F4- Undisbursed Fund

Rs. in Lakh
SL No Division Agency Work Name Unique Order No System Order No Order Memo No Order Date No of Bills Bill Amount Scheme Requisition Amount Allotment Amount
156 174 6,819 # 6,821.7 6,798.96
1 Coochbehar Division DISTRICT HEALTH & FAMILY WELFA FTK SA,MPLE TEST ASHA 000098 6171 6190 05/04/2021 6 373.51 Drinking water sample collection & testing through Field Test Kits (FTKs) & uploading charges for the same related to Water Quality Monitoring & Surveillance Programme Under Jal Jeevan Mission (SM/13132) 373.51 373.51
2 Coochbehar Division UNIBRO INFRASERV PRIVATE LIMIT Execution of different works related to HEMKUMARI ZONE 2 PWSS under JAL JEEVAN MISSION SE,NBC-1,PHED A.O. No.: 31/1-5/NBC-1; Dt.: 13-04-23 000098ORD/000002/2023-202 ORD/000002/2023-2024 51/CD 17/04/2023 1 99.74 AUGMENTATION OF GROUND WATER BASE HEMKUMARI ZONE-II ACCOMODATE FHTC IN HALDIBARI BLOCK WITHIN COOCH BEHAR DISTRICT UNDE COOCH BEHAR DIVISION . (SM/13148) 99.74 99.74
3 Coochbehar Division ABHIJIT KUMAR DAS Execution of different works related to AUG of TANAPAKHA PWSS under JAL JEEVAN MISSION. SE,NBC-1,PHED A.O. No.: 44/1-5/NBC-1; Dt.: 17-04-23 000098ORD/000007/2023-202 ORD/000007/2023-2024 45/CD 17/04/2023 1 49.36 Tanapakha Piped Water Supply Scheme (SM/16152) 49.36 49.36
4 Coochbehar Division SHIBA ENTERPRISE Construction of pump house, Boundary wall at Head work site and laying of Pipe line and other allied works at inconnection with augmentation of NAGAR CHANGRABANDHA (Zone-II) PWSS under Cooch Behar Division, PHED. (Part-B) 000098ORD/000009/2022-202 ORD/000009/2022-2023 25/CD 07/04/2022 1 3.93 Augmentation works for providing functional household tap connection within command area of NAGAR CHANGRABANDA Piped Water Supply Scheme (SM/10159) 3.93 3.93
5 Coochbehar Division ABHIJIT KUMAR DAS Providing FHTC, Repairing of Pump house, boundary wall and laying new Pipe line and other allied works at inconnection with augmentation of NIJTARAF PWSS under Cooch Behar Division, PHED.(Part-C) 000098ORD/000011/2022-202 ORD/000011/2022-2023 27/CD 07/04/2022 1 27 Augmentation of NIJTARAF Piped water supply schemes (SM/10163) 27 27
6 Coochbehar Division NO 1 GURIAHATI CO OP LABOUR CO Providing FHTC & Laying P/Line at PAKHIHAGA PWSS under Cooch Behar Division, PHED 000098ORD/000020/2022-202 ORD/000020/2022-2023 36/CD 07/04/2022 1 2.89 Retrofitting works for providing functional household tap connection(FHTC) eithin the cpmmand area of Pakhihaga Water Supply Scheme (SM/08150) 2.89 2.89
7 Coochbehar Division DAS TRADING CO Providing FHTC Construction of B/Wall & New Laying of Pipe Line and other allied works at AUG. PAYAMARI PWSS under Cooch Behar Division, PHED PART - A 000098ORD/000037/2022-202 ORD/000037/2022-2023 95/CD 18/04/2022 1 1.83 Rejuvenation of Payamari Water Supply Scheme (SM/09824) 1.83 1.83
8 Coochbehar Division ASHIM KUMAR CHAKRABORTY Execution of different works related to BARAIBARI PWSS under JAL JEEVAN MISSION 000098ORD/000041/2023-202 ORD/000041/2023-2024 436/CD 31/05/2023 1 163.75 AUGMENTATION OF GROUND WATER BASED BARAIBARI PWSS COOCH BEHAR-II BLOCK WITHIN COOCH BEHAR DISTRICT UNDER COOCH BEHAR DIVISION, P.H.E. DTE. (SM/13860) 163.75 163.75
9 Coochbehar Division SUSHANTA SAHA Pipe Line in the Command area incl. Providing House connection at CHARALJANI PWSS under Cooch Behar Division. PHE Dte. PART - B 000098ORD/000060/2021-202 ORD/000060/2021-2022 264/CD 06/08/2021 1 19.16 AUGMENTATION OF GROUND WATER BASED CHARALJANI Piped Water Supply Scheme TUFANGANJ - I BLOCK WITHIN COOCH BEHAR DISTRICT UNDER COOCH BEHAR DIVISION, P.H.E. Dte. (SM/14904) 19.16 0
10 Coochbehar Division LONGLAST PIPES (INDIA) PVT. LT Sinking of 250mm x 200 mm Big dia. Tube well with UPVC Pipes & Strainer at 3rd Site of BARO DHAPERCHATRA PWSS under Cooch Behar Division PHE Dte. 000098ORD/000064/2022-202 ORD/000064/2022-2023 261/CD 24/05/2022 1 12 Augmentation works for Providing Functional House Hold Tap Connection (FJTC) within command area of Baro Dhaperchatra Piped water supply Scheme. (SM/10158) 12 12
11 Coochbehar Division M/S NARAYAN KUMAR GHOSH Execution of different works related to A. NIZTARAF PWSS under JAL JEEVAN MISSION 000098ORD/000067/2023-202 ORD/000067/2023-2024 404/CD 23/05/2023 1 10.6 NIJTARAF PIPED WATER SUPPLY SCHEME at HALDIBARI. (SM/13120) 10.6 10.6
12 Coochbehar Division UDAY CHAKI Execution of different works related to HEMKUMARI Z1 PWSS under JAL JEEVAN MISSION 000098ORD/000074/2023-202 ORD/000074/2023-2024 411/CD 23/05/2023 1 9.05 AUGMENTATION OF GROUND WATER HEMKUMARI ZONE-I ACCOMODATE FHTC IN HALDIBARI BLOCK WITHIN COOCH BEHAR DISTRICT UNDE COOCH BEHAR DIVISION (SM/18122) 9.05 9.05
13 Coochbehar Division GOUTAM KUMAR DAS Execution of different works related to CHHAT RAMPUR PWSS under JAL JEEVAN MISSION 000098ORD/000084/2023-202 ORD/000084/2023-2024 619/CD 12/07/2023 1 62.92 AUGMENTATION OF GROUND WATER BASED CHHAT RAMPUR PWSS TUFANGANJ I BLOCK WITHIN COOCHBEHAR DISTRICT UNDER COOCHBEHAR DIVISION , PHE DTE (SM/16520) 62.92 62.92
14 Coochbehar Division M/S JAYANTA KUMAR GOPE Execution of different works related to KHATERBARTI PWSS under JAL JEEVAN MISSION 000098ORD/000086/2023-202 ORD/000086/2023-2024 621/CD 12/07/2023 1 53.29 GROUND WATER BASED KHATERBARI PIPED WATER SUPPLY SCHEME (SM/18135) 53.29 53.29
