F4- Undisbursed Fund

Rs. in Lakh
SL No Division Agency Work Name Unique Order No System Order No Order Memo No Order Date No of Bills Bill Amount Scheme Requisition Amount Allotment Amount
265 294 13,433.72 # 13,436.42 2,062.19
1 Coochbehar Division SUCHITRO FUEL STATION supply of fuel for the month of may 2023 000098 446 01/05/2023 7 12.21 AUGMENTATION OF BALABHUT PIPED WATER SUPPLY SCHEME (SM/17439) 12.21 5.7
2 Coochbehar Division KHOKAN DAS Execution of different works related to AUG of MAIDAM PWSS under JAL JEEVAN MISSION . 000098ORD/000004/2023-202 ORD/000004/2023-2024 49/CD 17/04/2023 1 40.87 Maidam Piped Water Supply Scheme (SM/16981) 40.87 0
3 Coochbehar Division SHIBA ENTERPRISE Construction of pump house, Boundary wall at Head work site and laying of Pipe line and other allied works at inconnection with augmentation of NAGAR CHANGRABANDHA (Zone-II) PWSS under Cooch Behar Division, PHED. (Part-B) 000098ORD/000009/2022-202 ORD/000009/2022-2023 25/CD 07/04/2022 1 3.93 Augmentation works for providing functional household tap connection within command area of NAGAR CHANGRABANDA Piped Water Supply Scheme (SM/10159) 3.93 3.93
4 Coochbehar Division SHREE RANI SATI ENTERPRISE Execution of different works related to BAJRAPUR PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 12/1-5/NBC-1; Dt.: 05-04-23 000098ORD/000009/2023-202 ORD/000009/2023-2024 10/CD 05/04/2023 1 49.02 AUGMENTATION OF GROUND WATER BASED BAJRAPUR PWSS TUFANGANJ - II BLOCK WITHIN COOCHBEHAR DISTRICT UNDER COOCHBEHAR DIVISION, PHE DTE (SM/16139) 49.02 0
5 Coochbehar Division ABHIJIT KUMAR DAS Providing FHTC, Repairing of Pump house, boundary wall and laying new Pipe line and other allied works at inconnection with augmentation of NIJTARAF PWSS under Cooch Behar Division, PHED.(Part-C) 000098ORD/000011/2022-202 ORD/000011/2022-2023 27/CD 07/04/2022 1 27 Augmentation of NIJTARAF Piped water supply schemes (SM/10163) 27 27
6 Coochbehar Division SSPR VALVE MANUFACTURING PVT. Execution of different works related to ANDARAN FULBARI (phulbari P A ) PWSS under JAL JEEVAN MISSION PART Y 000098ORD/000017/2023-202 ORD/000017/2023-2024 391/CD 23/05/2023 1 32.73 AUGMENTATION OF GROUND WATER BASED PHULBARI PART A PWSS (SM/16518) 32.73 0
7 Coochbehar Division NO 1 GURIAHATI CO OP LABOUR CO Providing FHTC & Laying P/Line at PAKHIHAGA PWSS under Cooch Behar Division, PHED 000098ORD/000020/2022-202 ORD/000020/2022-2023 36/CD 07/04/2022 1 2.89 Retrofitting works for providing functional household tap connection(FHTC) eithin the cpmmand area of Pakhihaga Water Supply Scheme (SM/08150) 2.89 2.89
8 Coochbehar Division MODERN UN-EMP CO-OPT LABOUR CO Execution of different works related to LOTAPOTA PWSS under JAL JEEVAN MISSION 000098ORD/000025/2023-202 ORD/000025/2023-2024 385/CD 23/05/2023 1 23.06 Rejuvenation of LOTAPOTA Water Supply Scheme (SM/10713) 23.06 0
9 Coochbehar Division NORTH BENGAL CONSTRUCTION CO Execution of different works related to JAMALDAH HAT (Bhogramguri Adj. Area) PWSS under JAL JEEVAN MISSION 000098ORD/000028/2023-202 ORD/000028/2023-2024 382/CD 23/05/2023 1 4.83 BHOGRAMGURI & ITS ADJOINING MOUZAS PWSS (SM/18411) 4.83 0
10 Coochbehar Division TAPAN CHANDA Execution of different works related 3rd Site of Baro Nachina PWSS under JAL JEEVAN MISSION 000098ORD/000038/2023-202 ORD/000038/2023-2024 375/CD 23/05/2023 1 62.74 Bara Nachina (P) PIPED WATER SUPPLY SCHEME. (SM/13145) 62.74 0
11 Coochbehar Division GOUTAM KUMAR DAS Execution of different works related to Aug. of SHILGHAGRI PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 228/1-5/NBC-1; Dt.: 02-06-23 000098ORD/000044/2023-202 ORD/000044/2023-2024 468/CD 02/06/2023 1 44.56 AUGMENTATION OF GROUND WATER BASED SHILGHAGRI PWSS TUFANGANJ - II BLOCK WITHIN COOCHBEHAR DISTRICT UNDER COOCHBEHAR DIVISION, PHE DTE (SM/16167) 44.56 0
12 Coochbehar Division MS DD ENTERPRISE Execution of different works related to Chandamari PWSS under JAL JEEVAN MISSION 000098ORD/000045/2023-202 ORD/000045/2023-2024 406/CD 23/05/2023 1 72.65 CHANDAMARI PWSS (SM/18138) 72.65 0
13 Coochbehar Division UTPAL CHAKRABORTY Execution of different works related to Aug. of MAHISHKUCHI ZONE-II PWSS under JAL JEEVAN MISSION 000098ORD/000046/2023-202 ORD/000046/2023-2024 408/CD 23/05/2023 1 55.23 AUGMENTATION OF GROUND WATER BASED MAHISHKUCHI ZONE-II PIPED WATER SUPPLY SCHEME OF TUFANGUNJ-II BLOCK WITHIN COOCHBEHAR DISTRICT (SM/16166) 55.23 0
14 Coochbehar Division SANKAR CHAKRABORTY Execution of different works related to UTTAR SINGIMARI PWSS under JAL JEEVAN MISSION 000098ORD/000047/2023-202 ORD/000047/2023-2024 407/CD 23/05/2023 1 127.82 UTTAR SINGIMARI PIPED WATER SUPPLY SCHEME (SM/14452) 127.82 0
15 Coochbehar Division NARAYAN CHANDRA BANIK Execution of different works related to CHHAGALBER PWSS under JAL JEEVAN MISSION 000098ORD/000048/2023-202 ORD/000048/2023-2024 409/CD 23/05/2023 1 23 Rejuvenation of CHHAGALBER Water Supply Scheme (SM/10366) 23 0
16 Coochbehar Division LONGLAST PIPES (INDIA) PVT. LT Sinking of 250mm x 200 mm Big dia. Tube well with UPVC Pipes & Strainer at 3rd Site of BARO DHAPERCHATRA PWSS under Cooch Behar Division PHE Dte. 000098ORD/000064/2022-202 ORD/000064/2022-2023 261/CD 24/05/2022 1 12 Augmentation works for Providing Functional House Hold Tap Connection (FJTC) within command area of Baro Dhaperchatra Piped water supply Scheme. (SM/10158) 12 12
17 Coochbehar Division RAHAMAN ENTERPRISE Execution of different works related to PETLA PWSS under JAL JEEVAN MISSION 000098ORD/000075/2023-202 ORD/000075/2023-2024 410/CD 23/05/2023 1 25 Augumentation of Petla Water Supply Scheme. (SM/09295) 25 0
18 Coochbehar Division M/S. MANDAL CONSTRUCTION Execution of different works related to BALABHUT PWSS under JAL JEEVAN MISSION 000098ORD/000076/2023-202 ORD/000076/2023-2024 4400/CD 31/05/2023 1 18.95 AUGMENTATION OF BALABHUT PIPED WATER SUPPLY SCHEME (SM/17439) 18.95 0
19 Coochbehar Division TULIP ENGINEERS CO-OPERATIVE S Execution of different works related to RAJPUR PWSS under JAL JEEVAN MISSION 000098ORD/000078/2023-202 ORD/000078/2023-2024 618/CD 12/07/2023 1 7 REJUVINATION OF RAJPUR WATER SUPPLY SCHEME (SM/09292) 7 0
20 Coochbehar Division SUPER -TECH ENGINEERS'CO-OPERA Execution of different works related to BHEBHERI MANABARI PWSS under JAL JEEVAN MISSION 000098ORD/000088/2023-202 ORD/000088/2023-2024 623/CD 12/07/2023 1 88.08 BHERBHERI MANABARI PIPED WATER SUPPLY SCHEME (SM/18133) 88.08 0
21 Coochbehar Division BIJOY ROY Execution of different works related to NENDAPAR PWSS under JAL JEEVAN MISSION 000098ORD/000092/2023-202 ORD/000092/2023-2024 627/CD 12/07/2023 1 68.42 NENDARPAR PWSS (SM/18137) 68.42 0
22 Coochbehar Division UNIBRO INFRASERV PRIVATE LIMIT Execution of different works related to HEMKUMARI Z1 PWSS under JAL JEEVAN MISSION 000098ORD/000093/2023-202 ORD/000093/2023-2024 628/CD 12/07/2023 1 107.29 AUGMENTATION OF GROUND WATER HEMKUMARI ZONE-I ACCOMODATE FHTC IN HALDIBARI BLOCK WITHIN COOCH BEHAR DISTRICT UNDE COOCH BEHAR DIVISION (SM/18122) 107.29 0
23 Coochbehar Division JAL PRAVAHIKA PRIVATE LIMITED Execution of different works related to NAKARANJAN PWSS under JAL JEEVAN MISSION 000098ORD/000097/2023-202 ORD/000097/2023-2024 632/CD 12/07/2023 1 70.51 NAKARJAN AND ITS ADJOINING MOUZAS PWSS (SM/18239) 70.51 0
24 Coochbehar Division SUMI ENTERPRISE Execution of different works related to AUG. OF KONACHATRA ZONE-I PWSS under JAL JEEVAN MISSION 000098ORD/000100/2023-202 ORD/000100/2023-2024 714/CD 25/07/2023 1 132.54 AUGMENTATION OF GROUND WATER BASED KONACHATRA ZONE-I PIPED WATER SUPPLY SCHEME OF SITAI BLOCK WITHIN COOCHBEHAR DISTRICT (SM/16148) 132.54 0
25 Coochbehar Division SHREE RANI SATI ENTERPRISE Execution of different works related to CHENGERKUTHI KHALISAMARI PWSS under JAL JEEVAN MISSION 000098ORD/000101/2023-202 ORD/000101/2023-2024 715/CD 25/07/2023 1 28.97 CHENGERKUTHI KHALISAMARI PWSS (SM/18284) 28.97 0
26 Coochbehar Division M/S JAYANTA KUMAR GOPE Execution of different works related to SHUKARUR KUTHI PWSS under JAL JEEVAN MISSION 000098ORD/000103/2023-202 ORD/000103/2023-2024 717/CD 25/07/2023 2 218.73 SHUKARUR KUTHI PWSS (SM/18327) 218.73 0
27 Coochbehar Division GHOSH AND SAHA CONSTRUCTION Execution of different works related to AUG. of JAIGIR CHILAKHANA PWSS under JAL JEEVAN MISSION 000098ORD/000104/2023-202 ORD/000104/2023-2024 718/CD 25/07/2023 1 212.62 JAIGIR CHILAKHANA Piped Water Supply Scheme (SM/16155) 212.62 0
28 Coochbehar Division SUMI ENTERPRISE Execution of different works related to AUG. OF KONACHATRA ZONE-II PWSS under JAL JEEVAN MISSION 000098ORD/000109/2023-202 ORD/000109/2023-2024 662/CD 14/07/2023 1 61.58 AUGMENTATION OF GROUND WATER BASED KONACHATRA ZONE-II PIPED WATER SUPPLY SCHEME OF SITAI BLOCK WITHIN COOCHBEHAR DISTRICT (SM/16515) 61.58 0
29 Coochbehar Division M/S T M CONSTRUCTION Execution of different works related to GURIAHATI(NM) (ZONE- III) PWSS under JAL JEEVAN MISSION 000098ORD/000111/2023-202 ORD/000111/2023-2024 664/CD 14/07/2023 1 86.29 Augmentation of Guriahati Pwss (SM/18297) 86.29 0
30 Coochbehar Division SHRI ANNAPURNA DISTRIBUTORS Execution of different works related to AUG. of NAKKATIGACHHI PWSS under JAL JEEVAN MISSION 000098ORD/000112/2023-202 ORD/000112/2023-2024 665/CD 14/07/2023 1 105.22 AUGMENTATION OF GROUND WATER BASED NAKKATIGACHHI PIPED WATER SUPPLY SCHEME TUFANGANJ - I BLOCK WITHIN COOCHBEHAR DISTRICT UNDER COOCH BEHAR DIVISION, P.H.E. Dte. (SM/16151) 105.22 0
31 Coochbehar Division MS SSB CONSTRUCTION CO Execution of different works related to DUDHERKUTHI PWSS under JAL JEEVAN MISSION 000098ORD/000114/2023-202 ORD/000114/2023-2024 667/CD 14/07/2023 1 256.96 DUDDER KUTHI PIPED WATER SUPPLY SCHEME. (SM/18369) 256.96 0
32 Coochbehar Division SUMI ENTERPRISE Execution of different works related to BARA SAULMARI PWSS under JAL JEEVAN MISSION 000098ORD/000117/2023-202 ORD/000117/2023-2024 620_/CD 12/07/2023 1 24.07 Ground Water Based Piped Water Supply Scheme Bara Saulmari (Block-Mathabhanga-II) (SM/13383) 24.07 0
33 Coochbehar Division MS N S CONSTRUCTION Execution of different works related to Aug. of Krishnapur PWSS under JAL JEEVAN MISSION 000098ORD/000119/2023-202 ORD/000119/2023-2024 635/CD 12/07/2023 1 83.03 AUGMENTATION OF KRISHNAPUR PIPED WATER SUPPLY SCHEME (SM/16472) 83.03 0
34 Coochbehar Division CHAKRABORTY ENTERPRISE Execution of different works related to BHURKULDANGA PWSS under JAL JEEVAN MISSION 000098ORD/000121/2023-202 ORD/000121/2023-2024 637/CD 12/07/2023 1 68.71 GROUND WATER BASED BHURUKULDANGA PIPED WATER SUPPLY SCHEME (SM/18134) 68.71 0
35 Coochbehar Division SWAPAN KUMAR ROY Execution of different works related to BHOGMARA PWSS under JAL JEEVAN MISSION 000098ORD/000125/2023-202 ORD/000125/2023-2024 668/CD 14/07/2023 1 36.36 Augmentation of Bhogmara Piped Water Supply Scheme. (SM/10007) 36.36 0
