SL No Division Agency Work Name Unique Order No System Order No Order Memo No Order Date No of Bills Bill Amount Scheme Requisition Amount Allotment Amount
10 12 478.48 # 478.48 13.13
1 Balurghat Division RAIL BHOOMI CROSSING SEVA (IR- Jack Pushing of M.S. pipe of 200 mm dia. Through 600 mm dia R.C.C. Hume Pipe (NP4)/M.S. pipe by Hydraulic Jacking Technique method across Railway Track near Raghabpur (KM/TP-60/8-60/9) between Gangarampur and Rampur Bazar for Zone VII under Gangarampur Su 000120 3214BD 31/01/2023 3 19.29 Sub Surface Water Based Piped Water Supply Scheme for Fluoride Affected Areas of Gangarampur Block (SM/04696) 19.29 13.13
2 Balurghat Division DURJOY MITRA Laying of Rising Main, Providing FHTC, Construction of 300 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Pump House, Boundary Wall & Approach Road for implementation of Shyampur Piped Water Supply Scheme at Banshihari Block i 000120ORD/000020/2023-202 ORD/000020/2023-2024 270/BD 05/05/2023 1 33.29 SHYAMPUR PIPED WATER SUPPLY SCHEME (SM/11962) 33.29 0
3 Balurghat Division ASHIT KUMAR DEBSHARMA Sinking of Tubewell, Laying of Rising Main & Distribution System, Providing FHTC, Construction of 400 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Pump House, Boundary Wall & Approach Road for Augmentation of Harirampur Pipe 000120ORD/000091/2023-202 ORD/000091/2023-2024 991/BD 31/07/2023 1 145.97 Augmentation of Ground Water Based Harirampur Piped Water Supply Scheme (SM/12798) 145.97 0
4 Balurghat Division S. DUTTA Sinking of Tubewell, Laying of Rising Main, Providing FHTC, Construction of 450 Cum capacity OHR with 20m Staging Height including Soil Investigation, Construction of blower room and Pump House, Renovation of Boundary Wall, Construction of Approach Road a 000120ORD/000100/2023-202 ORD/000100/2023-2024 1105/BD 11/08/2023 1 127.09 Augmentation of Ground Water Based Kamarpara Piped Water Supply Scheme (SM/18631) 127.09 0
5 Balurghat Division MAA CHANCHALA CONSTRUCTION Face lifting related works of Head Works Site compound for Zone - VI under Tapan Western Sector of Sub-Surface Based Piped Water Supply Scheme, in the District of Dakshin Dinajpur, under Balurghat Division, P.H. Engineering Dte. 000120ORD/000105/2023-202 ORD/000105/2023-2024 1247/BD 24/08/2023 1 3.49 Providing Functional House Hold Tap Connection by Retrofitting of 05 nos Zones under Tapan Sub Surface Based Piped Water Supply Project in the District of Dakshin Dinajpur (Phase I) (SM/09796) 3.49 0
6 Balurghat Division MAA KAMAKKHA CO-OPERATIVE LABO Providing Functional House Hold Tap connection work by Retrofitting of Zone- II at Tapan Western Sector under Sub Surface Based Piped Water Supply Scheme at Tapan Block in the District of Dakshin Dinajpur. 000120ORD/000150/2022-202 ORD/000150/2022-2023 2864/BD 05/01/2023 1 36.11 Providing Functional House Hold Tap Connection by Retrofitting of 05 nos Zones under Tapan Sub Surface Based Piped Water Supply Project in the District of Dakshin Dinajpur (Phase I) (SM/09796) 36.11 0
7 Balurghat Division M.A. ENTERPRISE Erection of Permanent Type village wise Scheme Information Board at different Piped Water Supply Schemes under JJM as per departmental design and drawing for Balurghat, Hili, Tapan & Kumarganj Block in the District of Dakshin Dinajpur under Balurghat Divi 000120ORD/000188/2023-202 ORD/000188/2023-2024 2069/BD 16/12/2023 1 11.64 Augmentation of Ground Water Based Hili Piped Water Supply Scheme. (SM/13831) 11.64 0
8 Balurghat Division ASHIT KUMAR DEBSHARMA Sinking of Tubewell, Laying of Rising Main & Distribution System, Providing FHTC, Construction of 100 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Pump House, Boundary Wall & Approach Road for implementation of Amai Piped Wa 000120ORD/000205/2022-202 ORD/000205/2022-2023 3509/BD 04/03/2023 1 39.91 AMAI PIPED WATER SUPPLY SCHEME (SM/11963) 39.91 0
9 Balurghat Division ASHOK MITRA Sinking of Tubewell, Laying of Rising Main & Distribution System, Providing FHTC, Construction of 400 Cum capacity OHR with 20m Staging Height including Soil Investigation, Repairing and Renovation work of Existing Pump House, Construction of new Pump Hou 000120ORD/000231/2022-202 ORD/000231/2022-2023 3904/BD 29/03/2023 1 36.81 Augmentation of Dhiltail Piped Water Supply Scheme in Banshihari Block of Dakshin Dinajpur District. (SM/13829) 36.81 0
10 Balurghat Division BOSE CONSTRUCTION Source Augmentation of Deulbari Piped Water Supply Scheme comprising of Sinking of One Big Dia Tubewell, Construction of (3.6mtr. X 3.00 mtr.) Pump House and Construction of Boundary wall for 3rd Tubewell Site at Deulbari Mouza, Kushmandi Block in the Dis 000120ORD/000236/2022-202 ORD/000236/2022-2023 3926/BD 30/03/2023 1 24.88 Source Augmentation of Deulbari PWSS at Kushmandi Block in the District of Dakshin Dinajpur under Balurghat Division, PHE Dte. (SM/16207) 24.88 0
Total 12 478.48 # 478.48 13.13