15 Coochbehar Division BIJOY ROY Execution of different works related to NENDAPAR PWSS under JAL JEEVAN MISSION 000098ORD/000092/2023-202 ORD/000092/2023-2024 627/CD 12/07/2023 1 40.07 NENDARPAR PWSS (SM/18137) 40.07 40.07
16 Coochbehar Division JAL PRAVAHIKA PRIVATE LIMITED Execution of different works related to NAKARANJAN PWSS under JAL JEEVAN MISSION 000098ORD/000097/2023-202 ORD/000097/2023-2024 632/CD 12/07/2023 1 92.03 NAKARJAN AND ITS ADJOINING MOUZAS PWSS (SM/18239) 92.03 92.03
17 Coochbehar Division GHOSH AND SAHA CONSTRUCTION Execution of different works related to AUG. of JAIGIR CHILAKHANA PWSS under JAL JEEVAN MISSION 000098ORD/000104/2023-202 ORD/000104/2023-2024 718/CD 25/07/2023 1 1.17 JAIGIR CHILAKHANA Piped Water Supply Scheme (SM/16155) 1.17 1.17
18 Coochbehar Division GHOSH AND SAHA CONSTRUCTION Execution of different works related to PATCHHARA ZONE 1 PWSS under JAL JEEVAN MISSION 000098ORD/000107/2023-202 ORD/000107/2023-2024 660/CD 14/07/2023 1 15.55 PATCHHARA PWSS (SM/18368) 15.55 15.55
19 Coochbehar Division SHRI ANNAPURNA DISTRIBUTORS Execution of different works related to AUG. of NAKKATIGACHHI PWSS under JAL JEEVAN MISSION 000098ORD/000112/2023-202 ORD/000112/2023-2024 665/CD 14/07/2023 1 54.11 AUGMENTATION OF GROUND WATER BASED NAKKATIGACHHI PIPED WATER SUPPLY SCHEME TUFANGANJ - I BLOCK WITHIN COOCHBEHAR DISTRICT UNDER COOCH BEHAR DIVISION, P.H.E. Dte. (SM/16151) 54.11 54.11
20 Coochbehar Division SUMI ENTERPRISE Execution of different works related to AUG. of CHAKCHAKA ZONE-I PWSS under JAL JEEVAN MISSION 000098ORD/000113/2023-202 ORD/000113/2023-2024 666/CD 14/07/2023 1 139.15 AUGUMENTATION OF GROUND WATER BASED CHAKCHAKA ZONE I PWSS COOCHBEHAR II BLOCK WITHIN COOCHBEHAR DISTRICT UNDER COOCHBEHAR DIVISION , PHE DTE (SM/15934) 139.15 139.15
21 Coochbehar Division MS SSB CONSTRUCTION CO Execution of different works related to DUDHERKUTHI PWSS under JAL JEEVAN MISSION 000098ORD/000114/2023-202 ORD/000114/2023-2024 667/CD 14/07/2023 1 115.95 DUDDER KUTHI PIPED WATER SUPPLY SCHEME. (SM/18369) 115.95 115.95
22 Coochbehar Division BHARATI CHEMICAL AND SCIENTIFI Supply of different type of Chemicals for all Water Testing Laboratories under Cooch Behar Division, PHE Dte. 000098ORD/000138/2022-202 ORD/000138/2022-2023 524/CD 14/07/2022 1 2.4 Requirement of Chemical, Glassware and Instrument of Cooch Behar District Laboratory for NABL Accreditation under Cooch Behar Division P.H.E Dte. (SM/08722) 2.4 2.4
23 Coochbehar Division HARIDAS GHOSH Execution of different works related to FALIMARI (ZONE-I) PWSS under JAL JEEVAN MISSION 000098ORD/000138/2023-202 ORD/000138/2023-2024 807/CD 08/08/2023 1 72.29 FALIMARI PIPED WATER SUPPLY SCHEME (SM/18616) 72.29 72.29
24 Coochbehar Division BRAJA GOPAL SAHA Execution of different works related to BARA MADHUSUDAN PWSS under JAL JEEVAN MISSION 000098ORD/000140/2023-202 ORD/000140/2023-2024 806/CD 08/08/2023 1 5.3 BARA MADHUSUDAN PWSS (SM/16524) 5.3 5.3
25 Coochbehar Division PARTHA DAS Execution of different works related to SARHATI PWSS under JAL JEEVAN MISSION 000098ORD/000141/2023-202 ORD/000141/2023-2024 809/CD 08/08/2023 1 102.54 GROUND WATER BASED SARAHATI PIPED WATER SUPPLY SCHEME. (SM/13390) 102.54 102.54
26 Coochbehar Division DAKSHIN RANGALIBAZNA WELFARE A Engagement of Block Level Community Mobilizer through Implementation Support Organization (ISAs) for Coochbehar districts under Jal Jeevan Mission (JJM) Support Activities 000098ORD/000142/2023-202 ORD/000142/2023-2024 810/CD 08/08/2023 1 30.62 Engagement of balance block Community Mobilizer (36 Nos.) through Implementation Support Agency (ISA) for Cooch Behar District. (SM/18163) 30.62 30.62
27 Coochbehar Division S & P ENTERPRISE Execution of different works related to GARBHADANGA PWSS under JAL JEEVAN MISSION 000098ORD/000144/2023-202 ORD/000144/2023-2024 862/CD 22/08/2023 1 90.99 Garbhadanga Piped Water Supply Scheme. (SM/18749) 90.99 90.99
28 Coochbehar Division M/S NARAYAN KR. GHOSH Providing FHTC and Laying of Pipe line of SHIKARPUR ZONE ? II PWSS under JAL JEEVAN MISSION (PART ?D) 000098ORD/000156/2023-202 ORD/000156/2023-2024 865/CD 22/08/2023 1 73.05 AUGMENTATION OF SIKARPUR PIPED WATER SUPPLY SCHEME (SM/18757) 73.05 73.05
29 Coochbehar Division ASOK KUMAR DHAR Execution of different works related to DAKSHIN BAJEJAMA KHASBAS PWSS under JAL JEEVAN MISSION 000098ORD/000160/2023-202 ORD/000160/2023-2024 889/CD 25/08/2023 1 32.99 DAKSHIN BAJEJAMA KHASBAS PIPED WATER SUPPLY SCHEME. (SM/13118) 32.99 32.99
30 Coochbehar Division RADIANT Preparation of DPR for Augmentation of KUCHLIBARI (Zone-II) Piped Water Supply Scheme under MATHABHANGA Sub-Division of Cooch Behar Division,P.H.E.Dte. 000098ORD/000164/2022-202 ORD/000164/2022-2023 623/CD 16/08/2022 1 3.08 AUGMENTATION OF GROUND WATER BASED KUCHLIBARI ZONE-II PWSS (SM/13225) 3.08 3.08
31 Coochbehar Division CHAKRABORTY ENTERPRISE Execution of different works related to GURIAHATI PWSS under JAL JEEVAN MISSION 000098ORD/000168/2023-202 ORD/000168/2023-2024 945/CD 04/09/2023 1 29.97 AUGMENTATION OF GURIAHATI PIPED WATER SUPPLY SCHEME (SM/09298) 29.97 29.97