36 Coochbehar Division MALAY KR.DEB Execution of different works related to S. BHETAGURI PWSS under JAL JEEVAN MISSION 000098ORD/000130/2023-202 ORD/000130/2023-2024 671/CD 14/07/2023 1 44.97 Augmentation of Singimari Bhetaguri piped water supply scheme. (SM/10149) 44.97 0
37 Coochbehar Division MS N S CONSTRUCTION Execution of different works related to DAKSHIN SAMILABAS PWSS under JAL JEEVAN MISSION 000098ORD/000135/2023-202 ORD/000135/2023-2024 803/CD 08/08/2023 1 33.06 DAKSHIN SAMILABAS PWSS (SM/18183) 33.06 0
38 Coochbehar Division AMBITIOUS ENTERPRISE Execution of different works related to Aug. of Basraja Pratham Khanda PWSS under JAL JEEVAN MISSION 000098ORD/000136/2023-202 ORD/000136/2023-2024 804/CD 08/08/2023 1 32.31 AGUMENTATION OF BASRAJA PRATHAM KHANDA PWSS (SM/16516) 32.31 0
39 Coochbehar Division BHARATI CHEMICAL AND SCIENTIFI Supply of different type of Chemicals for all Water Testing Laboratories under Cooch Behar Division, PHE Dte. 000098ORD/000138/2022-202 ORD/000138/2022-2023 524/CD 14/07/2022 1 2.4 Requirement of Chemical, Glassware and Instrument of Cooch Behar District Laboratory for NABL Accreditation under Cooch Behar Division P.H.E Dte. (SM/08722) 2.4 2.4
40 Coochbehar Division HARIDAS GHOSH Execution of different works related to FALIMARI (ZONE-I) PWSS under JAL JEEVAN MISSION 000098ORD/000138/2023-202 ORD/000138/2023-2024 807/CD 08/08/2023 1 81.8 FALIMARI PIPED WATER SUPPLY SCHEME (SM/18616) 81.8 0
41 Coochbehar Division AKBAR ALI Execution of different works related to FALIMARI (ZONE-II) PWSS under JAL JEEVAN MISSION 000098ORD/000139/2023-202 ORD/000139/2023-2024 808/CD 08/08/2023 1 117.48 FALIMARI PIPED WATER SUPPLY SCHEME (SM/18616) 117.48 0
42 Coochbehar Division BRAJA GOPAL SAHA Execution of different works related to BARA MADHUSUDAN PWSS under JAL JEEVAN MISSION 000098ORD/000140/2023-202 ORD/000140/2023-2024 806/CD 08/08/2023 1 5.3 BARA MADHUSUDAN PWSS (SM/16524) 5.3 0
43 Coochbehar Division Z STAR COMMOTRADE PVT LTD Execution of different works related to SAJHERPAR GHORAMARA PWSS under JAL JEEVAN MISSION 000098ORD/000143/2023-202 ORD/000143/2023-2024 863/CD 02/08/2023 1 71.13 SAJHERPAR GHORAMARA PIPED WATER SUPPLY SCHEME (SM/18751) 71.13 0
44 Coochbehar Division S & P ENTERPRISE Execution of different works related to GARBHADANGA PWSS under JAL JEEVAN MISSION 000098ORD/000144/2023-202 ORD/000144/2023-2024 862/CD 22/08/2023 1 0.4 Garbhadanga Piped Water Supply Scheme. (SM/18749) 0.4 0
45 Coochbehar Division CONSTRUCTION AND CONSTRUCTION Execution of different works related to NANDINA PWSS under JAL JEEVAN MISSION 000098ORD/000145/2023-202 ORD/000145/2023-2024 861/CD 22/08/2023 1 132.17 Nandina Piped Water Supply Scheme. (SM/18750) 132.17 0
46 Coochbehar Division AMBITIOUS ENTERPRISE Execution of different works related to AUG. of Shikarpur Zone-II PWSS under JAL JEEVAN MISSION 000098ORD/000154/2023-202 ORD/000154/2023-2024 854/CD 21/08/2023 1 77.48 AUGMENTATION OF SIKARPUR PIPED WATER SUPPLY SCHEME (SM/18757) 77.48 0
47 Coochbehar Division GOUTAM KUMAR DAS Execution of different works related to MANSAI PWSS under JAL JEEVAN MISSION 000098ORD/000159/2023-202 ORD/000159/2023-2024 881CD 25/08/2023 1 52.78 Mansai Piped Water Supply Scheme. (SM/18764) 52.78 0
48 Coochbehar Division ASOK KUMAR DHAR Execution of different works related to DAKSHIN BAJEJAMA KHASBAS PWSS under JAL JEEVAN MISSION 000098ORD/000160/2023-202 ORD/000160/2023-2024 889/CD 25/08/2023 1 66.56 DAKSHIN BAJEJAMA KHASBAS PIPED WATER SUPPLY SCHEME. (SM/13118) 66.56 0
49 Coochbehar Division M/S T R PARIK Execution of different works related to KHOLTA PWSS under JAL JEEVAN MISSION 000098ORD/000161/2023-202 ORD/000161/2023-2024 892/CD 31/08/2023 1 295.59 AUGMENTATION OF KHOLTA PIPED WATER SUPPLY SCHEME (SM/18788) 295.59 0
50 Coochbehar Division TORSHA CONSTRUCTION Execution of different works related to KUCHNI PRATHAM KHANDA PWSS under JAL JEEVAN MISSION 000098ORD/000162/2023-202 ORD/000162/2023-2024 893/CD 31/08/2023 2 25.27 Kuchni Pratham Khanda Piped Water Supply Scheme. (SM/18781) 25.27 0
51 Coochbehar Division RADIANT Preparation of DPR for Augmentation of KUCHLIBARI (Zone-II) Piped Water Supply Scheme under MATHABHANGA Sub-Division of Cooch Behar Division,P.H.E.Dte. 000098ORD/000164/2022-202 ORD/000164/2022-2023 623/CD 16/08/2022 1 3.08 AUGMENTATION OF GROUND WATER BASED KUCHLIBARI ZONE-II PWSS (SM/13225) 3.08 3.08
52 Coochbehar Division BIJOY ROY Execution of different works related to JIRANPUR PWSS under JAL JEEVAN MISSION 000098ORD/000164/2023-202 ORD/000164/2023-2024 941/CD 04/09/2023 1 20.69 AUGMENTATION OF JIRANPUR ZONE-I (A) PWSS. (SM/13151) 20.69 0
53 Coochbehar Division CHAKRABORTY ENTERPRISE Execution of different works related to GURIAHATI PWSS under JAL JEEVAN MISSION 000098ORD/000168/2023-202 ORD/000168/2023-2024 945/CD 04/09/2023 1 29.97 AUGMENTATION OF GURIAHATI PIPED WATER SUPPLY SCHEME (SM/09298) 29.97 0
54 Coochbehar Division RADIANT Preparation of DPR for Augmentation of HEMKUMARI (Zone-II) Piped Water Supply Scheme under MATHABHANGA Sub-Division of Cooch Behar Division,P.H.E.Dte. 000098ORD/000169/2022-202 ORD/000169/2022-2023 628/CD 16/08/2022 1 3.02 AUGMENTATION OF GROUND WATER BASE HEMKUMARI ZONE-II ACCOMODATE FHTC IN HALDIBARI BLOCK WITHIN COOCH BEHAR DISTRICT UNDE COOCH BEHAR DIVISION . (SM/13148) 3.02 3.02
55 Coochbehar Division GOUTAM KUMAR DAS Execution of different works related to BALARAMPUR PWSS under JAL JEEVAN MISSION 000098ORD/000172/2023-202 ORD/000172/2023-2024 949/CD 04/09/2023 1 8.96 Retrofitting Cum Rejuvenation of existing ground water baed Balarampur piped water supply scheme (SM/10006) 8.96 0
56 Coochbehar Division MA MAHAMAYA UNP. CO-OP LABOUR Execution of different works related to BOXIRHAT PWSS under JAL JEEVAN MISSION PART M 1 000098ORD/000175/2023-202 ORD/000175/2023-2024 952/CD 04/09/2023 1 26.99 AUGMENTATION OF BAKSIRHAT PIPED WATER SUPPLY SCHEME (SM/10050) 26.99 0
57 Coochbehar Division SAMBHU BANIK xecution of different works related to BOXIRHAT PWSS under JAL JEEVAN MISSION PART N 1 000098ORD/000177/2023-202 ORD/000177/2023-2024 954/CD 04/09/2023 1 27.65 AUGMENTATION OF BAKSIRHAT PIPED WATER SUPPLY SCHEME (SM/10050) 27.65 0
58 Coochbehar Division TAPAN CHANDA Providing FHTC Construction of 450 cum OHR and Laying of Pipe line Construction of Pump House & B/Wall Sinking of Tubewell at 3rd Site of RAMPUR ZONE ¿ I I PWSS under JAL JEEVAN MISSION (PART ¿A) 000098ORD/000178/2022-202 ORD/000178/2022-2023 650/CD 22/08/2022 2 60.06 Augmentation of RAMPUR Piped Water Supply Scheme (SM/11272) 60.06 60.06
59 Coochbehar Division NO 1 GURIAHATI CO OP LABOUR CO Providing FHTC and Laying of pipe line, Const. Of Pump house , B/Wall at 3rd T/W site and other allied work of PAKHIHAGA PWSS under JAL JEEVAN MISSION (PART ¿A) 000098ORD/000184/2022-202 ORD/000184/2022-2023 658/CD 23/08/2022 1 4.47 Pakhihaga Piped Water Supply Scheme (SM/05058) 4.47 0
60 Coochbehar Division DAS ENTERPRISE Providing FHTC & laying of Pipe line and other allied works at Madhya Hudumdanga PWSS under JAL JEEVAN MISSION 000098ORD/000196/2022-202 ORD/000196/2022-2023 666/CD 23/08/2022 1 7.18 Augmentation works for providing Functional House hold Tap Connection Within the Command Area of MADHYA HUDUMDANGA Piped Water Supply Scheme (SM/10141) 7.18 7.18
61 Coochbehar Division SWAPAN KUMAR ROY Providing FHTC & Construction of pump house, Boundarry wall (2nd t/w site) and laying of Pipe line other allied works at BHOGMARA PWSS under JAL JEEVAN MISSION. (Part-C) 000098ORD/000197/2022-202 ORD/000197/2022-2023 672/CD 23/08/2022 1 45.46 Augmentation of Bhogmara Piped Water Supply Scheme. (SM/10007) 45.46 0
62 Coochbehar Division SHREE RANI SATI ENTERPRISE Providing FHTC & Construction of Boundary wall, Pump house at Head Work site and laying of Pipe line and other allied works at DUMNIGURI PWSS under JAL JEEVAN MISSION.(Part-B) 000098ORD/000198/2022-202 ORD/000198/2022-2023 673/CD 23/08/2022 1 9.01 Augmentation of Dumniguru Piped Water Supply Scheme. (SM/10008) 9.01 0
63 Coochbehar Division SHREE RANI SATI ENTERPRISE Providing FHTC & Construction of pump house, Boundary wall (2nd t/w site) and laying of Pipe line other allied works at DUMNIGURI PWSS under JAL JEEVAN MISSION. (Part-C) 000098ORD/000201/2022-202 ORD/000201/2022-2023 676/CD 23/08/2022 1 15.35 Augmentation of Dumniguru Piped Water Supply Scheme. (SM/10008) 15.35 0
64 Coochbehar Division SHREE RANI SATI ENTERPRISE Providing FHTC laying of Pipe line other allied works at DUMNIGURI PWSS under JAL JEEVAN MISSION. (Part-X) 000098ORD/000203/2022-202 ORD/000203/2022-2023 678/CD 23/08/2022 1 17.98 Augmentation of Dumniguru Piped Water Supply Scheme. (SM/10008) 17.98 0
65 Coochbehar Division RED STAR UNEMPLOYED CO -OPARAT Providing FHTC Laying Of Pipe Line And Construction Of Boundary Wall And Pump House at 3rd Site of NAGARERBARI (ZONE-II) PWSS under JAL JEEVAN MISSION 000098ORD/000204/2022-202 ORD/000204/2022-2023 679/CD 23/08/2022 1 36.99 Rejuvenation of NAGARERBARI Piped Water Supply Scheme (SM/10219) 36.99 36.99
66 Coochbehar Division GOUTAM KUMAR DAS Constructions of 250 Cum OHR as per Departmental Design & drawing , Providing F.H.T.C ,New laying DI Pipe Line & other allied work at CHHAT RAMPUR PWSS under JAL JEEVAN MISSION (PART ¿D) 000098ORD/000217/2022-202 ORD/000217/2022-2023 706/CD 27/08/2022 1 3.9 AUGMENTATION OF GROUND WATER BASED CHHAT RAMPUR PWSS TUFANGANJ I BLOCK WITHIN COOCHBEHAR DISTRICT UNDER COOCHBEHAR DIVISION , PHE DTE (SM/16520) 3.9 3.9
67 Coochbehar Division M/S PRADIP KUMAR PAL Providing FHTC Construction of 250 cum OHR Construction of Pump House & Sinking of Tubewell at JHAUKUTHI PWSS under JAL JEEVAN MISSION (PART ¿A) 000098ORD/000221/2022-202 ORD/000221/2022-2023 710/CD 27/08/2022 1 8.46 Augmentation of JHAUKUTHI Piped Water Supply Scheme (SM/10220) 8.46 0
68 Coochbehar Division NABIN DEBNATH Execution of different works related to BHALKA PWSS under JAL JEEVAN MISSION 000098ORD/000223/2023-202 ORD/000223/2023-2024 397/CD. 23/05/2023 1 44.74 BHALKA PIPED WATER SUPPLY SCHEME (SM/15237) 44.74 0
69 Coochbehar Division CHAKRABORTY ENTERPRISE. Providing FHTC & Addl. laying of Pipe line and other allied works at DHALUABARI PWSS under JAL JEEVAN MISSION. 000098ORD/000236/2022-202 ORD/000236/2022-2023 722/CD 27/08/2022 1 5.2 Augmentation of dhaluabari water supply scheme (SM/09822) 5.2 5.2
70 Coochbehar Division MS BIDYUT SARKAR Providing FHTC & Construction of Pump house at HW site & 2nd Site GOSANIMARI ZONE ¿ I PWSS under JAL JEEVAN MISSION 000098ORD/000240/2022-202 ORD/000240/2022-2023 726/CD 27/08/2022 2 7.55 Augmentation of Gosanimari piped water supply scheme. (SM/10150) 7.55 0
