023 |
19/01/2023 |
19/06/2024 |
28/03/2024 |
4 |
201 |
142.14 |
88.23 |
80 |
62 |
179 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
BALLALGURI PIPED WATER SUPPLY SCHEME,SM/14221 |
New |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Madarihat - Birpara Block |
10/01/2023 |
01/03/2023 |
01/09/2024 |
28/03/2024 |
7 |
609 |
413.54 |
160.11 |
61 |
39 |
180 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
UTTAR RANGALIBAZNA PIPED WATER SUPPLY SCHEME,SM/14222 |
New |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
10/01/2023 |
27/03/2023 |
27/08/2024 |
28/03/2024 |
7 |
729 |
429.71 |
67.32 |
37 |
16 |
181 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
PAKRIGURI PIPED WAYER SUPPLY SCHEME.,SM/14223 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
10/01/2023 |
31/03/2023 |
26/11/2024 |
06/08/2024 |
11 |
603 |
509.75 |
51.53 |
19 |
10 |
182 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
AUGMENTATION OF BIRPARA WATER SUPPLY SCHEME,SM/14233 |
Augmentation |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
11/01/2023 |
17/01/2023 |
17/06/2024 |
28/03/2024 |
41 |
9,924 |
2,288.93 |
447.63 |
46 |
20 |
183 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
AUGMENTATION OF HANTUPARA TG PIPED WATER SUPPLY SCHEME.,SM/15209 |
Augmentation |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
07/02/2023 |
13/03/2023 |
13/08/2024 |
28/03/2024 |
3 |
0 |
112.19 |
21.14 |
52 |
19 |
184 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
AUGMENTATION OF DHUMCHIPARA TG PIPED WATER SUPPLY SCHEME.,SM/15210 |
Augmentation |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
07/02/2023 |
13/03/2023 |
13/08/2024 |
28/03/2024 |
7 |
0 |
111.32 |
20.88 |
43 |
19 |
185 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
KALCHINI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME,SM/15482 |
New |
Alipurduar Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block |
13/02/2023 |
01/03/2023 |
01/09/2024 |
28/03/2024 |
18 |
5,753 |
1,380.67 |
175.22 |
33 |
13 |
186 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
CHALNIPAK PIPED WATER SUPPLY SCHEME.,SM/15534 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Madarihat - Birpara Block |
16/02/2023 |
01/03/2023 |
01/09/2024 |
29/03/2024 |
11 |
1,648 |
1,024.40 |
377.87 |
39 |
37 |
187 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
UTTAR BARAJHAR FOREST PIPE WATER SUPPLY SCHEME,SM/15914 |
New |
Alipurduar Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block |
22/02/2023 |
24/04/2023 |
24/09/2024 |
01/12/2023 |
5 |
567 |
358.24 |
15.00 |
9 |
4 |
188 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
REJUVENATION OF SIDHABARI PIPED WATER SUPPLY SCHEME,SM/16115 |
Augmentation |
Birpara Sub-Division |
Alipurduar RWS |
Birpara Sub Division |
22/02/2023 |
18/03/2023 |
18/09/2024 |
28/03/2024 |
1 |
0 |
240.25 |
0.00 |
58 |
0 |
189 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
28&29 MILE BASTI PIPE WATER SUPPLY SCHEME,SM/16506 |
New |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
03/03/2023 |
23/03/2023 |
21/11/2024 |
22/05/2024 |
17 |
1,752 |
990.41 |
54.11 |
8 |
5 |
190 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
BUXA PIPE WATER SUPPLY SCHEME,SM/16507 |
New |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
03/03/2023 |
23/03/2023 |
23/08/2024 |
01/12/2023 |
4 |
219 |
219.61 |
0.00 |
3 |
0 |
191 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
PURBBA NARATHALI PIPED WATER SUPPLY SCHEME.,SM/16537 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
10/03/2023 |
27/03/2023 |
27/08/2024 |
04/04/2024 |
12 |
2,273 |
1,261.38 |
281.19 |
53 |
22 |
192 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
UTTAR MAJID KHANA PIPED WATER SUPPLY SCHEME,SM/16538 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
10/03/2023 |
17/03/2023 |
31/08/2024 |
29/03/2024 |
10 |
1,888 |
1,074.69 |
327.16 |
66 |
30 |
193 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
Malangi Tea Garden Area Piped Water Supply Scheme,SM/18150 |
New |
Alipurduar Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block |
29/03/2023 |
04/05/2023 |
28/10/2024 |
03/05/2024 |
8 |
2,115 |
561.45 |
26.00 |
33 |
5 |
194 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
Chengmari Piped Water Supply Scheme,SM/18152 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
29/03/2023 |
04/05/2023 |
13/11/2024 |
03/07/2024 |
8 |
1,699 |
772.15 |
238.86 |
48 |
31 |
195 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
Bhutri Forest Piped Water Supply Scheme,SM/18156 |
New |
Alipurduar Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block |
29/03/2023 |
18/04/2023 |
18/10/2024 |
28/03/2024 |
3 |
48 |
59.54 |
8.86 |
68 |
15 |
196 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
Purbba Majherdabri Tea Garden Area Piped Water Supply Scheme,SM/18157 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
29/03/2023 |
22/05/2023 |
22/10/2024 |
29/03/2024 |
5 |
1,538 |
360.16 |
46.59 |
38 |
13 |