32 Coochbehar Division RADIANT Preparation of DPR for Augmentation of HEMKUMARI (Zone-II) Piped Water Supply Scheme under MATHABHANGA Sub-Division of Cooch Behar Division,P.H.E.Dte. 000098ORD/000169/2022-202 ORD/000169/2022-2023 628/CD 16/08/2022 1 3.02 AUGMENTATION OF GROUND WATER BASE HEMKUMARI ZONE-II ACCOMODATE FHTC IN HALDIBARI BLOCK WITHIN COOCH BEHAR DISTRICT UNDE COOCH BEHAR DIVISION . (SM/13148) 3.02 3.02
33 Coochbehar Division TAPAN CHANDA Providing FHTC Construction of 450 cum OHR and Laying of Pipe line Construction of Pump House & B/Wall Sinking of Tubewell at 3rd Site of RAMPUR ZONE ¿ I I PWSS under JAL JEEVAN MISSION (PART ¿A) 000098ORD/000178/2022-202 ORD/000178/2022-2023 650/CD 22/08/2022 2 60.06 Augmentation of RAMPUR Piped Water Supply Scheme (SM/11272) 60.06 60.06
34 Coochbehar Division NO 1 GURIAHATI CO OP LABOUR CO Providing FHTC and Laying of pipe line, Const. Of Pump house , B/Wall at 3rd T/W site and other allied work of PAKHIHAGA PWSS under JAL JEEVAN MISSION (PART ¿A) 000098ORD/000184/2022-202 ORD/000184/2022-2023 658/CD 23/08/2022 2 34.62 Pakhihaga Piped Water Supply Scheme (SM/05058) 34.62 34.62
35 Coochbehar Division DAS ENTERPRISE Providing FHTC & laying of Pipe line and other allied works at Madhya Hudumdanga PWSS under JAL JEEVAN MISSION 000098ORD/000196/2022-202 ORD/000196/2022-2023 666/CD 23/08/2022 1 7.18 Augmentation works for providing Functional House hold Tap Connection Within the Command Area of MADHYA HUDUMDANGA Piped Water Supply Scheme (SM/10141) 7.18 7.18
36 Coochbehar Division SHREE RANI SATI ENTERPRISE Providing FHTC & Construction of pump house, Boundary wall (2nd t/w site) and laying of Pipe line other allied works at DUMNIGURI PWSS under JAL JEEVAN MISSION. (Part-C) 000098ORD/000201/2022-202 ORD/000201/2022-2023 676/CD 23/08/2022 1 15.35 Augmentation of Dumniguru Piped Water Supply Scheme. (SM/10008) 15.35 15.35
37 Coochbehar Division RED STAR UNEMPLOYED CO -OPARAT Providing FHTC Laying Of Pipe Line And Construction Of Boundary Wall And Pump House at 3rd Site of NAGARERBARI (ZONE-II) PWSS under JAL JEEVAN MISSION 000098ORD/000204/2022-202 ORD/000204/2022-2023 679/CD 23/08/2022 1 36.99 Rejuvenation of NAGARERBARI Piped Water Supply Scheme (SM/10219) 36.99 36.99
38 Coochbehar Division M/S PRADIP KUMAR PAL Providing FHTC Construction of 250 cum OHR Construction of Pump House & Sinking of Tubewell at JHAUKUTHI PWSS under JAL JEEVAN MISSION (PART ¿A) 000098ORD/000221/2022-202 ORD/000221/2022-2023 710/CD 27/08/2022 1 34.13 Augmentation of JHAUKUTHI Piped Water Supply Scheme (SM/10220) 34.13 34.13
39 Coochbehar Division NABIN DEBNATH Execution of different works related to BHALKA PWSS under JAL JEEVAN MISSION 000098ORD/000223/2023-202 ORD/000223/2023-2024 397/CD. 23/05/2023 1 28.63 BHALKA PIPED WATER SUPPLY SCHEME (SM/15237) 28.63 28.63
40 Coochbehar Division BIJOY ROY Providing FHTC and Laying of Pipe line & other allied works related to AUG. of KHAGRABARI PWSS under JAL JEEVAN MISSION 000098ORD/000229/2022-202 ORD/000229/2022-2023 715/CD 27/08/2022 1 3.58 AUGMENTATION OF KHAGRABARI PIPED WATER SUPPLY SCHEME. (SM/13403) 3.58 0
41 Coochbehar Division KHOKAN DAS Providing FHTC & other allied works at JHAUKUTHI PWSS under JAL JEEVAN MISSION 000098ORD/000235/2022-202 ORD/000235/2022-2023 719/CD 27/08/2022 1 3.68 Augmentation of JHAUKUTHI Piped Water Supply Scheme (SM/10220) 3.68 3.68
42 Coochbehar Division CHAKRABORTY ENTERPRISE. Providing FHTC & Addl. laying of Pipe line and other allied works at DHALUABARI PWSS under JAL JEEVAN MISSION. 000098ORD/000236/2022-202 ORD/000236/2022-2023 722/CD 27/08/2022 1 5.2 Augmentation of dhaluabari water supply scheme (SM/09822) 5.2 5.2
43 Coochbehar Division MS BIDYUT SARKAR Providing FHTC & Construction of Pump house at HW site & 2nd Site GOSANIMARI ZONE ¿ I PWSS under JAL JEEVAN MISSION 000098ORD/000240/2022-202 ORD/000240/2022-2023 726/CD 27/08/2022 1 3.77 Augmentation of Gosanimari piped water supply scheme. (SM/10150) 3.77 3.77
44 Coochbehar Division MATARA CONSTRUCTION CO. Providing FHTC 3rd Site Pump House Boundary Wall SSPost with soakpit Sinking 250mm X 200mm Big dia Tubewell & New UPVC Pipe line and other allied works (PART ¿A) at RASHIKBILL ZONE ¿ I PWSS under Cooch Behar Division, PHED 000098ORD/000241/2021-202 ORD/000241/2021-2022 890/CD 24/12/2021 1 2.64 Augmentation of Rasikbil piped water supply scheme. (SM/09300) 2.64 2.64
45 Coochbehar Division SWAPAN KR.SARKAR Providing FHTC & Repairing of OHR B/Wall suplly Stairecase constn of Addl. Phouse at Dhaluabari PWSS under JAL JEEVAN MISSION 000098ORD/000241/2022-202 ORD/000241/2022-2023 727/CD 27/08/2022 1 20.57 Augmentation of dhaluabari water supply scheme (SM/09822) 20.57 20.57
46 Coochbehar Division KRISHNA GOPAL BASK Name of Work: Execution of different works related to BOXIRHAT PWSS under JAL JEEVAN MISSION PART O 000098ORD/000262/2023-202 ORD/000262/2023-2024 1028/CD 22/09/2023 1 25.97 AUGMENTATION OF BAKSIRHAT PIPED WATER SUPPLY SCHEME (SM/10050) 25.97 25.97