71 Coochbehar Division MATARA CONSTRUCTION CO. Providing FHTC 3rd Site Pump House Boundary Wall SSPost with soakpit Sinking 250mm X 200mm Big diaTubewell & New UPVC Pipe line and other allied works (PART ¿A) at RASHIKBILL ZONE ¿ I PWSS underCooch Behar Division, PHED 000098ORD/000241/2021-202 ORD/000241/2021-2022 890/CD 24/12/2021 1 17.31 Augmentation of Rasikbil piped water supply scheme. (SM/09300) 17.31 0
72 Coochbehar Division SWAPAN KR.SARKAR Providing FHTC & Repairing of OHR B/Wall suplly Stairecase constn of Addl. Phouse at Dhaluabari PWSS under JAL JEEVAN MISSION 000098ORD/000241/2022-202 ORD/000241/2022-2023 727/CD 27/08/2022 1 20.57 Augmentation of dhaluabari water supply scheme (SM/09822) 20.57 20.57
73 Coochbehar Division MATARA CONSTRUCTION CO. Construction of 600 cum OHR Providing FHTC & New UPVC Pipe line & other allied works (PART ¿A) atBALARAMPUR ZONE ¿ I PWSS under Cooch Behar Division, PHED 000098ORD/000250/2021-202 ORD/000250/2021-2022 899/CD 24/12/2021 1 37.69 Retrofitting Cum Rejuvenation of existing ground water baed Balarampur piped water supply scheme (SM/10006) 37.69 37.69
74 Coochbehar Division BIJOY ROY Name of Work: Execution of different works related to KHAGRABARI AREA adjacent to CHAKCHAKA PWSS under JAL JEEVAN MISSION PART N 000098ORD/000255/2023-202 ORD/000255/2023-2024 1022/CD 22/09/2023 1 47.78 AUGUMENTATION OF GROUND WATER BASED CHAKCHAKA ZONE I PWSS COOCHBEHAR II BLOCK WITHIN COOCHBEHAR DISTRICT UNDER COOCHBEHAR DIVISION , PHE DTE (SM/15934) 47.78 47.78
75 Coochbehar Division ABHIJIT KUMAR DAS Name of Work: Execution of different works related to GOPALPUR PWSS under JAL JEEVAN MISSION 000098ORD/000257/2023-202 ORD/000257/2023-2024 1025/CD 22/09/2023 1 11.36 AUGMENTATION OF GROUND WATER BASED GOPALPUR PWSS COOCH BEHAR-II BLOCK WITHIN COOCH BEHAR DISTRICT UNDER COOCH BEHAR DIVISION, P.H.E. DTE. (SM/16146) 11.36 0
76 Coochbehar Division RED STAR UNEMPLOYED CO -OPARAT Name of Work: Execution of different works related to BOXIRHAT PWSS under JAL JEEVAN MISSION PART O 000098ORD/000263/2023-202 ORD/000263/2023-2024 1030/CD 22/09/2023 1 18.37 AUGMENTATION OF BAKSIRHAT PIPED WATER SUPPLY SCHEME (SM/10050) 18.37 0
77 Coochbehar Division GOUTAM KUMAR DAS Name of Work: Execution of different works related to Aug. of BAROKODALI PWSS under JAL JEEVAN MISSION 000098ORD/000264/2023-202 ORD/000264/2023-2024 1032/CD 22/09/2023 1 66.62 AUGMENTATION OF BARA KODALI ZONE-II PWSS (SM/13182) 66.62 0
78 Coochbehar Division UNIQUE ENGINEERS CO OP SOCIETY Name of Work: Execution of different works related to CHHAT RAMPUR PWSS under JAL JEEVAN MISSION PART B 000098ORD/000265/2023-202 ORD/000265/2023-2024 1035/CD 22/09/2023 1 25.1 Augmentation of CHAT RAMPUR DWITIYA KHANDA Piped Water Supply Scheme (SM/10161) 25.1 0
79 Coochbehar Division UTTAM SAHA Name of Work: Execution of different works related to CHHAT RAMPUR PWSS under JAL JEEVAN MISSION PART A 000098ORD/000268/2023-202 ORD/000268/2023-2024 1034/cd 30/09/2023 1 15.91 Augmentation of CHAT RAMPUR DWITIYA KHANDA Piped Water Supply Scheme (SM/10161) 15.91 0
80 Coochbehar Division MATARA CONSTRUCTION CO. Providing FHTC Pump House SSPost & New UPVC Pipe line and other allied works (PART ¿B) at RAKHALMARI PWSS under Cooch Behar Division, PHED 000098ORD/000269/2021-202 ORD/000269/2021-2022 948/CD 31/12/2021 1 13.41 AUGMENTATION OF RAKHALMARI PIPED WATER SUPPLY SCHEME (SM/09299) 13.41 13.41
81 Coochbehar Division S & P ENTERPRISE Construction of 150 cum OHR Providing FHTC Sinking 250mm X 200mm Big dia Tubewell & New UPVC/DI Pipe line & other allied works (PART ¿A) at RAKHALMARI PWSS under Cooch Behar Division, PHED 000098ORD/000275/2021-202 ORD/000275/2021-2022 954/CD 31/12/2021 1 38.41 AUGMENTATION OF RAKHALMARI PIPED WATER SUPPLY SCHEME (SM/09299) 38.41 38.41
82 Coochbehar Division MOTI INDUSTRIES Name of Work: Execution of different works related Chamta & other mouzas at Aug. of SITAI PWSS under JAL JEEVAN MISSION PART X 000098ORD/000276/2023-202 ORD/000276/2023-2024 1043/CD 22/09/2023 1 19.74 Augmentation of Sitai piped water supply scheme. (SM/10147) 19.74 0
83 Coochbehar Division JAINCO TRADERS Execution of different works related to Aug. of SITAI PWSS under JAL JEEVAN MISSION PART-Y 000098ORD/000277/2023-202 ORD/000277/2023-2024 1045/CD 22/09/2023 1 10.93 Augmentation of Sitai piped water supply scheme. (SM/10147) 10.93 0
84 Coochbehar Division SUBHAS CHANDRA ROY Execution of different works related to AUG. of Kurshamari PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 11/1-5/NBC-1; Dt.: 05-04-23 000098ORD/000290/2023-202 ORD/000290/2023-2024 11/CD 05/04/2023 1 24.6 Ground water based KURSHAMARI PWSS (SM/18139) 24.6 0
85 Coochbehar Division TMC- HI- TECH Execution of different works related to CHIT BARA LAUKUTHI PWSS under JAL JEEVAN MISSION 000098ORD/000307/2023-202 ORD/000307/2023-2024 1281/CD 10/11/2023 1 117.82 CHHIT BARA LAUKUTHI PWSS (SM/13865) 117.82 0
86 Coochbehar Division DULAL MAJUMDER Procurement of Chemicals Glassware & consumables for Mekhliganj Sub-District Water testing Laboratories 000098ORD/000312/2022-202 ORD/000312/2022-2023 921/CD 26/09/2022 1 3.13 Procurement of Chemicals & Consumables, Glassware etc. and Annual O & M of water testing laboratories . (SM/06622) 3.13 3.13
87 Coochbehar Division SANKAR BANIK Providing F.H.T.C & Restoration of damage Pipeline allied Work at GOPALPUR Water Supply Scheme P.H.E Dte 000098ORD/000317/2022-202 ORD/000317/2022-2023 926/CD 26/09/2022 1 4.33 BARA GOPALPUR PIPED WATER SUPPLY SCHEME. (SM/13161) 4.33 4.33
88 Coochbehar Division GOPAL CH.GHOSH Execution of different works related to Baneswar Z-II PWSS under JAL JEEVAN MISSION 000098ORD/000319/2023-202 ORD/000319/2023-2024 1301/CD 24/11/2023 1 6.85 AUGMENTATION OF BANESWAR PIPED WATER SUPPLY SCHEME (SM/10152) 6.85 0
89 Coochbehar Division UDAY CHAKI Execution of different works related to JORE SIMULI PWSS under JAL JEEVAN MISSION 000098ORD/000320/2023-202 ORD/000320/2023-2024 1303/CD 24/11/2023 1 4.74 JORE SIMULI PIPED WATER SUPPLY SCHEME (SM/16541) 4.74 0
90 Coochbehar Division MS DD ENTERPRISE Execution of different works related to KHAPAIDANGA PWSS under JAL JEEVAN MISSION 000098ORD/000329/2023-202 ORD/000329/2023-2024 1312/CD 24/11/2023 1 9.06 Rejuvenation of KHAPAIDANGA Water Supply Scheme (SM/10363) 9.06 0
91 Coochbehar Division BIJOY ROY Execution of different works related to BOXIRHAT Z II PWSS under JAL JEEVAN MISSION 000098ORD/000332/2023-202 ORD/000332/2023-2024 1318/CD 24/11/2023 1 12.26 AUGMENTATION OF BAKSIRHAT PIPED WATER SUPPLY SCHEME (SM/10050) 12.26 0
92 Coochbehar Division M/S MAA MANASA CONSTRUCTION CO Execution of different works related to (within RAJPUR area) BHOGDABRI PWSS under JAL JEEVAN MISSION 000098ORD/000335/2023-202 ORD/000335/2023-2024 1324/CD 24/11/2023 1 19.38 BHOGDABARI PIPED WATER SUPPLY SCHEME. (SM/13164) 19.38 0
93 Coochbehar Division SAIMONS CO- OPARATIVE LAB CONT Execution of different works related to KHARIKABARI PWSS under JAL JEEVAN MISSION 000098ORD/000336/2023-202 ORD/000336/2023-2024 1320/CD 24/11/2023 1 41.07 AUGMENTATION OF KHARIKABARIPIPED WATER SUPPLY SCHEME (SM/15932) 41.07 0
94 Coochbehar Division PINAKI SAHA Providing FHTC Laying of Pipe Line & other allied works at KHATERBARI PWSS under JAL JEEVAN MISSION 000098ORD/000342/2022-202 ORD/000342/2022-2023 995/CD 29/09/2022 1 11.8 GROUND WATER BASED KHATERBARI PIPED WATER SUPPLY SCHEME (SM/18135) 11.8 0
95 Coochbehar Division GOUTAM KUMAR DAS Execution of different works related to BRAHMATTAR KASALDANGA PWSS under JAL JEEVAN MISSION 000098ORD/000345/2023-202 ORD/000345/2023-2024 1329/CD 24/11/2023 1 22.5 BRAHMOTTAR KASAL DANGA PIPED WATER SUPPLY SCHEME. (SM/13214) 22.5 0
96 Coochbehar Division SHIBA ENTERPRISE Execution of different works related to CHHOTO SAKDAL ADJACENT TO SATKURA PWSS PWSS under JAL JEEVAN MISSION 000098ORD/000346/2023-202 ORD/000346/2023-2024 1330/CD 24/11/2023 1 23.33 REJUVENATION OF SATKURA PIPED WATER SUPPLY SCHEME (SM/13160) 23.33 0
97 Coochbehar Division MS BIDYUT SARKAR Execution of different works related to DAWAGURI PWSS under JAL JEEVAN MISSION 000098ORD/000353/2023-202 ORD/000353/2023-2024 1337/CD 24/11/2023 1 16.87 AUGMENTATION OF DAUAGURI PIPED WATER SUPPLY SCHEME (SM/09297) 16.87 0
98 Coochbehar Division AASHIRBAD ENTERPRISE Providing FHTC & other allied works at CHHATOA PWSS under JAL JEEVAN MISSION 000098ORD/000355/2022-202 ORD/000355/2022-2023 3008/CD 29/09/2022 1 4.67 Rejuvination of Chhatoa water supply scheme (SM/09819) 4.67 0
99 Coochbehar Division NEW GOLDEN COOPARATIVE LAB CON Execution of different works related to SITALKUCHI Z1 PWSS under JAL JEEVAN MISSION 000098ORD/000362/2023-202 ORD/000362/2023-2024 1395/CD 05/12/2023 1 7.67 AUGMENTATION OF GROUND WATER BASED SITALKUCHI WATER SUPPLY SCHEME ZONE-I TO ACCOMMODATE FHTC IN SITALKUCHI BLOCK (SM/13316) 7.67 0
100 Coochbehar Division M/S SURAJIT MAJUMDER Execution of different works related to CHAKIARCHARA PWSS under JAL JEEVAN MISSION 000098ORD/000367/2023-202 ORD/000367/2023-2024 1392/CD 05/12/2023 1 6.61 AUGMENTATION OF CHEKIACHARA PIPED WATER SUPPLY SCHEME (SM/12371) 6.61 0
101 Coochbehar Division MODERN UN-EMP CO-OPT LABOUR CO Execution of different works related to GHOSKADANGA PWSS under JAL JEEVAN MISSION 000098ORD/000368/2023-202 ORD/000368/2023-2024 1391/CD 05/12/2023 1 16.04 AUGMENTATION OF GHOKSADANGA PIPED WATER SUPPLY SCHEME (SM/11977) 16.04 0
102 Coochbehar Division UDAY CHAKI Execution of different works related to UCHALPUKURI PWSS under JAL JEEVAN MISSION 000098ORD/000369/2023-202 ORD/000369/2023-2024 1390/CD 05/12/2023 1 9.22 Augmentation of Ground Water Based UCHALPUKURI ZONE-II Piped Water Supply Scheme to Accommodate FHTC in Mekhliganj Block within Cooch Behar District under Cooch Behar Division, P.H.E. Dte. (SM/13157) 9.22 0
103 Coochbehar Division SIBAPADA SINGHA ROY Execution of different works related to PUTIA BAROMASIA PWSS under JAL JEEVAN MISSION 000098ORD/000370/2023-202 ORD/000370/2023-2024 1389/CD 05/12/2023 1 6.89 Augmentation of Ground Water Based Putia Bara Masia Zone-I PWSS (Sitalkuchi Block) (SM/13155) 6.89 0
104 Coochbehar Division AASHIRBAD ENTERPRISE Execution of different works related to BHURKUSH PWSS under JAL JEEVAN MISSION 000098ORD/000376/2023-202 ORD/000376/2023-2024 1360/CD 05/12/2023 1 34.01 AUGMENTATION OF GROUND WATER BASED BHURKUSH PWSS TAFANGANJ-I BLOCK WITHIN COOCH BEHAR DISTRICT UNDER COOCH BEHAR DIVISION, P.H.E. DTE. (SM/13859) 34.01 0
105 Coochbehar Division MS SSB CONSTRUCTION CO Execution of different works related to TUTIARKUTHI PWSS under JAL JEEVAN MISSION 000098ORD/000394/2023-202 ORD/000394/2023-2024 1366/CD 05/12/2023 1 53.38 Augmentation of Tutiarkuthi Piped Water Supply Scheme. (SM/15930) 53.38 0
106 Coochbehar Division M/S. MANDAL CONSTRUCTION Execution of different works related to CHAKCHAKA Z I&II PWSS under JAL JEEVAN MISSION 000098ORD/000395/2023-202 ORD/000395/2023-2024 1367/CD 05/12/2023 1 65.06 AUGUMENTATION OF GROUND WATER BASED CHAKCHAKA ZONE I PWSS COOCHBEHAR II BLOCK WITHIN COOCHBEHAR DISTRICT UNDER COOCHBEHAR DIVISION , PHE DTE (SM/15934) 65.06 0