47 Coochbehar Division UTTAM SAHA Name of Work: Execution of different works related to CHHAT RAMPUR PWSS under JAL JEEVAN MISSION PART A 000098ORD/000268/2023-202 ORD/000268/2023-2024 1034/cd 22/09/2023 1 7.03 Augmentation of CHAT RAMPUR DWITIYA KHANDA Piped Water Supply Scheme (SM/10161) 7.03 7.03
48 Coochbehar Division S & P ENTERPRISE Construction of 150 cum OHR Providing FHTC Sinking 250mm X 200mm Big dia Tubewell & New UPVC/DI Pipe line & other allied works (PART ¿A) at RAKHALMARI PWSS under Cooch Behar Division, PHED 000098ORD/000275/2021-202 ORD/000275/2021-2022 954/CD 31/12/2021 1 13.22 AUGMENTATION OF RAKHALMARI PIPED WATER SUPPLY SCHEME (SM/09299) 13.22 13.22
49 Coochbehar Division SUBHAS CHANDRA ROY Execution of different works related to AUG. of Kurshamari PWSS under JAL JEEVAN MISSION SE,NBC-1,PHED A.O. No.: 11/1-5/NBC-1; Dt.: 05-04-23 000098ORD/000290/2023-202 ORD/000290/2023-2024 11/CD 05/04/2023 1 70.78 Ground water based KURSHAMARI PWSS (SM/18139) 70.78 70.78
50 Coochbehar Division NABIN DEBNATH Execution of different works related to BHALKA area related to Baro Soulmari PWSS under JAL JEEVAN MISSION 000098ORD/000301/2023-202 ORD/000301/2023-2024 1055/CD 22/09/2023 1 8.78 BHALKA PIPED WATER SUPPLY SCHEME (SM/15237) 8.78 8.78
51 Coochbehar Division DULAL MAJUMDER Procurement of Chemicals Glassware & consumables for Mekhliganj Sub-District Water testing Laboratories 000098ORD/000312/2022-202 ORD/000312/2022-2023 921/CD 26/09/2022 1 3.13 Procurement of Chemicals & Consumables, Glassware etc. and Annual O & M of water testing laboratories . (SM/06622) 3.13 3.13
52 Coochbehar Division KARTICK CH SEAL Execution of different works related to GHUGHUMARI PWSS under JAL JEEVAN MISSION 000098ORD/000349/2023-202 ORD/000349/2023-2024 1333/CD 24/11/2023 1 9.75 Augmentation of GHUGHUMARI Piped Water Supply Scheme (SM/16531) 9.75 9.75
53 Coochbehar Division AASHIRBAD ENTERPRISE Providing FHTC & other allied works at CHHATOA PWSS under JAL JEEVAN MISSION 000098ORD/000355/2022-202 ORD/000355/2022-2023 3008/CD 29/09/2022 1 4.67 Rejuvination of Chhatoa water supply scheme (SM/09819) 4.67 4.67
54 Coochbehar Division SUBHAS CHANDRA ROY Execution of different works related to BARO GOPALPUR PWSS under JAL JEEVAN MISSION 000098ORD/000361/2023-202 ORD/000361/2023-2024 1396/CD 05/12/2023 1 33.11 BARA GOPALPUR PIPED WATER SUPPLY SCHEME. (SM/13161) 33.11 33.11
55 Coochbehar Division JAI BHARAT COMERCIAL CORPORATI Providing FHTC and Laying of Pipe line & Construction of Pump house HW Site of PANIGRAM ZONE - II PWSS under JAL JEEVAN MISSION (PART ¿Y) 000098ORD/000383/2022-202 ORD/000383/2022-2023 802/CD 09/09/2022 1 8.52 PANIGRAM PIPED WATER SUPPLY SCHEME (SM/12271) 8.52 8.52
56 Coochbehar Division SUBHAS CHANDRA ROY Laying of Pipe Line & Construction Of 250 CUM OHR At BARA PINJARER JHAR PWSS under JAL JEEVAN MISSION 000098ORD/000400/2022-202 ORD/000400/2022-2023 1133/CD W 03/11/2022 1 8.01 BARA PINJARIRJHAR PIPED WATER SUPPLY SCHEME. (SM/13163) 8.01 8.01
57 Coochbehar Division MS SSB CONSTRUCTION CO Providing FHTC & Laying of Pipe line Construction of Boundary wall, Pumphouse at 3RD site & other allied works at ANDARAN NIZTARAF PWSS Under Cooch Behar division P.H.E.Dte. (Part-A) 000098ORD/000401/2022-202 ORD/000401/2022-2023 1165/CD 10/11/2022 1 41.7 Augmentation works for Providing Functional House Hold Tap Connection ( FHTC) within Commandarea of ANDARAN NIJTARAF Piped water supply schemes. (SM/10221) 41.7 41.7
58 Coochbehar Division MANABENDRA DE Shifting of Pipe line incl River Crossing with suppurting RSJ pile at Kangratoli immigr. Rd. at PURBAFULKADABRI PWSS under Cooch Behar Division, PHED 000098ORD/000408/2021-202 ORD/000408/2021-2022 1466/CD 10/03/2022 1 3.56 Augmentation of PURBA FULKARDABRI Piped water supply schemes. (SM/10162) 3.56 3.56
59 Coochbehar Division HIRAK CONSTRUCTION Providing FHTC & other allied works at RASIKBILL ZONE ¿ I PWSS under JAL JEEVAN MISSION 000098ORD/000416/2022-202 ORD/000416/2022-2023 1226/CD 28/11/2022 2 33.4 Augmentation of Rasikbil piped water supply scheme. (SM/09300) 33.4 33.4
60 Coochbehar Division S AND P ENTERPRISE Providing functional house hold tap connection (FHTC), including Sinking of Big dia T/W, Construction of Pump house, installation of IEP with other allied works in connection with Augmentation work of DAKSHIN BAJEJAMA Piped Water Supply Scheme under Cooch 000098ORD/000419/2021-202 ORD/000419/2021-2022 1517/CD 15/03/2022 1 48.88 Augmentation of Dakshin Bajejama Water Supply Scheme. (SM/09807) 48.88 48.88
61 Coochbehar Division ASHIM KUMAR CHAKRABORTY Providing FHTC & other allied works at DHALPAL PWSS under JAL JEEVAN MISSION 000098ORD/000420/2022-202 ORD/000420/2022-2023 1278/CD 02/12/2022 1 26.34 AUGMENTATION OF DHALPAL PIPED WATER SUPPLY SCHEME (SM/09303) 26.34 26.34
62 Coochbehar Division NABIN DEBNATH Construction of 300 cum OHR Providing FHTC New Pipe line & other allied works (PART ¿A) at ANDARAN FULBARI ZONE-II PWSS under Cooch Behar Division, PHED 000098ORD/000425/2021-202 ORD/000425/2021-2022 1475/CD 10/03/2022 2 26.9 AUGMENTATION OF ANDARAN PHULBARI PIPED WATER SUPPLY SCHEME (SM/10049) 26.9 26.9