107 Coochbehar Division KRISHCHAK TRADING PRIVATE LIMI Execution of different works related to KAMINIRGHAT PWSS under JAL JEEVAN MISSION 000098ORD/000397/2023-202 ORD/000397/2023-2024 1369/CD 05/12/2023 1 22.54 AUGMENTATION OF KAMINIRGHAT PIPED WATER SUPPLY SCHEME (SM/09810) 22.54 0
108 Coochbehar Division SUBHAS CHANDRA ROY Laying of Pipe Line & Construction Of 250 CUM OHR At BARA PINJARER JHAR PWSS under JAL JEEVAN MISSION 000098ORD/000400/2022-202 ORD/000400/2022-2023 1133/CD W 03/11/2022 1 8.01 BARA PINJARIRJHAR PIPED WATER SUPPLY SCHEME. (SM/13163) 8.01 0
109 Coochbehar Division CHAKRABORTY ENTERPRISE Execution of different works related to AUG. of GURIAHATIZ1 & 2 PWSS under JAL JEEVAN MISSION 000098ORD/000407/2023-202 ORD/000407/2023-2024 1374/CD 05/12/2023 1 5.15 AUGMENTATION OF GURIAHATI PIPED WATER SUPPLY SCHEME (SM/09298) 5.15 0
110 Coochbehar Division MS BIDYUT SARKAR Providing FHTC & other allied works at GOSANIMARI ZONE - I PWSS under JAL JEEVAN MISSION 000098ORD/000413/2022-202 ORD/000413/2022-2023 1224/CD 28/11/2022 1 99.41 Augmentation of Gosanimari piped water supply scheme. (SM/10150) 99.41 99.41
111 Coochbehar Division SANKAR BANIK Name of Work: Execution of different works related to SINGIMARI PASCHIMPAR PWSS under JAL JEEVAN MISSION 000098ORD/000415/2023-202 ORD/000415/2023-2024 1470/CD 20/12/2023 1 9.53 Rejuvenation of SINGIMARI PASCHIMPAR Water Supply Scheme (SM/10362) 9.53 0
112 Coochbehar Division HIRAK CONSTRUCTION Providing FHTC & other allied works at RASIKBILL ZONE ¿ I PWSS under JAL JEEVAN MISSION 000098ORD/000416/2022-202 ORD/000416/2022-2023 1226/CD 28/11/2022 2 33.4 Augmentation of Rasikbil piped water supply scheme. (SM/09300) 33.4 33.4
113 Coochbehar Division UTPAL CHAKRABORTY Execution of different works related to BILSI PWSS under JAL JEEVAN MISSION 000098ORD/000418/2023-202 ORD/000418/2023-2024 1473/CD 20/12/2023 1 23.87 AUGMENTATION OF BILSI PIPED WATER SUPPLY SCHEME (SM/16156) 23.87 0
114 Coochbehar Division S AND P ENTERPRISE Providing functional house hold tap connection (FHTC), including Sinking of Big dia T/W, Construction of Pump house, installation of IEP with other allied works in connection with Augmentation work of DAKSHIN BAJEJAMA Piped Water Supply Scheme under Cooch 000098ORD/000419/2021-202 ORD/000419/2021-2022 1517/CD 15/03/2022 1 48.88 Augmentation of Dakshin Bajejama Water Supply Scheme. (SM/09807) 48.88 48.88
115 Coochbehar Division S AND P ENTERPRISE Construction of 450 cum OHR Providing FHTC & New UPVC Pipe line & other allied works (PART ¿A) at SITAI ZONE ¿ I I PWSS under Cooch Behar Division, PHED 000098ORD/000420/2021-202 ORD/000420/2021-2022 1518/CD 15/03/2022 1 149.54 Augmentation of Sitai piped water supply scheme. (SM/10147) 149.54 149.54
116 Coochbehar Division SANJAY MANDAL Execution of different works related to CHHITRIBARI PWSS under JAL JEEVAN MISSION 000098ORD/000421/2023-202 ORD/000421/2023-2024 1477/CD 20/12/2023 1 34.07 CHHITRI BARI PIPED WATER SUPPLY SCHEME. (SM/13213) 34.07 0
117 Coochbehar Division MS SSB CONSTRUCTION CO Execution of different works related to KHARIJA DURGANAGAR PWSS under JAL JEEVAN MISSION 000098ORD/000424/2023-202 ORD/000424/2023-2024 1480/CD 20/12/2023 1 72.76 KHARIJA DURGANAGAR DWITIYA KHANDA PWSS (SM/14449) 72.76 0
118 Coochbehar Division NABIN DEBNATH Construction of 300 cum OHR Providing FHTC New Pipe line & other allied works (PART ¿A) at ANDARAN FULBARI ZONE-II PWSS under Cooch Behar Division, PHED 000098ORD/000425/2021-202 ORD/000425/2021-2022 1475/CD 10/03/2022 2 26.9 AUGMENTATION OF ANDARAN PHULBARI PIPED WATER SUPPLY SCHEME (SM/10049) 26.9 26.9
119 Coochbehar Division SWAPAN KUMAR ROY Construction of 300 cum OHR Providing FHTC New Pipe line & other allied works (PART ¿A) at ANDARAN FULBARI ZONE-I PWSS under Cooch Behar Division, PHED 000098ORD/000426/2021-202 ORD/000426/2021-2022 1476/CD 10/03/2022 1 7 AUGMENTATION OF ANDARAN PHULBARI PIPED WATER SUPPLY SCHEME (SM/10049) 7 7
120 Coochbehar Division SHIBA ENTERPRISE Providing FHTC, Construction of boundary wall, repairing of reservior,baoundary wall and laying new UPVC pipe line and other allied works at in-connection with augmentation KAUWARDARA PWSS under Cooch Behar Division, PHED.(Part-A) 000098ORD/000428/2021-202 ORD/000428/2021-2022 1524/CD 15/03/2022 2 27.63 Augmentation of Kauardara Water Supply Scheme (SM/09808) 27.63 27.63
121 Coochbehar Division S.G ENTERPRISE Execution of different works related to KHARIJA BALADANGA PWSS under JAL JEEVAN MISSION 000098ORD/000428/2023-202 ORD/000428/2023-2024 1484./CD 20/12/2023 1 67.44 KHARIJA BALADANGA PIPED WATER SUPPLY SCHEME (SM/13490) 67.44 0
122 Coochbehar Division DILIP MAHATO Providing FHTC & Laying of Pipe line and other allied works at MORADANGA ZONE ¿ I PWSS under Cooch Behar Division, PHED (PART ¿B) 000098ORD/000429/2022-202 ORD/000429/2022-2023 1331/CD 19/12/2022 1 42.89 Augmentation of MARADANGA Piped Water Supply Scheme (SM/14112) 42.89 0
123 Coochbehar Division GHOSH AND SAHA CONSTRUCTION Providing FHTC, Sinking of big dia tube well( 250 mm X 200 mm), Construction of pump house, boundary wall, Repairing of boundary wall at head work site and laying of UPVC pipe line and other allied works at in-connection with augmentation NALANGIBARI P 000098ORD/000430/2021-202 ORD/000430/2021-2022 1526/CD 15/03/2022 2 44 Augumentation of Nalangibari Water Supply scheme (SM/09823) 44 33
124 Coochbehar Division SHREE RANI SATI ENTERPRISE Providing FHTC Construction of 550 cum OHR and Laying of Pipe line Construction of Pump House & B/Wall at HWS Sinking of Tubewell at MORADANGA ZONE ¿ I PWSS under JAL JEEVAN MISSION (PART ¿A) 000098ORD/000430/2022-202 ORD/000430/2022-2023 1332/CD 19/12/2022 1 18.09 Augmentation of MARADANGA Piped Water Supply Scheme (SM/14112) 18.09 0
125 Coochbehar Division Z STAR COMMOTRADE PVT LTD Providing FHTC Construction of 300 cum OHR and Laying of Pipe line at MORADANGA ZONE ¿ I I PWSS under JAL JEEVAN MISSION (PART ¿A) 000098ORD/000431/2022-202 ORD/000431/2022-2023 1333/CD 19/12/2022 1 13.17 Augmentation of MARADANGA Piped Water Supply Scheme (SM/14112) 13.17 13.17
126 Coochbehar Division SAIMONS CO- OPARATIVE LAB CONT Providing FHTC, Construction of boundary wall, repairing of reservior,baoundary wall and laying new UPVC pipe line and other allied works at in-connection with augmentation KAUWARDARA PWSS under Cooch Behar Division, PHED. .(Part-B) 000098ORD/000432/2021-202 ORD/000432/2021-2022 1527/CD 15/03/2022 2 8.73 Augmentation of Kauardara Water Supply Scheme (SM/09808) 8.73 1.78
127 Coochbehar Division PATLAKHOWA UN EMP CO OP LAB CO Providing FHTC, Street stand post along with soakpit, New laying of UPVC/DI Pipe Line & Other allied works at BANESWAR ZONE- III under Cooch Behar Division, P.H.E Dte. (PART-D) 000098ORD/000435/2021-202 ORD/000435/2021-2022 1436/CD 10/03/2022 1 10.75 AUGMENTATION OF BANESWAR PIPED WATER SUPPLY SCHEME (SM/10152) 10.75 0
128 Coochbehar Division MODERN UN-EMP CO-OPT LABOUR CO Providing FHTC, Construction of sluice valve chamber and Street stand post along with soakpit , New laying of UPVC/DI Pipe Line & Other allied works at Baneswar Zone-II (Part-C) PWSS under Cooch Behar Division, P.H.E Dte. 000098ORD/000437/2021-202 ORD/000437/2021-2022 1429/CD 10/03/2022 1 10.87 AUGMENTATION OF BANESWAR PIPED WATER SUPPLY SCHEME (SM/10152) 10.87 0
129 Coochbehar Division MS HOSSEN ELECTRICALS Execution of different works related to DARIBASH PRATHAM KHANDA PWSS under JAL JEEVAN MISSION 000098ORD/000437/2023-202 ORD/000437/2023-2024 1414/CD 06/12/2023 1 94.19 Daribash Pratham Khanda (SM/14948) 94.19 0
130 Coochbehar Division GOPAL CH.GHOSH Providing FHTC, Street stand post along with soakpit , New laying of UPVC/DI Pipe Line & Other allied works at Baneswar Zone-II (Part-E) PWSS under Cooch Behar Division, P.H.E Dte. 000098ORD/000438/2021-202 ORD/000438/2021-2022 1430/CD 10/03/2022 1 17.83 AUGMENTATION OF BANESWAR PIPED WATER SUPPLY SCHEME (SM/10152) 17.83 0
131 Coochbehar Division MATRI ENTERPRISEES Providing FHTC, Constructions 3.6 m x 3.0 m switch room & Boundary wall, Street stand post along with soakpit , New laying of UPVC/DI Pipe Line & Other allied works at Baneswar Zone-II (Part-B) PWSS under Cooch Behar Division, P.H.E Dte. 000098ORD/000442/2021-202 ORD/000442/2021-2022 1434/CD 10/03/2022 1 24.6 AUGMENTATION OF BANESWAR PIPED WATER SUPPLY SCHEME (SM/10152) 24.6 0
132 Coochbehar Division GHOSH AND SAHA CONSTRUCTION Execution of different works related to NAHARHATBANDAR PWSS under JAL JEEVAN MISSIONSE NBC1/PHED A. O.: 977/1-5/NBC-1; DT: 19-01-23 000098ORD/000457/2022-202 ORD/000457/2022-2023 1508/CD 19/01/2023 1 160 AUGMENTATION OF NAHARHAT BANDAR PIPED WATER SUPPLY SCHEME (SM/11486) 160 160
133 Coochbehar Division NABIN DEBNATH Execution of different works related to PUTIMARI BAKSIBAS PWSS under JAL JEEVAN MISSIONSE NBC1/PHED A. O.: 978/1-5/NBC-1; DT: 19-01-23 000098ORD/000458/2022-202 ORD/000458/2022-2023 1509/CD 19/01/2023 2 74.37 PUTIMARI BAKSIBAS PIPED WATER SUPPLY SCHEME. (SM/13816) 74.37 0
134 Coochbehar Division M/S. DUTTA AND CO Execution of different works related to BHANGRI PRATHAM KHANDA PWSS under JAL JEEVAN MISSIONSE NBC1/PHED A. O.: 979/1-5/NBC-1; DT: 19-01-23 000098ORD/000459/2022-202 ORD/000459/2022-2023 1510/CD 19/01/2023 2 259 BHANGRI PRATHAM KHANDA PIPED WATER SUPPLY SCHEME. (SM/13461) 259 173.09
135 Coochbehar Division TAPAN CHANDA Providing FHTC 3rd Site Pump House Boundary Wall SSPost with soakpit Sinking 250mm X 200mm Big dia Tubewell & NewUPVC Pipe line and other allied works (PART ¿A) at GOSANIMARI ZONE ¿ I I PWSS under Cooch Behar Division, PHED 000098ORD/000460/2021-202 ORD/000460/2021-2022 1610/CD 24/03/2022 1 90 Augmentation of Gosanimari piped water supply scheme. (SM/10150) 90 90
136 Coochbehar Division DILIP MAHATO Execution of different works related to DHANG DHINGGURI PWSS under JAL JEEVAN MISSIONSE NBC1/PHED A. O.: 980/1-5/NBC-1; DT: 19-01-23 000098ORD/000460/2022-202 ORD/000460/2022-2023 1511/CD 19/01/2023 1 67.91 DHANG DHINGGURI PWSS (SM/13460) 67.91 0
137 Coochbehar Division HARIDAS GHOSH Execution of different works related to KOCHABARI PWSS under JAL JEEVAN MISSIONSE NBC1/PHED A. O.: 983/1-5/NBC-1; DT: 19-01-23 000098ORD/000463/2022-202 ORD/000463/2022-2023 1514/CD 19/01/2023 1 60.87 KOCHABARI PIPED WATER SUPPLY SCHEME. (SM/13342) 60.87 60.87
138 Coochbehar Division ASHIM KUMAR CHAKRABORTY Execution of different works related to ICHAMARI PWSS under JAL JEEVAN MISSIONSE NBC1/PHED A. O.: 984/1-5/NBC-1; DT: 19-01-23 000098ORD/000464/2022-202 ORD/000464/2022-2023 1515/CD 19/01/2023 1 36.97 ICHAMARI PIPED WATER SUPPLY SCHEME. (SM/13119) 36.97 0
139 Coochbehar Division ASHIM KUMAR CHAKRABORTY Providing FHTC 3rd Site Pump House Boundary Wall SSPost with soak pit Sinking 250mm X 200mm Big dia Tubewell & New UPVC/DI/GI Pipe line and other allied works (PART ¿B) at CHILAKHANA PWSS under Cooch Behar Division, PHED 000098ORD/000465/2021-202 ORD/000465/2021-2022 1605/CD 24/03/2022 1 22.99 Augmentation of Chilakhana piped water supply scheme. (SM/10148) 22.99 22.99
140 Coochbehar Division M/S. NITYAGOPAL BANIK Execution of different works related to CHHITRI BARI PWSS under JAL JEEVAN MISSIONSE NBC1/PHED A. O.: 985/1-5/NBC-1; DT: 19-01-23 000098ORD/000465/2022-202 ORD/000465/2022-2023 1516/CD 19/01/2023 1 9.27 CHHITRI BARI PIPED WATER SUPPLY SCHEME. (SM/13213) 9.27 9.27
141 Coochbehar Division MESSRS A.B.G CONSTRUCTION Providing FHTC 3rd Site Pump House Boundary Wall SSPost with soak pit Sinking 250mm X 200mm Big dia Tubewell & New UPVC/DI/GI Pipe line and other allied works (PART ¿B) at SITAI ZONE ¿ I I PWSS under Cooch Behar Division, PHED 000098ORD/000466/2021-202 ORD/000466/2021-2022 1604/CD 24/03/2022 2 11.55 Augmentation of Sitai piped water supply scheme. (SM/10147) 11.55 5.72
142 Coochbehar Division BIPASHA MAHANTA BANIK Collection of House Hold Details at Prescribed Format through Mobile App / Hard Copy including Geo-Reference of Mathabhanga-I (MAHISHKUCHI ZONE-I PWSS) Water Supply Scheme under Cooch Behar Division, PHED. 000098ORD/000466/2023-202 ORD/000466/2023-2024 211/CD 05/02/2024 1 0.98 AUGMENTATION OF GROUND WATER BASED MAHISHKUCHI ZONE-I PIPED WATER SUPPLY SCHEME OF TUFANGUNJ-II BLOCK WITHIN COOCHBEHAR DISTRICT (SM/16149) 0.98 0
143 Coochbehar Division MS BIDYUT SARKAR Providing FHTC 3rd Site Pump House Boundary Wall SSPost with soak pit Sinking 250mm X 200mm Big dia Tubewell & New UPVC Pipe line and other allied works (PART ¿B) at GOSANIMARI ZONE ¿ I PWSS under Cooch Behar Division, PHED 000098ORD/000467/2021-202 ORD/000467/2021-2022 1603/CD 24/03/2022 1 7.92 Augmentation of Gosanimari piped water supply scheme. (SM/10150) 7.92 0
144 Coochbehar Division BIPASHA MAHANTA BANIK Collection of House Hold Details at Prescribed Format through Mobile App / Hard Copy including Geo-Reference of Mathabhanga-II (MAHISHKUCHI ZONE-I PWSS) Water Supply Scheme under Cooch Behar Division, PHED. 000098ORD/000467/2023-202 ORD/000467/2023-2024 212/CD 05/02/2024 1 0.98 AUGMENTATION OF GROUND WATER BASED MAHISHKUCHI ZONE-I PIPED WATER SUPPLY SCHEME OF TUFANGUNJ-II BLOCK WITHIN COOCHBEHAR DISTRICT (SM/16149) 0.98 0
145 Coochbehar Division BIPASHA MAHANTA BANIK Collection of House Hold Details at Prescribed Format through Mobile App / Hard Copy including Geo-Reference of Mekhliganj (MAHISHKUCHI ZONE-I PWSS) Water Supply Scheme under Cooch Behar Division, PHED. 000098ORD/000468/2023-202 ORD/000468/2023-2024 213/CD 05/02/2024 1 0.98 AUGMENTATION OF GROUND WATER BASED MAHISHKUCHI ZONE-I PIPED WATER SUPPLY SCHEME OF TUFANGUNJ-II BLOCK WITHIN COOCHBEHAR DISTRICT (SM/16149) 0.98 0
146 Coochbehar Division LONGLAST PIPES (INDIA) PVT. LT Providing FHTC Laying Of Pipe Line And Construction Of Boundary Wall And Pump House At HW Site At KALARAYER KUTHE (ZONE-II) PWSS under JAL JEEVAN MISSION (Part-B2) 000098ORD/000469/2022-202 ORD/000469/2022-2023 1520/CD 19/01/2023 1 59.95 AUGMENTATION OF KALARAYERKUTHI PIPED WATER SUPPLY SCHEME (SM/14183) 59.95 0
147 Coochbehar Division BIPASHA MAHANTA BANIK Collection of House Hold Details at Prescribed Format through Mobile App / Hard Copy including Geo-Reference of Haldibari (MAHISHKUCHI ZONE-I PWSS) Water Supply Scheme under Cooch Behar Division, PHED. 000098ORD/000469/2023-202 ORD/000469/2023-2024 214/CD 05/02/2024 1 0.98 AUGMENTATION OF GROUND WATER BASED MAHISHKUCHI ZONE-I PIPED WATER SUPPLY SCHEME OF TUFANGUNJ-II BLOCK WITHIN COOCHBEHAR DISTRICT (SM/16149) 0.98 0
148 Coochbehar Division SUSHANTA SAHA Providing FHTC Laying Of Pipe Line And Construction Of Boundary Wall And Pump House At HW Site At KALARAYER KUTHE (ZONE-III) PWSS under JAL JEEVAN MISSION (Part-B1) 000098ORD/000476/2022-202 ORD/000476/2022-2023 1531/CD 20/01/2023 1 21.41 AUGMENTATION OF KALARAYERKUTHI PIPED WATER SUPPLY SCHEME (SM/14183) 21.41 0
149 Coochbehar Division GEETA CONSTRUCTION Execution of different works related to RUIERKUTHI PWSS under JAL JEEVAN MISSION 000098ORD/000476/2023-202 ORD/000476/2023-2024 278/CD 09/02/2024 1 42.42 RUIER KHUTHI PIPED WATER SUPPLY SCHEME (SM/13317) 42.42 0
150 Coochbehar Division SANKAR CHAKRABORTY PROVIDING FHTC LAYING OF PIPE LINE AT KALARAYER KUTHE (ZONE-I) PWSS under JAL JEEVAN MISSION (PART ¿A) 000098ORD/000479/2022-202 ORD/000479/2022-2023 1534/CD 20/01/2023 1 18.57 AUGMENTATION OF KALARAYERKUTHI PIPED WATER SUPPLY SCHEME (SM/14183) 18.57 0
151 Coochbehar Division CHAKRABORTY ENTERPRISE. PROVIDING FHTC LAYING OF PIPE LINE AT KALARAYER KUTHE (ZONE-II) PWSS under JAL JEEVAN MISSION (PART ¿C) 000098ORD/000480/2022-202 ORD/000480/2022-2023 1535/CD 20/01/2023 1 3.04 AUGMENTATION OF KALARAYERKUTHI PIPED WATER SUPPLY SCHEME (SM/14183) 3.04 3.04
152 Coochbehar Division SANJAY MANDAL Execution of different works related to (with in B Chilakhana Z1) DEOCHARAI PWSS under JAL JEEVAN MISSION 000098ORD/000480/2023-202 ORD/000480/2023-2024 283/CD 09/02/2024 1 14.18 Augmentation of Bajejama Chilakhana ZONE-I PWSS (SM/16931) 14.18 0
153 Coochbehar Division GEETA CONSTRUCTION Execution of different works related to RUIER KHUTHI PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1000/1-5/NBC-1; Dt.: 24-01-23 000098ORD/000483/2022-202 ORD/000483/2022-2023 1548/CD 24/01/2023 1 83.22 RUIER KHUTHI PIPED WATER SUPPLY SCHEME (SM/13317) 83.22 0
154 Coochbehar Division MATRI ENTERPRISEES Execution of different works related to JHINGAPUNI PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1001/1-5/NBC-1; Dt.: 24-01-23 000098ORD/000485/2022-202 ORD/000485/2022-2023 1550/CD 24/01/2023 1 47.86 JHINGAPUNI PIPED WATER SUPPLY SCHEME (SM/13881) 47.86 0
155 Coochbehar Division SHRI ANNAPURNA DISTRIBUTORS Execution of different works related to PRAN MAJUMDER PWSS under JAL JEEVAN MISSION PART C 000098ORD/000485/2023-202 ORD/000485/2023-2024 287/CD 09/02/2024 1 49.93 GROUND WATER BASED PRAN MAJUMDER PIPED WATER SUPPLY AUGMENTATION SCHEME (SM/16525) 49.93 0
156 Coochbehar Division GOUTAM KUMAR DAS Execution of different works related to FALIMARI ZONE I PWSS under JAL JEEVAN MISSION 000098ORD/000487/2023-202 ORD/000487/2023-2024 289/CD 09/02/2024 1 79.07 FALIMARI PIPED WATER SUPPLY SCHEME (SM/18616) 79.07 0
157 Coochbehar Division PALLAB BHAWAL Execution of different works related to UCHALPUKURI ZONE -I PWSS under JAL JEEVAN MISSION SE,NBC-1,PHED A.O. No.: 1017/1-5/NBC-1; Dt.: 24-01-23 000098ORD/000489/2022-202 ORD/000489/2022-2023 1554/CD 24/01/2023 1 129.3 AUGMENTATION OF UCHAL PUKHARI ZONE-I PUBLICWATER SUPPLY SCHEME. (SM/13228) 129.3 0
158 Coochbehar Division SHIBA ENTERPRISE Execution of different works related to SATKURA PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1015/1-5/NBC-1; Dt.: 24-01-23 000098ORD/000491/2022-202 ORD/000491/2022-2023 1556/CD 24/01/2023 1 84.04 REJUVENATION OF SATKURA PIPED WATER SUPPLY SCHEME (SM/13160) 84.04 84.04
159 Coochbehar Division Z STAR COMMOTRADE PVT LTD Execution of different works related to SITALKUCHI ZONE -III PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1014/1-5/NBC-1; Dt.: 24-01-23 000098ORD/000492/2022-202 ORD/000492/2022-2023 1557/CD 24/01/2023 1 28.95 AUGMENTATION OF GROUND WATER BASED SITALKUCHI WATER SUPPLY SCHEME ZONE-III TO ACCOMMODATE FHTC IN SITALKUCHI BLOCK (SM/13379) 28.95 28.95
160 Coochbehar Division M/S SURAJIT MAJUMDER Execution of different works related to (Kismat Bhatrigachhi area) CHHOTO BOALMARI PWSS under JAL JEEVAN MISSION 000098ORD/000492/2023-202 ORD/000492/2023-2024 294/CD 09/02/2024 1 19.47 CHHOTO BOALMARI PIPED WATER SUPPLY SCHEME. (SM/18240) 19.47 0
161 Coochbehar Division MANABENDRA DE Execution of different works related to KUCHLIBARI Z 2 PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1013/1-5/NBC-1; Dt.: 24-01-23 000098ORD/000493/2022-202 ORD/000493/2022-2023 1558/CD 24/01/2023 1 15 AUGMENTATION OF GROUND WATER BASED KUCHLIBARI ZONE-II PWSS (SM/13225) 15 15
162 Coochbehar Division SANKAR BANIK Execution of different works related to (Matikata area) CHANDAN CHOWRA PWSS under JAL JEEVAN MISSION 000098ORD/000493/2023-202 ORD/000493/2023-2024 295/CD 09/02/2024 1 24.82 CHANDAN CHOWRA PIPED WATER SUPPLY SCHEME (SM/14134) 24.82 0
163 Coochbehar Division UTPAL CHAKRABORTY Execution of different works related to SANTOSHPUR ZONE-I PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1010/1-5/NBC-1; Dt.: 24-01-23 000098ORD/000496/2022-202 ORD/000496/2022-2023 1561/CD 24/01/2023 1 80.38 Augmentation of Santoshpur Zone-I PWSS Accommodate FHTC in TFG-I Block under Cooch Behar Division. (SM/13385) 80.38 80.38
164 Coochbehar Division SENGUPTA ENTERPRISE Extension Work for Uploading charges of (https://ejalshakti.gov.in/imisreports/IMISReportLogin.aspx) related to FHTC under Jal Jeevan Mission in presence of JJM Login authority under Cooch Behar Division, PHE Dte. (BRAHMOTTAR KASAL DANGA )(Part-A) 000098ORD/000497/2023-202 ORD/000497/2023-2024 1538/CD 29/12/2023 1 0.97 BRAHMOTTAR KASAL DANGA PIPED WATER SUPPLY SCHEME. (SM/13214) 0.97 0
165 Coochbehar Division HARIDAS GHOSH Execution of different works related to BAROKODALI ZONE - I PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1008/1-5/NBC-1; Dt.: 24-01-23 000098ORD/000498/2022-202 ORD/000498/2022-2023 1563/CD 24/01/2023 1 32.61 AUGMENTATION OF GROUND WATER BASED BARAKODALI ZONE-I PIPED WATER SUPPLY SCHEME TO ACCOMMODATE FHTC IN TUFANGANJ-II BLOCK WITHIN COOCH BEHAR DISTRICT UNDER COOCH BEHAR DIVISION, P.H.E. DTE. (SM/13181) 32.61 0
166 Coochbehar Division SENGUPTA ENTERPRISE Extension Work for Uploading charges of (https://ejalshakti.gov.in/imisreports/IMISReportLogin.aspx) related to FHTC under Jal Jeevan Mission in presence of JJM Login authority under Cooch Behar Division, PHE Dte.(BRAHMOTTAR KASAL DANGA ) (Part-B) 000098ORD/000498/2023-202 ORD/000498/2023-2024 1539/CD 29/12/2023 1 0.97 BRAHMOTTAR KASAL DANGA PIPED WATER SUPPLY SCHEME. (SM/13214) 0.97 0
167 Coochbehar Division SENGUPTA ENTERPRISE Extension Work for Uploading charges of https://ejalshakti.gov.in/imisreports/IMISReportLogin.aspx) related to FHTC under Jal Jeevan Mission in presence of JJM Login authority under Cooch Behar Division, PHE Dte. (BRAHMOTTAR KASAL DANGA ) (Part-C) 000098ORD/000499/2023-202 ORD/000499/2023-2024 1540/CD 29/12/2023 1 0.97 BRAHMOTTAR KASAL DANGA PIPED WATER SUPPLY SCHEME. (SM/13214) 0.97 0
168 Coochbehar Division LONGLAST PIPES (INDIA) PVT. LT Sinking of 250mm x 200 mm Big dia. Tube well with UPVC Pipes & Strainer at 3rd Site of MARICHBARI PWSS under Cooch Behar Division PHE Dte. 000098ORD/000500/2021-202 ORD/000500/2021-2022 1448/CD 10/03/2022 1 10.65 Rejuvenation of MARICHBARI Water Supply Scheme (SM/10369) 10.65 10.65