63 Coochbehar Division SHIBA ENTERPRISE Providing FHTC, Construction of boundary wall, repairing of reservior,baoundary wall and laying new UPVC pipe line and other allied works at in-connection with augmentation KAUWARDARA PWSS under Cooch Behar Division, PHED.(Part-A) 000098ORD/000428/2021-202 ORD/000428/2021-2022 1524/CD 15/03/2022 2 27.63 Augmentation of Kauardara Water Supply Scheme (SM/09808) 27.63 27.63
64 Coochbehar Division GHOSH AND SAHA CONSTRUCTION Constructions of 350 OHR as per Departmental Design & drawing , New laying of UPVC/DI Pipe Line(PART-A) , Providing F.H.T.C & other allied work at Kaminirghat PWSS under Cooch Behar Division , P.H.E Dte. 000098ORD/000431/2021-202 ORD/000431/2021-2022 1515/CD 15/03/2022 1 45 AUGMENTATION OF KAMINIRGHAT PIPED WATER SUPPLY SCHEME (SM/09810) 45 45
65 Coochbehar Division Z STAR COMMOTRADE PVT LTD Providing FHTC Construction of 300 cum OHR and Laying of Pipe line at MORADANGA ZONE ¿ I I PWSS under JAL JEEVAN MISSION (PART ¿A) 000098ORD/000431/2022-202 ORD/000431/2022-2023 1333/CD 19/12/2022 1 13.17 Augmentation of MARADANGA Piped Water Supply Scheme (SM/14112) 13.17 13.17
66 Coochbehar Division SAIMONS CO- OPARATIVE LAB CONT Providing FHTC, Construction of boundary wall, repairing of reservior,baoundary wall and laying new UPVC pipe line and other allied works at in-connection with augmentation KAUWARDARA PWSS under Cooch Behar Division, PHED. .(Part-B) 000098ORD/000432/2021-202 ORD/000432/2021-2022 1527/CD 15/03/2022 1 1.78 Augmentation of Kauardara Water Supply Scheme (SM/09808) 1.78 1.78
67 Coochbehar Division MA MAHAMAYA UNP.CO-OP LABOUR C Execution of different works related to SHIKARPUR P2 PWSS under JAL JEEVAN MISSION 000098ORD/000439/2022-202 ORD/000439/2022-2023 1416/CD 29/12/2022 1 3.68 Augmentation of Ground water based Shikarpur PWSS to accommodate FHTC in Tufanganj-I Block (SM/13381) 3.68 3.68
68 Coochbehar Division MATRI ENTERPRISEES Providing FHTC, Constructions 3.6 m x 3.0 m switch room & Boundary wall, Street stand post along with soakpit , New laying of UPVC/DI Pipe Line & Other allied works at Baneswar Zone-II (Part-B) PWSS under Cooch Behar Division, P.H.E Dte. 000098ORD/000442/2021-202 ORD/000442/2021-2022 1434/CD 10/03/2022 1 3.58 AUGMENTATION OF BANESWAR PIPED WATER SUPPLY SCHEME (SM/10152) 3.58 3.58
69 Coochbehar Division SIDHARTHA ROY Execution of different works related to CHAKIARCHHARA PWSS under JAL JEEVAN MISSION SE NBC1/PHED A. O.: 975/1-5/NBC-1; DT: 19-01-23 000098ORD/000456/2022-202 ORD/000456/2022-2023 1507/CD 19/01/2023 1 65.15 AUGMENTATION OF CHEKIACHARA PIPED WATER SUPPLY SCHEME (SM/12371) 65.15 65.15
70 Coochbehar Division GHOSH AND SAHA CONSTRUCTION Execution of different works related to NAHARHATBANDAR PWSS under JAL JEEVAN MISSION SE NBC1/PHED A. O.: 977/1-5/NBC-1; DT: 19-01-23 000098ORD/000457/2022-202 ORD/000457/2022-2023 1508/CD 19/01/2023 2 230.47 AUGMENTATION OF NAHARHAT BANDAR PIPED WATER SUPPLY SCHEME (SM/11486) 230.47 230.47
71 Coochbehar Division NABIN DEBNATH Execution of different works related to PUTIMARI BAKSIBAS PWSS under JAL JEEVAN MISSIONSE NBC1/PHED A. O.: 978/1-5/NBC-1; DT: 19-01-23 000098ORD/000458/2022-202 ORD/000458/2022-2023 1509/CD 19/01/2023 1 30.77 PUTIMARI BAKSIBAS PIPED WATER SUPPLY SCHEME. (SM/13816) 30.77 30.77
72 Coochbehar Division M/S. DUTTA AND CO Execution of different works related to BHANGRI PRATHAM KHANDA PWSS under JAL JEEVAN MISSIONSE NBC1/PHED A. O.: 979/1-5/NBC-1; DT: 19-01-23 000098ORD/000459/2022-202 ORD/000459/2022-2023 1510/CD 19/01/2023 1 173.09 BHANGRI PRATHAM KHANDA PIPED WATER SUPPLY SCHEME. (SM/13461) 173.09 173.09
73 Coochbehar Division S DUTTA Execution of different works related to MAINAGURI DIGHALHATI PWSS under JAL JEEVAN MISSION SE NBC1/PHED A. O.: 982/1-5/NBC-1; DT: 19-01-23 000098ORD/000462/2022-202 ORD/000462/2022-2023 1513/CD 19/01/2023 1 91.44 MAINAGURI DIGHALHATI PIPED WATER SUPPLY SCHEME. (SM/13400) 91.44 91.44
74 Coochbehar Division HARIDAS GHOSH Execution of different works related to KOCHABARI PWSS under JAL JEEVAN MISSION SE NBC1/PHED A. O.: 983/1-5/NBC-1; DT: 19-01-23 000098ORD/000463/2022-202 ORD/000463/2022-2023 1514/CD 19/01/2023 2 133.5 KOCHABARI PIPED WATER SUPPLY SCHEME. (SM/13342) 133.5 133.5
75 Coochbehar Division ASHIM KUMAR CHAKRABORTY Providing FHTC 3rd Site Pump House Boundary Wall SSPost with soak pit Sinking 250mm X 200mm Big dia Tubewell & New UPVC/DI/GI Pipe line and other allied works (PART ¿B) at CHILAKHANA PWSS under Cooch Behar Division, PHED 000098ORD/000465/2021-202 ORD/000465/2021-2022 1605/CD 24/03/2022 1 22.99 Augmentation of Chilakhana piped water supply scheme. (SM/10148) 22.99 22.99
76 Coochbehar Division M/S. NITYAGOPAL BANIK Execution of different works related to CHHITRI BARI PWSS under JAL JEEVAN MISSIONSE NBC1/PHED A. O.: 985/1-5/NBC-1; DT: 19-01-23 000098ORD/000465/2022-202 ORD/000465/2022-2023 1516/CD 19/01/2023 1 9.27 CHHITRI BARI PIPED WATER SUPPLY SCHEME. (SM/13213) 9.27 9.27
77 Coochbehar Division MESSRS A.B.G CONSTRUCTION Providing FHTC 3rd Site Pump House Boundary Wall SSPost with soak pit Sinking 250mm X 200mm Big dia Tubewell & New UPVC/DI/GI Pipe line and other allied works (PART ¿B) at SITAI ZONE ¿ I I PWSS under Cooch Behar Division, PHED 000098ORD/000466/2021-202 ORD/000466/2021-2022 1604/CD 24/03/2022 2 43.83 Augmentation of Sitai piped water supply scheme. (SM/10147) 43.83 43.83
78 Coochbehar Division SHREE RANI SATI ENTERPRISE Execution of different works related to PETLAEPRA PWSS under JAL JEEVAN MISSIONSE NBC1/PHED A. O.: 986/1-5/NBC-1; DT: 19-01-23 000098ORD/000466/2022-202 ORD/000466/2022-2023 1517/CD 19/01/2023 1 1.36 PETLAEPRA PIPED WATER SUPPLY SCHEME (SM/13285) 1.36 1.36
79 Coochbehar Division SANJAY MANDAL Execution of different works related to (with in B Chilakhana Z1) DEOCHARAI PWSS under JAL JEEVAN MISSION 000098ORD/000480/2023-202 ORD/000480/2023-2024 283/CD 09/02/2024 1 3.45 Augmentation of Bajejama Chilakhana ZONE-I PWSS (SM/16931) 3.45 3.45
80 Coochbehar Division SHRI ANNAPURNA DISTRIBUTORS Execution of different works related to PRAN MAJUMDER PWSS under JAL JEEVAN MISSION PART C 000098ORD/000485/2023-202 ORD/000485/2023-2024 287/CD 09/02/2024 1 23.48 GROUND WATER BASED PRAN MAJUMDER PIPED WATER SUPPLY AUGMENTATION SCHEME (SM/16525) 23.48 23.48
81 Coochbehar Division BABA LOKENATH UN EMPLOYED ENGI Execution of different works related to HASTABUD KASALDANGA PWSS under JAL JEEVAN MISSION SE,NBC-1,PHED A.O. No.: 1003/1-5/NBC-1; Dt.: 24-01-23 000098ORD/000487/2022-202 ORD/000487/2022-2023 1552/CD 24/01/2023 1 72.42 HASTABUD KASALDANGA PIPED WATER SUPPLY SCHEME. (SM/13290) 72.42 72.42
82 Coochbehar Division PALLAB BHAWAL Execution of different works related to UCHALPUKURI ZONE -I PWSS under JAL JEEVAN MISSION SE,NBC-1,PHED A.O. No.: 1017/1-5/NBC-1; Dt.: 24-01-23 000098ORD/000489/2022-202 ORD/000489/2022-2023 1554/CD 24/01/2023 1 148.19 AUGMENTATION OF UCHAL PUKHARI ZONE-I PUBLICWATER SUPPLY SCHEME. (SM/13228) 148.19 148.19
83 Coochbehar Division SWAPAN KUMAR ROY Execution of different works related to BHOGMARA PWSS under JAL JEEVAN MISSION 000098ORD/000489/2023-202 ORD/000489/2023-2024 291/CD 09/02/2024 1 43.54 Augmentation of Bhogmara Piped Water Supply Scheme. (SM/10007) 43.54 43.54
84 Coochbehar Division SHIBA ENTERPRISE Execution of different works related to SATKURA PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1015/1-5/NBC-1; Dt.: 24-01-23 000098ORD/000491/2022-202 ORD/000491/2022-2023 1556/CD 24/01/2023 1 84.04 REJUVENATION OF SATKURA PIPED WATER SUPPLY SCHEME (SM/13160) 84.04 84.04
85 Coochbehar Division Z STAR COMMOTRADE PVT LTD Execution of different works related to SITALKUCHI ZONE -III PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1014/1-5/NBC-1; Dt.: 24-01-23 000098ORD/000492/2022-202 ORD/000492/2022-2023 1557/CD 24/01/2023 1 28.95 AUGMENTATION OF GROUND WATER BASED SITALKUCHI WATER SUPPLY SCHEME ZONE-III TO ACCOMMODATE FHTC IN SITALKUCHI BLOCK (SM/13379) 28.95 28.95
86 Coochbehar Division M/S SURAJIT MAJUMDER Execution of different works related to (Kismat Bhatrigachhi area) CHHOTO BOALMARI PWSS under JAL JEEVAN MISSION 000098ORD/000492/2023-202 ORD/000492/2023-2024 294/CD 09/02/2024 1 1.36 CHHOTO BOALMARI PIPED WATER SUPPLY SCHEME. (SM/18240) 1.36 1.36
87 Coochbehar Division MANABENDRA DE Execution of different works related to KUCHLIBARI Z 2 PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1013/1-5/NBC-1; Dt.: 24-01-23 000098ORD/000493/2022-202 ORD/000493/2022-2023 1558/CD 24/01/2023 1 15 AUGMENTATION OF GROUND WATER BASED KUCHLIBARI ZONE-II PWSS (SM/13225) 15 15
88 Coochbehar Division UTPAL CHAKRABORTY Execution of different works related to SANTOSHPUR ZONE-I PWSS under JAL JEEVAN MISSION SE,NBC-1,PHED A.O. No.: 1010/1-5/NBC-1; Dt.: 24-01-23 000098ORD/000496/2022-202 ORD/000496/2022-2023 1561/CD 24/01/2023 1 35.07 Augmentation of Santoshpur Zone-I PWSS Accommodate FHTC in TFG-I Block under Cooch Behar Division. (SM/13385) 35.07 35.07
89 Coochbehar Division SWAPAN KUMAR ROY Execution of different works related to SOULMARI Z 2 PWSS under JAL JEEVAN MISSION SE,NBC-1,PHED A.O. No.: 1009/1-5/NBC-1; Dt.: 24-01-23 000098ORD/000497/2022-202 ORD/000497/2022-2023 1562/CD 24/01/2023 1 204.28 Augmentation of Ground water based Soulmari Zone-II Piped Water Supply Scheme(Dinhata-II) (SM/13159) 204.28 204.28
90 Coochbehar Division LONGLAST PIPES (INDIA) PVT. LT Sinking of 250mm x 200 mm Big dia. Tube well with UPVC Pipes & Strainer at 3rd Site ofSATBHANDARI PWSS under Cooch Behar Division PHE Dte. 000098ORD/000498/2021-202 ORD/000498/2021-2022 1446/CD 10/03/2022 1 10.61 Rejuvination of Sathbhandari water supply scheme (SM/09821) 10.61 10.61
91 Coochbehar Division LONGLAST PIPES (INDIA) PVT. LT Sinking of 250mm x 200 mm Big dia. Tube well with UPVC Pipes & Strainer at 3rd Site of MARICHBARI PWSS under Cooch Behar Division PHE Dte. 000098ORD/000500/2021-202 ORD/000500/2021-2022 1448/CD 10/03/2022 1 10.65 Rejuvenation of MARICHBARI Water Supply Scheme (SM/10369) 10.65 10.65
92 Coochbehar Division BIJOY ROY Execution of different works related to NENDARPAR PWSS under JAL JEEVAN MISSION 000098ORD/000504/2023-202 ORD/000504/2023-2024 300/CD 09/02/2024 1 19.72 NENDARPAR PWSS (SM/18137) 19.72 19.72
93 Coochbehar Division RAJAT ROY Providing FHTC Laying of Pipe Line & other allied works at SITALKUCHI ZONE III PWSS under JAL JEEVAN MISSION 000098ORD/000505/2022-202 ORD/000505/2022-2023 1233/CD 28/11/2022 1 7.9 AUGMENTATION OF GROUND WATER BASED SITALKUCHI WATER SUPPLY SCHEME ZONE-III TO ACCOMMODATE FHTC IN SITALKUCHI BLOCK (SM/13379) 7.9 7.9