169 Coochbehar Division HARIDAS GHOSH Execution of different works related to AUG. of BAJEJAMA CHILAKHANA ZONE-III PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1006/1-5/NBC-1; Dt.: 24-01-23 000098ORD/000500/2022-202 ORD/000500/2022-2023 1565/CD 24/01/2023 1 39.9 Augmentatin of Bajejama Chilakhana Zone-III PWSS Accomodate FHTC in TFG-I BLOCK (SM/13378) 39.9 0
170 Coochbehar Division SENGUPTA ENTERPRISE Extension Work for Uploading charges of https://ejalshakti.gov.in/imisreports/IMISReportLogin.aspx) related to FHTC under Jal Jeevan Mission in presence of JJM Login authority under Cooch Behar Division, PHE Dte. (BRAHMOTTAR KASAL DANGA ) (Part-D) 000098ORD/000500/2023-202 ORD/000500/2023-2024 1541/CD 29/12/2023 1 0.97 BRAHMOTTAR KASAL DANGA PIPED WATER SUPPLY SCHEME. (SM/13214) 0.97 0
171 Coochbehar Division SENGUPTA ENTERPRISE Extension Work for Uploading charges of https://ejalshakti.gov.in/imisreports/IMISReportLogin.aspx) related to FHTC under Jal Jeevan Mission in presence of JJM Login authority under Cooch Behar Division, PHE Dte. ( BRAHMOTTAR KASAL DANGA )(Part-E) 000098ORD/000501/2023-202 ORD/000501/2023-2024 1542/CD 29/12/2023 1 0.97 BRAHMOTTAR KASAL DANGA PIPED WATER SUPPLY SCHEME. (SM/13214) 0.97 0
172 Coochbehar Division SENGUPTA ENTERPRISE Extension Work for Uploading charges of https://ejalshakti.gov.in/imisreports/IMISReportLogin.aspx) related to FHTC under Jal Jeevan Mission in presence of JJM Login authority under Cooch Behar Division, PHE Dte.(BRAHMOTTAR KASAL DANGA ) (Part-F) 000098ORD/000502/2023-202 ORD/000502/2023-2024 1544/CD 29/12/2023 1 0.97 BRAHMOTTAR KASAL DANGA PIPED WATER SUPPLY SCHEME. (SM/13214) 0.97 0
173 Coochbehar Division RAJAT ROY Providing FHTC Laying of Pipe Line & other allied works at SITALKUCHI ZONE III PWSS under JAL JEEVAN MISSION 000098ORD/000505/2022-202 ORD/000505/2022-2023 1233/CD 28/11/2022 1 7.9 AUGMENTATION OF GROUND WATER BASED SITALKUCHI WATER SUPPLY SCHEME ZONE-III TO ACCOMMODATE FHTC IN SITALKUCHI BLOCK (SM/13379) 7.9 7.9
174 Coochbehar Division AUXILIARY TUBEWELL DRILLERS Sinking of 250mm x 200 mm Big dia. Tube well with UPVC Pipes & Strainer at Different Location ofANDARAN FULBARI ZONE I & II PWSS under Cooch Behar Division PHE Dte 000098ORD/000507/2021-202 ORD/000507/2021-2022 1455/CD 10/03/2022 1 10.72 AUGMENTATION OF ANDARAN PHULBARI PIPED WATER SUPPLY SCHEME (SM/10049) 10.72 10.72
175 Coochbehar Division MS SSB CONSTRUCTION CO Execution of different works related to B.ATIABARI P.KHANDA PWSS under JAL JEEVAN MISSION 000098ORD/000507/2023-202 ORD/000507/2023-2024 304/CD 09/02/2024 1 40.32 REJUVENATION OF BARA ATIABARI PRATHAM KHANDA PIPED WATER SUPPLY SCHEME (SM/18299) 40.32 0
176 Coochbehar Division LIMRA SOCIAL WELFARE SOCIETY Wall Painting, Designing, Making & erecting of DB using logo tagline for Cooch Behar districts under Jal Jeevan Mission (JJM) Support Activities Part C 000098ORD/000508/2023-202 ORD/000508/2023-2024 305/CD 09/02/2024 1 18.59 GROUND WATER BASED JORPATKI PIPED WATER SUPPLY SCHEME. (SM/14139) 18.59 0
177 Coochbehar Division AUXILIARY TUBEWELL DRILLERS Sinking of 250mm x 200 mm Big dia. Tube well with UPVC Pipes & Strainer at 3rd Site of DEOCHARAIPWSS under Cooch Behar Division PHE Dte. 000098ORD/000509/2021-202 ORD/000509/2021-2022 1457/CD 10/03/2022 1 4.58 Rejuvenation of DEOCHARAI Water Supply Scheme (SM/10364) 4.58 4.58
178 Coochbehar Division SENGUPTA ENTERPRISE Execution of different works related to LAWCHAPRA PWSS under JAL JEEVAN MISSION PART C 000098ORD/000512/2023-202 ORD/000512/2023-2024 310/CD 09/02/2024 1 20.93 Rejuvenation of LAUCHAPRA Piped Water Supply Scheme (SM/10231) 20.93 0
179 Coochbehar Division MS SSB CONSTRUCTION CO Execution of different works related to BHUTKURA PWSS under JAL JEEVAN MISSION 000098ORD/000513/2022-202 ORD/000513/2022-2023 1631/CD 08/02/2023 2 130.28 BHUTKURA PIPED WATER SUPPLY SCHEME (SM/14730) 130.28 42.75
180 Coochbehar Division MS SSB CONSTRUCTION CO Execution of different works related to BHUTKURA PWSS under JAL JEEVAN MISSION 000098ORD/000514/2023-202 ORD/000514/2023-2024 312/CD 09/02/2024 1 45.85 BHUTKURA PIPED WATER SUPPLY SCHEME (SM/14730) 45.85 0
181 Coochbehar Division UMEX POLYMERS PVT LTD Execution of different works related to INDRA NARAYAN PWSS under JAL JEEVAN MISSION 000098ORD/000515/2022-202 ORD/000515/2022-2023 1602/CD 03/02/2023 1 100 INDRA NARAYAN PWSS (SM/14205) 100 0
182 Coochbehar Division UMEX POLYMERS PVT LTD Execution of different works related to KISMAT MOKARARI PWSS under JAL JEEVAN MISSION 000098ORD/000516/2022-202 ORD/000516/2022-2023 1603/CD 03/02/2023 1 190.11 KISMAT MOKARARI PWSS (SM/14201) 190.11 0
183 Coochbehar Division LIMRA SOCIAL WELFARE SOCIETY Wall Painting, Designing, Making & erecting of DB using logo tagline for Cooch Behar districts under Jal Jeevan Mission (JJM) Support Activities Part D 000098ORD/000517/2023-202 ORD/000517/2023-2024 315/CD 09/02/2024 1 44.17 BHOGRAMGURI & ITS ADJOINING MOUZAS PWSS (SM/18411) 44.17 0
184 Coochbehar Division UMEX POLYMERS PVT LTD Execution of different works related to DAKSHIN KHARIJA GITALDAHA PWSS under JAL JEEVAN MISSION 000098ORD/000518/2022-202 ORD/000518/2022-2023 1605/CD 03/02/2023 1 107 DAKSHIN KHARIJA GITALDAHA PWSS (SM/14204) 107 0
185 Coochbehar Division SUBHAS CHANDRA ROY Execution of different works related to AUG of GURIAHATI PWSS under JAL JEEVAN MISSION 000098ORD/000518/2023-202 ORD/000518/2023-2024 316/CD 09/02/2024 1 27.9 Augmentation of Guriahati Pwss (SM/18297) 27.9 0
186 Coochbehar Division SHRI ANNAPURNA DISTRIBUTORS Execution of different works related to PURBA DHULIA BALDIHATI PWSS under JAL JEEVAN MISSION 000098ORD/000519/2022-202 ORD/000519/2022-2023 1606/CD 03/02/2023 1 14.51 AUGMENTATION FOR PURBBA DHULIA BALDIHATI PIPED WATER SUPPLY SCHEME (SM/11983) 14.51 0
187 Coochbehar Division M/S T R PARIK Execution of different works related to KHAGRABARI Z1 PWSS under JAL JEEVAN MISSION 000098ORD/000521/2022-202 ORD/000521/2022-2023 1608/CD 03/02/2023 1 177.81 AUGMENTATION OF KHAGRABARI PIPED WATER SUPPLY SCHEME. (SM/13403) 177.81 0
188 Coochbehar Division M/S T R PARIK Execution of different works related to PANIGRAM PWSS under JAL JEEVAN MISSION 000098ORD/000522/2022-202 ORD/000522/2022-2023 1609/CD 03/02/2023 1 16.39 PANIGRAM PIPED WATER SUPPLY SCHEME (SM/12271) 16.39 0
189 Coochbehar Division AMBITIOUS ENTERPRISE Execution of different works related to AUG. of KHATTIMARI ZONE-II PWSS under JAL JEEVAN MISSION 000098ORD/000523/2022-202 ORD/000523/2022-2023 1678/CD 13/02/2023 2 75.48 Augmentation of Ground Water Based Khattimari Zone-II PWSS (Dinhata-II) (SM/13153) 75.48 53.6
190 Coochbehar Division M/S KARNATAKA CONSTRUCTION COM Execution of different works related to CHHOTA KESHARI BARI PWSS under JAL JEEVAN MISSION 000098ORD/000524/2022-202 ORD/000524/2022-2023 1679/CD 13/02/2023 1 74.47 CHHOTA KESHARI BARI PIPED WATER SUPPLY SCHEME. (SM/13212) 74.47 0
191 Coochbehar Division GOUTAM KUMAR DAS Providing FHTC Works, Laying of pipe line Constructions of 3rd site Pump House, Boundary Wall at PANISALA W.S.S under Cooch Behar Division P.H.E.Dte. 000098ORD/000528/2021-202 ORD/000528/2021-2022 1628/CD 29/03/2022 1 2.89 Augmentation of Panisala PWSS. (SM/16526) 2.89 0
192 Coochbehar Division Z STAR COMMOTRADE PVT LTD Execution of different works related to SITALKUCHI Z5 PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1214/1-5/NBC-1; Dt.: 01-03-23 000098ORD/000532/2022-202 ORD/000532/2022-2023 1776/CD 02/03/2023 1 92.56 Augmentation of Ground water based Sitalkuchi water supply scheme Zone- V to accommodate FHTC in Sitalkuchi Block (SM/13380) 92.56 0
193 Coochbehar Division BIJOY ROY Providing FHTC Works, Laying of pipe line Constructions of Switch Room, Boundary Wall at SINGIMARI PASCHIMPAR W.S.S under Cooch Behar Division P.H.E.Dte. PART A 000098ORD/000533/2021-202 ORD/000533/2021-2022 1633/CD 29/03/2022 2 40.95 Augmentation of Singimari Bhetaguri piped water supply scheme. (SM/10149) 40.95 27.91
194 Coochbehar Division Z STAR COMMOTRADE PVT LTD Execution of different works related to SITALKUCHI Z4 PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1217/1-5/NBC-1; Dt.: 01-03-23 000098ORD/000534/2022-202 ORD/000534/2022-2023 1779/CD 02/03/2023 1 28.83 AUGMENTATION OF GROUND WATER BASED SITALKUCHI WATER SUPPLY SCHEME ZONE-IV TO ACCOMMODATE FHTC IN SITALKUCHI BLOCK (SM/13684) 28.83 0
195 Coochbehar Division GEETA CONSTRUCTION Execution of different works related to ANANDARAN SINGIMARI PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1239/1-5/NBC-1; Dt.: 02-02-23 000098ORD/000536/2022-202 ORD/000536/2022-2023 1775/CD 02/03/2023 1 347.57 ANANDARAN SINGIMARI PIPED WATER SUPPLY SCHEME. (SM/13147) 347.57 0
196 Coochbehar Division Z STAR COMMOTRADE PVT LTD Execution of different works related to GHOKSADANGA ZONE - I PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1210/1-5/NBC-1; Dt.: 01-03-23 000098ORD/000537/2022-202 ORD/000537/2022-2023 1780/CD 02/03/2023 1 50.16 AUGMENTATION OF GHOKSADANGA PIPED WATER SUPPLY SCHEME (SM/11977) 50.16 0
197 Coochbehar Division M/S MAA MANASA CONSTRUCTION CO Gap filling between pipe line related to Bhogdabri & Rajpur PWSS under JAL JEEVAN MISSION 000098ORD/000539/2023-202 ORD/000539/2023-2024 628/CD 11/03/2024 1 22.63 BHOGDABARI PIPED WATER SUPPLY SCHEME. (SM/13164) 22.63 0
198 Coochbehar Division MS SSB CONSTRUCTION CO Execution of different works related to B.RANGARAS Z1 PWSS under JAL JEEVAN MISSION 000098ORD/000541/2023-202 ORD/000541/2023-2024 629/CD 11/03/2024 1 62.56 BARARANGRAS PIPED WATER SUPPLY SCHEME (SM/14135) 62.56 0
199 Coochbehar Division Z STAR COMMOTRADE PVT LTD Execution of different works related to PUTIABARO MASIA ZII PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1212/1-5/NBC-1; Dt.: 01-03-23 000098ORD/000542/2022-202 ORD/000542/2022-2023 1781/CD 02/03/2023 1 28.43 Augmentation of Ground Water Based Putia Bara Masia Zone-II (Sitalkuchi Block) (SM/13156) 28.43 0
200 Coochbehar Division SHIBA ENTERPRISE Execution of different works related to NAGAR CHANGRA BHANDHA (ZONE-II) PWSS under JAL JEEVAN MISSION 000098ORD/000547/2022-202 ORD/000547/2022-2023 1681/CD 13/02/2023 1 32.45 Augmentation works for providing functional household tap connection within command area of NAGAR CHANGRABANDA Piped Water Supply Scheme (SM/10159) 32.45 0
201 Coochbehar Division MS SSB CONSTRUCTION CO Execution of different works related to GURIAHATI PWSS under JAL JEEVAN MISSION 000098ORD/000548/2023-202 ORD/000548/2023-2024 605/CD 11/03/2024 1 48.9 Augmentation of Guriahati Pwss (SM/18297) 48.9 0
202 Coochbehar Division MS BIDYUT SARKAR Execution of different works related to BAISGURI KHANDA PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1242/1-5/NBC-1; Dt.: 02-03-23 000098ORD/000552/2022-202 ORD/000552/2022-2023 1774/CD 02/03/2023 1 39.28 BAISGURI KHANDA PIPED WATER SUPPLY SCHEME (SM/13284) 39.28 39.28
203 Coochbehar Division MS SSB CONSTRUCTION CO Execution of different works related to DUDHERKUTHI Z1 PWSS under JAL JEEVAN MISSION 000098ORD/000552/2023-202 ORD/000552/2023-2024 656/CD 11/03/2024 1 50.43 DUDDER KUTHI PIPED WATER SUPPLY SCHEME. (SM/18369) 50.43 0
204 Coochbehar Division MAHENDRA CHHETRI Execution of different works related to CHAUDANGA PWSS under JAL JEEVAN MISSION 000098ORD/000553/2022-202 ORD/000553/2022-2023 1610/CD 03/02/2023 2 81.06 CHAUDANGA PIPED WATER SUPPLY SCHEME. (SM/13146) 81.06 81.06
205 Coochbehar Division HIRAK CONSTRUCTION Execution of different works related to KHAGRIBARI PWSS under JAL JEEVAN MISSION 000098ORD/000554/2022-202 ORD/000554/2022-2023 1703/CD 13/02/2023 1 49.25 KHAGRIBARI PIPED WATER SUPPLY SCHEME (SM/13882) 49.25 0
206 Coochbehar Division DAS ENTERPRISE Execution of different works related to DEBOTTAR BAKSHIGANJ PWSS under JAL JEEVAN MISSION 000098ORD/000555/2022-202 ORD/000555/2022-2023 1702/CD 13/02/2023 1 35.11 Ground Water Based Piped Water Supply Scheme DEBOTTAR BAKSHIGANJ (BLOCK-HALDIBARI) (SM/13287) 35.11 35.11
207 Coochbehar Division M/S BADAL CH SAHA Preparation of DPR for Bhoram Piped Water Supply Scheme under Cooch Behar Sadar Sub-Division of Cooch Behar Division, P.H.E. Dte. 000098ORD/000557/2021-202 ORD/000557/2021-2022 1541/CD 17/03/2022 1 6.75 Procurement of service consultants for preparation of DPR of New Piped Water Supply Scheme for uncovered rural area of Jalpaiguri, Alipurduar and Coochbehar District in West Bengal. (SM/11505) 9.45 9.45
208 Coochbehar Division Z STAR COMMOTRADE PVT LTD Execution of different works related to GHOKSADANGA ZONE - II PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1243/1-5/NBC-1; Dt.: 02-03-23 000098ORD/000557/2022-202 ORD/000557/2022-2023 1782/CD 02/03/2023 2 130.06 AUGMENTATION OF GHOKSADANGA PIPED WATER SUPPLY SCHEME (SM/11977) 130.06 0
209 Coochbehar Division PALLAB BHAWAL Providing FHTC 3rd Site Pump House Boundary Wall SSPost with soak pit Sinking 250mm X 200mm Big dia Tubewell & New UPVC/DI/GI Pipe line and other allied works (PART ¿B) at SITAI ZONE ¿ I PWSS under Cooch Behar Division, PHED 000098ORD/000558/2022-202 ORD/000558/2022-2023 1281/CD 02/12/2022 1 0.46 Augmentation of Sitai piped water supply scheme. (SM/10147) 0.46 0
210 Coochbehar Division PALLAB BHAWAL Construction of 450 cum OHR Providing FHTC & New UPVC Pipe line & other allied works (PART ¿A) at SITAI ZONE ¿ I PWSS under Cooch Behar Division, PHED 000098ORD/000559/2022-202 ORD/000559/2022-2023 1282/CD 02/12/2022 3 147.33 Augmentation of Sitai piped water supply scheme. (SM/10147) 147.33 74.32
211 Coochbehar Division ANUGRAH CONSTRUCTION PRIVATE L Execution of different works related to CHANDAN CHOWRA PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1234/1-5/NBC-1; Dt.: 02-03-23 000098ORD/000563/2022-202 ORD/000563/2022-2023 1789/CD 02/03/2023 1 152.73 CHANDAN CHOWRA PIPED WATER SUPPLY SCHEME (SM/14134) 152.73 0
212 Coochbehar Division S.G ENTERPRISE Execution of different works related to CHOTO GAROLJHORA PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1110/1-5/NBC-1; Dt.: 13-02-23 000098ORD/000564/2022-202 ORD/000564/2022-2023 1692/CD 13/02/2023 1 34.08 CHOTO GAROLJHORA PIPED WATER SUPPLY SCHEME. (SM/13211) 34.08 0
213 Coochbehar Division MS SSB CONSTRUCTION CO Execution of different works related to DUAI SUAI PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1342/1-5/NBC-1; Dt.: 24-03-23 000098ORD/000565/2022-202 ORD/000565/2022-2023 1959/CD 24/03/2023 1 76.2 DUAI SUAI PIPED WATER SUPPLY SCHEME. (SM/15911) 76.2 0
214 Coochbehar Division MS SSB CONSTRUCTION CO Execution of different works related to UTTAR PESHTARJHAR PWSS under JAL JEEVAN MISSION SE,NBC-1,PHED A.O. No.: 1108/1-5/NBC-1; Dt.: 13-02-23 000098ORD/000568/2022-202 ORD/000568/2022-2023 1688/CD 13/02/2023 1 29.02 UTTAR PESHTARJHAR PIPED WATER SUPPLY SCHEME. (SM/13462) 29.02 0
215 Coochbehar Division M/S SOBHA & CO. Preparation of DPR for Angarkata Paradubi Piped Water Supply Scheme under Mathabhanga Sub-Division of Cooch Behar Division, P.H.E. Dte. 000098ORD/000571/2021-202 ORD/000571/2021-2022 1387/CD 04/03/2022 1 9.44 Procurement of service consultants for preparation of DPR of New Piped Water Supply Scheme for uncovered rural area of Jalpaiguri, Alipurduar and Coochbehar District in West Bengal. (SM/11505) 9.44 9.44
216 Coochbehar Division PALLAB BHAWAL Execution of different works related to UCHALPUKURI ZONE - II PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1121/1-5/NBC-1; Dt.: 13-02-23 000098ORD/000572/2022-202 ORD/000572/2022-2023 1690/CD 13/02/2023 1 5.42 Augmentation of Ground Water Based UCHALPUKURI ZONE-II Piped Water Supply Scheme to Accommodate FHTC in Mekhliganj Block within Cooch Behar District under Cooch Behar Division, P.H.E. Dte. (SM/13157) 5.42 5.42
217 Coochbehar Division MALAY KR.DEB Execution of different works related to JIRANPUR PART B PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1119/1-5/NBC-1; Dt.: 13-02-23 000098ORD/000576/2022-202 ORD/000576/2022-2023 1856/CD 14/03/2023 1 111.82 AUGMENTATION OF GROUND WATER JIRANPUR ZONE-I (B) ACCOMODATE FHTC IN HALDIBARI BLOCK WITHIN COOCH BEHAR DISTRICT UNDE COOCH BEHAR DIVISION (SM/13149) 111.82 0
218 Coochbehar Division JAL PRAVAHIKA PRIVATE LIMITED Execution of different works related to MAHISHCHARU PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1207/1-5/NBC-1; Dt.: 01-03-23 000098ORD/000580/2022-202 ORD/000580/2022-2023 1770/CD 02/03/2023 1 1.1 MAHISHCHARU PIPED WATER SUPPLY SCHEME. (SM/13207) 1.1 0
219 Coochbehar Division ASHIT KUMAR SINGHA Execution of different works related to ASAKBARI PRATHAM KHANDA PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1241/1-5/NBC-1; Dt.: 02-03-23 000098ORD/000583/2022-202 ORD/000583/2022-2023 1773/CD 02/03/2023 1 0.41 ASAKBARI PRATHAM KHANDA PWSS (SM/14203) 0.41 0
220 Coochbehar Division MESSRS A.B.G CONSTRUCTION Execution of different works related to DANGA PWSS under JAL JEEVAN MISSION SE,NBC-1,PHED A.O. No.: 1339/1-5/NBC-1; Dt.: 24-03-23 000098ORD/000584/2022-202 ORD/000584/2022-2023 1967/CD 24/03/2023 1 29.67 DANGA Piped Water Supply Scheme. (SM/14937) 29.67 0
221 Coochbehar Division SUBHAS CHANDRA ROY Execution of different works related to BARA GOPALPUR PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1109/1-5/NBC-1; Dt.: 13-02-23 000098ORD/000586/2022-202 ORD/000586/2022-2023 1671/CD 13/02/2023 1 3.79 BARA GOPALPUR PIPED WATER SUPPLY SCHEME. (SM/13161) 3.79 3.79
222 Coochbehar Division M/S TORSHA CONSTRUCTION Execution of different works related to NIJTARAF PWSS under JAL JEEVAN MISSION 000098ORD/000587/2022-202 ORD/000587/2022-2023 1677/CD 13/02/2023 2 82.66 NIJTARAF PIPED WATER SUPPLY SCHEME at HALDIBARI. (SM/13120) 82.66 12
223 Coochbehar Division BENGAL YOUTH UN EMPLOYED ENGIN Execution of different works related to SAJHERPAR KHATALBARI PWSS under JAL JEEVAN MISSION 000098ORD/000588/2022-202 ORD/000588/2022-2023 1676/CD 13/02/2023 2 97.83 SAJHERPAR KHATALBARI (SM/13877) 97.83 73.48
224 Coochbehar Division M/S DHAR ENTERPRISE Execution of different works related to BARA PINJARIRJHAR PWSS under JAL JEEVAN MISSION 000098ORD/000590/2022-202 ORD/000590/2022-2023 1674/CD 13/02/2023 1 56.06 BARA PINJARIRJHAR PIPED WATER SUPPLY SCHEME. (SM/13163) 56.06 0
225 Coochbehar Division GOUTAM KUMAR DAS Execution of different works related to DEBGRAM PWSS under JAL JEEVAN MISSION 000098ORD/000591/2022-202 ORD/000591/2022-2023 1673/CD 13/02/2023 1 42.13 DEBGRAM PIPED WATER SUPPLY SCHEME (SM/13880) 42.13 0
226 Coochbehar Division MS SSB CONSTRUCTION CO Execution of different works related to KHARIJA DURGANAGAR DWITIA KHANDA PWSS under JAL JEEVAN MISSION 000098ORD/000592/2022-202 ORD/000592/2022-2023 1672/CD 13/02/2023 1 1.99 KHARIJA DURGANAGAR DWITIYA KHANDA PWSS (SM/14449) 1.99 1.99
227 Coochbehar Division S & P ENTERPRISE Execution of different works related to ABUAR PATHAR PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1335/1-5/NBC-1; Dt.: 24-03-23 000098ORD/000593/2022-202 ORD/000593/2022-2023 1963/CD 24/03/2023 1 152.3 ABUAR PATHAR PWSS (SM/14202) 152.3 0
228 Coochbehar Division DILIP MAHATO Execution of different works related to BAILPARI PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1338/1-5/NBC-1; Dt.: 24-03-23 000098ORD/000594/2022-202 ORD/000594/2022-2023 1964/CD 24/03/2023 1 48.71 BAILPARI PIPED WATER SUPPLY SCHEME. (SM/13463) 48.71 0
229 Coochbehar Division M/S KAMAK ENGINEERS AND CO Execution of different works related to JORPATKI PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1233/1-5/NBC-1; Dt.: 02-03-23 000098ORD/000596/2022-202 ORD/000596/2022-2023 1788/CD 02/03/2023 1 1.2 GROUND WATER BASED JORPATKI PIPED WATER SUPPLY SCHEME. (SM/14139) 1.2 0
230 Coochbehar Division M/S A. B. ENTERPRISE Execution of different works related (within DUD KUTHIDEWANBAS ) to AUG. of DEWANHAT PWSS under JAL JEEVAN MISSION 000098ORD/000596/2023-202 ORD/000596/2023-2024 637/CD 11/03/2024 1 24.96 DUDDER KUTHIDEWANBAS PIPED WATER SUPPLY SCHEME. (SM/18251) 24.96 0
231 Coochbehar Division M/S J C ENTERPRISE Execution of different works related to DINHATA (P) PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1054/1-5/NBC-1; Dt.: 03-02-23 000098ORD/000598/2022-202 ORD/000598/2022-2023 1613/CD 03/02/2023 1 134.18 DINHATA(P) PIPED WATER SUPPLY SCHEME. (SM/13401) 134.18 0
232 Coochbehar Division ASHIM KUMAR CHAKRABORTY Execution of different works related to AMBARI PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1341/1-5/NBC-1; Dt.: 24-03-23 000098ORD/000599/2022-202 ORD/000599/2022-2023 1968/CD 24/03/2023 1 143.85 Augmentation OF AMBARI PIPED WATER SUPPLY SCHEME (SM/16350) 143.85 0
233 Coochbehar Division SUPER -TECH ENGINEERS'CO-OPERA Execution of different works related to GORBHANGA PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1291/1-5/NBC-1; Dt.: 17-03-23 000098ORD/000600/2022-202 ORD/000600/2022-2023 1906/CD 17/03/2023 1 45.19 GORBHANGA PIPED WATER SUPPLY SCHEME. (SM/13210) 45.19 0
234 Coochbehar Division M/S PALIT ENTERPRISE Execution of different works related to KUCHLIBARI Z 1 PWSS under JAL JEEVAN MISSION SE,NBC-1,PHED A.O. No.: 1294/1-5/NBC-1; Dt.: 17-03-23 000098ORD/000605/2022-202 ORD/000605/2022-2023 1901/CD 17/03/2023 1 75.03 Augmentation of Ground Water Based Kuchlibari Zone-I PWSS ((Mekhliganj Block) (SM/13154) 75.03 0
235 Coochbehar Division SASANKA ROY Execution of different works related to HARIBHANGA KHATTIMARI PWSS under JAL JEEVAN MISSION 000098ORD/000607/2022-202 ORD/000607/2022-2023 1612/CD 03/02/2023 1 38.62 HARIBHANGA KHATTIMARI PIPED WATER SUPPLY SCHEME. (SM/13138) 38.62 0