94 Coochbehar Division MA MAHAMAYA UNP. CO-OP LABOUR Execution of different works related to LAWCHAPRA PWSS under JAL JEEVAN MISSION PART B 000098ORD/000505/2023-202 ORD/000505/2023-2024 301/CD 09/02/2024 1 26.31 Rejuvenation of LAUCHAPRA Piped Water Supply Scheme (SM/10231) 26.31 26.31
95 Coochbehar Division MATARA CONSTRUCTION CO. Execution of different works related to RAJPUR PWSS under JAL JEEVAN MISSION 000098ORD/000506/2023-202 ORD/000506/2023-2024 303/CD 09/02/2024 1 7.73 Rajpur Piped Water Supply Scheme (SM/04974) 7.73 7.73
96 Coochbehar Division MS SSB CONSTRUCTION CO Execution of different works related to B.ATIABARI P.KHANDA PWSS under JAL JEEVAN MISSION 000098ORD/000507/2023-202 ORD/000507/2023-2024 304/CD 09/02/2024 1 42.83 REJUVENATION OF BARA ATIABARI PRATHAM KHANDA PIPED WATER SUPPLY SCHEME (SM/18299) 42.83 42.83
97 Coochbehar Division LIMRA SOCIAL WELFARE SOCIETY Wall Painting, Designing, Making & erecting of DB using logo tagline for Cooch Behar districts under Jal Jeevan Mission (JJM) Support Activities Part C 000098ORD/000508/2023-202 ORD/000508/2023-2024 305/CD 09/02/2024 1 24.87 GROUND WATER BASED JORPATKI PIPED WATER SUPPLY SCHEME. (SM/14139) 24.87 24.87
98 Coochbehar Division AUXILIARY TUBEWELL DRILLERS Sinking of 250mm x 200 mm Big dia. Tube well with UPVC Pipes & Strainer at 3rd Site of DEOCHARAIPWSS under Cooch Behar Division PHE Dte. 000098ORD/000509/2021-202 ORD/000509/2021-2022 1457/CD 10/03/2022 1 4.58 Rejuvenation of DEOCHARAI Water Supply Scheme (SM/10364) 4.58 4.58
99 Coochbehar Division MS SSB CONSTRUCTION CO Execution of different works related to BHUTKURA PWSS under JAL JEEVAN MISSION 000098ORD/000513/2022-202 ORD/000513/2022-2023 1631/CD 08/02/2023 1 42.75 BHUTKURA PIPED WATER SUPPLY SCHEME (SM/14730) 42.75 42.75
100 Coochbehar Division MS SSB CONSTRUCTION CO Execution of different works related to BHUTKURA PWSS under JAL JEEVAN MISSION 000098ORD/000514/2023-202 ORD/000514/2023-2024 312/CD 09/02/2024 1 44.37 BHUTKURA PIPED WATER SUPPLY SCHEME (SM/14730) 44.37 44.37
101 Coochbehar Division UMEX POLYMERS PVT LTD Execution of different works related to INDRA NARAYAN PWSS under JAL JEEVAN MISSION 000098ORD/000515/2022-202 ORD/000515/2022-2023 1602/CD 03/02/2023 2 49.37 INDRA NARAYAN PWSS (SM/14205) 49.37 49.37
102 Coochbehar Division KHOKAN DAS Execution of different works related to MAIDAM PWSS under JAL JEEVAN MISSION 000098ORD/000515/2023-202 ORD/000515/2023-2024 313/CD 09/02/2024 1 36.13 Maidam Piped Water Supply Scheme (SM/16981) 36.13 36.13
103 Coochbehar Division LIMRA SOCIAL WELFARE SOCIETY Wall Painting, Designing, Making & erecting of DB using logo tagline for Cooch Behar districts under Jal Jeevan Mission (JJM) Support Activities Part D 000098ORD/000517/2023-202 ORD/000517/2023-2024 315/CD 09/02/2024 1 20.71 BHOGRAMGURI & ITS ADJOINING MOUZAS PWSS (SM/18411) 20.71 20.71
104 Coochbehar Division SHRI ANNAPURNA DISTRIBUTORS Execution of different works related to PURBA DHULIA BALDIHATI PWSS under JAL JEEVAN MISSION 000098ORD/000519/2022-202 ORD/000519/2022-2023 1606/CD 03/02/2023 1 46.94 AUGMENTATION FOR PURBBA DHULIA BALDIHATI PIPED WATER SUPPLY SCHEME (SM/11983) 46.94 46.94
105 Coochbehar Division TAPAN CHANDA Supply and delivery of 200 mm dia UPVC pipe(CD) for Balarampur Zone-II 3rd Site Tubewell under Cooch Behar Division , P.H.E Dte. 000098ORD/000520/2021-202 ORD/000520/2021-2022 1568/CD 23/03/2022 1 2.98 Retrofitting Cum Rejuvenation of existing ground water baed Balarampur piped water supply scheme (SM/10006) 2.98 2.98
106 Coochbehar Division M/S PRADIP KUMAR PAL Execution of different works related to JHAUKUTHI PWSS under JAL JEEVAN MISSION 000098ORD/000521/2023-202 ORD/000521/2023-2024 319/CD 09/02/2024 1 40.21 Augmentation of Bajejama Chilakhana ZONE-I PWSS (SM/16931) 40.21 40.21
107 Coochbehar Division AMBITIOUS ENTERPRISE Execution of different works related to AUG. of KHATTIMARI ZONE-II PWSS under JAL JEEVAN MISSION 000098ORD/000523/2022-202 ORD/000523/2022-2023 1678/CD 13/02/2023 1 53.6 Augmentation of Ground Water Based Khattimari Zone-II PWSS (Dinhata-II) (SM/13153) 53.6 53.6
108 Coochbehar Division M/S KARNATAKA CONSTRUCTION COM Execution of different works related to CHHOTA KESHARI BARI PWSS under JAL JEEVAN MISSION 000098ORD/000524/2022-202 ORD/000524/2022-2023 1679/CD 13/02/2023 1 74.47 CHHOTA KESHARI BARI PIPED WATER SUPPLY SCHEME. (SM/13212) 74.47 74.47
109 Coochbehar Division GOUTAM KUMAR DAS Providing FHTC Works, Laying of pipe line Constructions of 3rd site Pump House, Boundary Wall at PANISALA W.S.S under Cooch Behar Division P.H.E.Dte. 000098ORD/000528/2021-202 ORD/000528/2021-2022 1628/CD 29/03/2022 1 2.89 Augmentation of Panisala PWSS. (SM/16526) 2.89 2.89
110 Coochbehar Division BIJOY ROY Providing FHTC Works, Laying of pipe line Constructions of Switch Room, Boundary Wall at SINGIMARI PASCHIMPAR W.S.S under Cooch Behar Division P.H.E.Dte. PART A 000098ORD/000533/2021-202 ORD/000533/2021-2022 1633/CD 29/03/2022 2 40.95 Augmentation of Singimari Bhetaguri piped water supply scheme. (SM/10149) 40.95 40.95