236 Coochbehar Division AASHIRBAD ENTERPRISE Execution of different works related to BHURKUSH PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1295/1-5/NBC-1; Dt.: 17-03-23 000098ORD/000608/2022-202 ORD/000608/2022-2023 1899/CD 17/03/2023 1 12.08 AUGMENTATION OF GROUND WATER BASED BHURKUSH PWSS TAFANGANJ-I BLOCK WITHIN COOCH BEHAR DISTRICT UNDER COOCH BEHAR DIVISION, P.H.E. DTE. (SM/13859) 12.08 0
237 Coochbehar Division DEBNATH BROTHERS Execution of IEC activities related to judicious & safe use of drinking water, water conservation, water quality issues under JAL JEEVAN MISSION support activities at Cooch Behar District (Part-A) 000098ORD/000608/2023-202 ORD/000608/2023-2024 934/CD 04/09/2023 1 1,507.78 Detailed Project Report onTraining/Capacity Building Activities for various stakeholders under Jal Jeevan Mission (JJM) Support Activities. (SM/07379) 1,507.78 0
238 Coochbehar Division MATRI ENTERPRISEES Execution of different works related to CHIKLIGURI PWSS under JAL JEEVAN MISSION 000098ORD/000611/2022-202 ORD/000611/2022-2023 1817/CD 06/03/2023 1 38.11 AUGMENTATION OF GROUND WATER BASED CHIKLIGURI PIPED WATER SUPPLY SCHEME TUFANGANJ - I BLOCK WITHIN COOCH BEHAR DISTRICT UNDER COOCH BEHAR DIVISION, P.H.E. Dte. (SM/14935) 38.11 0
239 Coochbehar Division SAIMONS CO- OPARATIVE LAB CONT Execution of different works related to TATERKUTHI PWSS under JAL JEEVAN MISSION SE,NBC-1,PHED A.O. No.: 1292/1-5/NBC-1; Dt.: 17-03-23 000098ORD/000613/2022-202 ORD/000613/2022-2023 1908/CD 17/03/2023 1 20.4 TATERKUTHI PIPED WATER SUPPLY SCHEME. (SM/13158) 20.4 0
240 Coochbehar Division SENGUPTA ENTERPRISE Uploading charges of (https://ejalshakti.gov.in/imisreports/IMISReportLogin.aspx) related to FHTC under Jal Jeevan Mission in presence of JJM Login authority under Cooch Behar Division, PHE Dte. (CHANDAN CHOWRA) (Part-A) 000098ORD/000616/2023-202 ORD/000616/2023-2024 674/CD 11/03/2024 1 0.97 CHANDAN CHOWRA PIPED WATER SUPPLY SCHEME (SM/14134) 0.97 0
241 Coochbehar Division SENGUPTA ENTERPRISE Uploading charges of (https://ejalshakti.gov.in/imisreports/IMISReportLogin.aspx) related to FHTC under Jal Jeevan Mission in presence of JJM Login authority under Cooch Behar Division, PHE Dte.(CHANDAN CHOWRA) (Part-B) 000098ORD/000617/2023-202 ORD/000617/2023-2024 675/CD 11/03/2024 1 0.97 CHANDAN CHOWRA PIPED WATER SUPPLY SCHEME (SM/14134) 0.97 0
242 Coochbehar Division SENGUPTA ENTERPRISE Uploading charges of (https://ejalshakti.gov.in/imisreports/IMISReportLogin.aspx) related to FHTC under Jal Jeevan Mission in presence of JJM Login authority under Cooch Behar Division, PHE Dte.(CHANDAN CHOWRA) (Part-C) 000098ORD/000618/2023-202 ORD/000618/2023-2024 676/CD 11/03/2024 1 0.97 CHANDAN CHOWRA PIPED WATER SUPPLY SCHEME (SM/14134) 0.97 0
243 Coochbehar Division ASHIM KUMAR CHAKRABORTY Execution of different works related to AUG. SIKARPUR PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1287/1-5/NBC-1; Dt.: 17-03-23 000098ORD/000619/2022-202 ORD/000619/2022-2023 1905/CD 17/03/2023 1 3.71 Augmentation of Ground water based Shikarpur PWSS to accommodate FHTC in Tufanganj-I Block (SM/13381) 3.71 0
244 Coochbehar Division AMBITIOUS ENTERPRISE Execution of different works related to BRAHMOTTAR CHATRA PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1286/1-5/NBC-1; Dt.: 17-03-23 000098ORD/000620/2022-202 ORD/000620/2022-2023 1904/CD 17/03/2023 1 42.27 BRAHMOTTAR CHATRA PIPED WATER SUPPLY SCHEME. (SM/15912) 42.27 0
245 Coochbehar Division UNIBRO INFRASERV PRIVATE LIMIT Execution of different works related to JNANDAS PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1126/1-5/NBC-1; Dt.: 13-02-23 000098ORD/000626/2022-202 ORD/000626/2022-2023 1885/CD 14/03/2023 1 158.61 JNANDAS & ITS ADJOINING MOUZAS PWSS (SM/14446) 158.61 0
246 Coochbehar Division MS BIDYUT SARKAR Execution of different works related to GHUGHUMARI ZONE-I PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1289/1-5/NBC-1; Dt.: 17-03-23 000098ORD/000632/2022-202 ORD/000632/2022-2023 1903/CD 17/03/2023 1 8.42 Augmentation of GHUGHUMARI Piped Water Supply Scheme (SM/16531) 8.42 0
247 Coochbehar Division SHREE RANI SATI ENTERPRISE Execution of different works related to AUG. of Bherbheri PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1365/1-5/NBC-1; Dt.: 28-03-23 000098ORD/000634/2022-202 ORD/000634/2022-2023 1995/CD 28/03/2023 1 152.52 AUGMENTATION OF GROUND WATER BASED BHERBHERI PWSS MATHABHANGA - II BLOCK WITHIN COOCHBEHAR DISTRICT (SM/16140) 152.52 0
248 Coochbehar Division SHREE RANI SATI ENTERPRISE Execution of different works related to Aug. of MUKUL DANGA PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1377/1-5/NBC-1; Dt.: 28-03-23 000098ORD/000655/2022-202 ORD/000655/2022-2023 1999/CD 28/03/2023 3 122.1 AUGMENTATION OF GROUND WATER BASED MUKUL DANGA PWSS MATHABHANGA - II BLOCK WITHIN COOCHBEHAR DISTRICT UNDER COOCHBEHAR DIVISION, PHE DTE (SM/16473) 122.1 23.15
249 Coochbehar Division UTPAL CHAKRABORTY Execution of different works related to AUG. of NAJIRAN DEUTIKATA PWSS under JAL JEEVAN MISSION 000098ORD/000656/2022-202 ORD/000656/2022-2023 1996/CD 28/03/2023 1 25.71 AUGMENTATION OF GROUND WATER BASED NAJIRAN DEUTIKATA PWSS TAFANGANJ-II BLOCK WITHIN COOCH BEHAR DISTRICT UNDER COOCH BEHAR DIVISION, P.H.E. DTE. (SM/15981) 25.71 0
250 Coochbehar Division SHREE RANI SATI ENTERPRISE Execution of different works related to PHULBARI PART-A PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1366/1-5/NBC-1; Dt.: 28-03-23 000098ORD/000657/2022-202 ORD/000657/2022-2023 1988/CD 28/03/2023 1 50 AUGMENTATION OF GROUND WATER BASED PHULBARI PART A PWSS (SM/16518) 50 0
251 Coochbehar Division GOUTAM KUMAR DAS Execution of different works related to Aug. of DHALDIBARI PWSS under JAL SE,NBC-1,PHED A.O. No.: 1121/1-5/NBC-1; Dt.: 13-02-23 000098ORD/000675/2022-202 ORD/000675/2022-2023 1992/CD 28/03/2023 1 48.41 AUGMENTATION OF GROUND WATER BASED DHALDIBARI PIPED WATER SUPPLY SCHEME OF TUFANGANJ - II BLOCK WITHIN COOCHBEHAR DISTRICT (SM/16165) 48.41 0
252 Coochbehar Division M/S. NITYAGOPAL BANIK Execution of different works related to AUG of NAJIRGANJ PWSS under JAL JEEVAN MISSION.SE,NBC-1,PHED A.O. No.: 1375/1-5/NBC-1; Dt.: 28-02-23 000098ORD/000695/2022-202 ORD/000695/2022-2023 2002/CD 29/03/2023 1 78.99 AUGMENTATION OF GROUND WATER BASED NAJIRGANJ PWSS DINHATA-II BLOCK WITHIN COOCH BEHAR DISTRICT UNDER COOCH BEHAR DIVISION, P.H.E. DTE. (SM/16150) 78.99 0
253 Coochbehar Division PARAUDDIN MIAH Extension Work order for Hiring of Diesel Vehicle of Bolero Maxi cab for the Office use of Assistant Engineer, Cooch Behar Sadar Sub-Division, PHE Dte. for 6 Months (February 2023 to July 2023) 000098ORD/000737/2022-202 ORD/000737/2022-2023 1575/CD 31/01/2023 1 0.7 AUGMENTATION OF CHANDAMARI PIPED WATER SUPPLY SCHEME (SM/09302) 0.7 0
254 Coochbehar Division PARITOSH PANDIT Execution of different works related to UTTAR FULKADABRI PWSS under JAL JEEVAN MISSION 000098ORD/000772/2022-202 ORD/000772/2022-2023 1659/CD 10/02/2023 1 11.95 Rejuvenation of UTTAR FULKARDABRI Water Supply Scheme (SM/10708) 11.95 0
255 Coochbehar Division GOUTAM KUMAR DAS Execution of different works related to SITALKUCHI Z2 PWSS under JAL JEEVAN MISSION 000098ORD/000779/2022-202 ORD/000779/2022-2023 1695/CD 13/02/2023 1 6.69 Augmentation of Ground Water Based Sitalkuchi Water Supply Scheme Zone-II to Accommodate FHTC in Sitalkuchi Block. (SM/13289) 6.69 6.69
256 Coochbehar Division MS DD ENTERPRISE Sinking of Big Dia Tubewell works related to ATPUKURI PWSS under JAL JEEVAN MISSION 000098ORD/000784/2022-202 ORD/000784/2022-2023 1860/CD 14/03/2023 1 48.36 Atpukhari Piped Water Supply Scheme. (SM/14250) 48.36 0
257 Coochbehar Division BIJOY ROY Execution of different works related to BOXIRHAT PWSS under JAL JEEVAN MISSION 000098ORD/000792/2022-202 ORD/000792/2022-2023 1868/CD 14/03/2023 1 15 AUGMENTATION OF BAKSIRHAT PIPED WATER SUPPLY SCHEME (SM/10050) 15 15
258 Coochbehar Division PARITOSH KR.CHOUDHARY Execution of different works related to BANESWAR Z1 PWSS under JAL JEEVAN MISSION 000098ORD/000793/2022-202 ORD/000793/2022-2023 1869/CD 14/03/2023 1 11.47 AUGMENTATION OF BANESWAR PIPED WATER SUPPLY SCHEME (SM/10152) 11.47 0
259 Coochbehar Division UDAY CHAKI Execution of different works related to DAKSHIN BAJHEJAMA PWSS under JAL JEEVAN MISSION 000098ORD/000799/2022-202 ORD/000799/2022-2023 1872/CD 14/03/2023 1 1.17 Augmentation of Dakshin Bajejama Water Supply Scheme. (SM/09807) 1.17 1.17
260 Coochbehar Division GOUTAM KUMAR DAS Execution of different works related to Aug. of MANTANI PWSS under JAL JEEVAN MISSION 000098ORD/000814/2022-202 ORD/000814/2022-2023 1993 28/03/2023 1 0.29 AUGMENTATION OF GROUND WATER BASED MANTANI PWSS TUFANGANJ - IIBLOCK WITHIN COOCHBEHAR DISTRICT UNDER COOCHBEHAR DIVISION, PHE DTE (SM/16517) 0.29 0
261 Coochbehar Division SWAPAN KR.SARKAR Training for improvement of Skillness of Pump Operator & Valve Operator of different PWSS of Cooch Behar-I Block held at Dhaluabari under Cooch Behar Division, PHED. 000098ORD/000834/2022-202 ORD/000834/2022-2023 1617/CD/A 03/02/2023 1 0.4 AUGMENTATION OF KHAGRABARI PIPED WATER SUPPLY SCHEME. (SM/13403) 0.4 0
262 Coochbehar Division SWAPAN KR.SARKAR Training for improvement of Skillness of Pump Operator & Valve Operator of different PWSS of Cooch Behar-II Block held at khagrabari under Cooch Behar Division, PHED. 000098ORD/000835/2022-202 ORD/000835/2022-2023 1617/CD/B 03/02/2023 1 0.4 AUGMENTATION OF KHAGRABARI PIPED WATER SUPPLY SCHEME. (SM/13403) 0.4 0
263 Coochbehar Division DEBNATH BROTHERS Providing necessary logistic Support and all other necessary arrangements required for 1-day regional level workshop at Coochbehar in Connection with implementation of JJM in WB (Part-B) 000098ORD/000880/2022-202 ORD/000880/2022-2023 688/CD 23/08/2022 1 18.15 Detailed Project Report onTraining/Capacity Building Activities for various stakeholders under Jal Jeevan Mission (JJM) Support Activities. (SM/07379) 18.15 0
264 Coochbehar Division DEBNATH BROTHERS Providing necessary logistic Support and all other necessary arrangements required for 1-day regional level workshop at Coochbehar in Connection with implementation of JJM in WB (Part-C) 000098ORD/000881/2022-202 ORD/000881/2022-2023 689/CD 23/08/2022 1 21.78 Detailed Project Report onTraining/Capacity Building Activities for various stakeholders under Jal Jeevan Mission (JJM) Support Activities. (SM/07379) 21.78 0
265 Coochbehar Division DEBNATH BROTHERS Providing necessary logistic Support and all other necessary arrangements required for 1 day regional level workshop at Coochbehar in Connection with implementation of JJM in WB ( Part-A) 000098ORD/000883/2022-202 ORD/000883/2022-2023 687/CD 23/08/2022 1 20.9 Detailed Project Report onTraining/Capacity Building Activities for various stakeholders under Jal Jeevan Mission (JJM) Support Activities. (SM/07379) 20.9 0
Total 294 13,433.72 # 13,436.42 2,062.19