111 Coochbehar Division M/S. SAHA CONSTRUCTION Execution of different works related to BHANGRI P KHANDA PWSS under JAL JEEVAN MISSION 000098ORD/000537/2023-202 ORD/000537/2023-2024 325/CD 09/02/2024 1 29.32 Daribash Pratham Khanda (SM/14948) 29.32 29.32
112 Coochbehar Division GOUTAM KUMAR DAS Execution of different works related to BAROKODALI Z 1 PWSS under JAL JEEVAN MISSION 000098ORD/000542/2023-202 ORD/000542/2023-2024 631/CD 11/03/2024 1 55.95 AUGMENTATION OF BARA KODALI ZONE-II PWSS (SM/13182) 55.95 55.95
113 Coochbehar Division GOUTAM KUMAR DAS Execution of different works related to GABUA PWSS under JAL JEEVAN MISSION 000098ORD/000544/2023-202 ORD/000544/2023-2024 638/CD 11/03/2024 1 49.13 GABUA PIPED WATER SUPPLY SCHEME (SM/13458) 49.13 49.13
114 Coochbehar Division GHOSH AND SAHA CONSTRUCTION Execution of different works related to KSHETI PWSS under JAL JEEVAN MISSION SE,NBC-1,PHED A.O. No.: 1240/1-5/NBC-1; Dt.: 02-03-23 000098ORD/000545/2022-202 ORD/000545/2022-2023 1785/CD 02/03/2023 1 75.53 KSHETI PIPED WATER SUPPLY SCHEME. (SM/13208) 75.53 75.53
115 Coochbehar Division GOUTAM KUMAR DAS Laying DI P/Line & other allied works related to BAROKODALI Z 2 PWSS under JAL JEEVAN MISSION 000098ORD/000547/2023-202 ORD/000547/2023-2024 604/CD 11/03/2024 1 26.15 AUGMENTATION OF BARA KODALI ZONE-II PWSS (SM/13182) 26.15 26.15
116 Coochbehar Division GHOSH AND SAHA CONSTRUCTION Execution of different works related to KHARI ANALDHONDRA PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1231/1-5/NBC-1; Dt.: 02-03-23 000098ORD/000550/2022-202 ORD/000550/2022-2023 1786/CD 02/03/2023 1 25.58 KHARI ANALDHONDRA PWSS (SM/14136) 25.58 25.58
117 Coochbehar Division GOUTAM KUMAR DAS Execution of different works related to DHALDABRI PWSS under JAL JEEVAN MISSION 000098ORD/000551/2023-202 ORD/000551/2023-2024 620/CD 11/03/2024 1 52.27 AUGMENTATION OF GROUND WATER BASED DHALDIBARI PIPED WATER SUPPLY SCHEME OF TUFANGANJ - II BLOCK WITHIN COOCHBEHAR DISTRICT (SM/16165) 52.27 52.27
118 Coochbehar Division MS BIDYUT SARKAR Execution of different works related to BAISGURI KHANDA PWSS under JAL JEEVAN MISSION SE,NBC-1,PHED A.O. No.: 1242/1-5/NBC-1; Dt.: 02-03-23 000098ORD/000552/2022-202 ORD/000552/2022-2023 1774/CD 02/03/2023 1 85.25 BAISGURI KHANDA PIPED WATER SUPPLY SCHEME (SM/13284) 85.25 85.25
119 Coochbehar Division MAHENDRA CHHETRI Execution of different works related to CHAUDANGA PWSS under JAL JEEVAN MISSION 000098ORD/000553/2022-202 ORD/000553/2022-2023 1610/CD 03/02/2023 2 81.06 CHAUDANGA PIPED WATER SUPPLY SCHEME. (SM/13146) 81.06 81.06
120 Coochbehar Division SSPR VALVE MANUFACTURING PVT. Execution of different works related to BHOGRAMGURI PWSS under JAL JEEVAN MISSION 000098ORD/000554/2023-202 ORD/000554/2023-2024 636/CD 11/03/2024 1 24.69 BHOGRAMGURI & ITS ADJOINING MOUZAS PWSS (SM/18411) 24.69 24.69
121 Coochbehar Division DAS ENTERPRISE Execution of different works related to DEBOTTAR BAKSHIGANJ PWSS under JAL JEEVAN MISSION 000098ORD/000555/2022-202 ORD/000555/2022-2023 1702/CD 13/02/2023 1 35.11 Ground Water Based Piped Water Supply Scheme DEBOTTAR BAKSHIGANJ (BLOCK-HALDIBARI) (SM/13287) 35.11 35.11
122 Coochbehar Division M/S BADAL CH SAHA Preparation of DPR for Bhoram Piped Water Supply Scheme under Cooch Behar Sadar Sub-Division of Cooch Behar Division, P.H.E. Dte. 000098ORD/000557/2021-202 ORD/000557/2021-2022 1541/CD 17/03/2022 1 6.75 Procurement of service consultants for preparation of DPR of New Piped Water Supply Scheme for uncovered rural area of Jalpaiguri, Alipurduar and Coochbehar District in West Bengal. (SM/11505) 9.45 9.45
123 Coochbehar Division D S CONSTRUCTION Execution of different works related to HOKADAHA PRATHAM KHANDA PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1111/1-5/NBC-1; Dt.: 13-02-23 000098ORD/000569/2022-202 ORD/000569/2022-2023 1687/CD 13/02/2023 1 4.37 HOKADAHA PRATHAM KHANDA PWSS (SM/14938) 4.37 4.37
124 Coochbehar Division M/S SOBHA & CO. Preparation of DPR for Angarkata Paradubi Piped Water Supply Scheme under Mathabhanga Sub-Division of Cooch Behar Division, P.H.E. Dte. 000098ORD/000571/2021-202 ORD/000571/2021-2022 1387/CD 04/03/2022 1 9.44 Procurement of service consultants for preparation of DPR of New Piped Water Supply Scheme for uncovered rural area of Jalpaiguri, Alipurduar and Coochbehar District in West Bengal. (SM/11505) 9.44 9.44
125 Coochbehar Division PALLAB BHAWAL Execution of different works related to UCHALPUKURI ZONE - II PWSS under JAL JEEVAN MISSION SE,NBC-1,PHED A.O. No.: 1121/1-5/NBC-1; Dt.: 13-02-23 000098ORD/000572/2022-202 ORD/000572/2022-2023 1690/CD 13/02/2023 1 163.47 Augmentation of Ground Water Based UCHALPUKURI ZONE-II Piped Water Supply Scheme to Accommodate FHTC in Mekhliganj Block within Cooch Behar District under Cooch Behar Division, P.H.E. Dte. (SM/13157) 163.47 163.47
126 Coochbehar Division KAJAL KUMAR DE Execution of different works related to BARA PHALIMARI PWSS under JAL JEEVAN MISSION SE,NBC-1,PHED A.O. No.: 1114/1-5/NBC-1; Dt.: 13-02-23 000098ORD/000575/2022-202 ORD/000575/2022-2023 1876/CD 14/03/2023 1 18.14 AUGMENTATION OF GROUND WATER BASED BARA PHALIMARI PWSS DINHATA -I BLOCK WITHIN COOCHBEHAR DISTRICT UNDER COOCHBEHAR DIVISION, PHE DTE (SM/14928) 18.14 18.14
127 Coochbehar Division MALAY KR.DEB Execution of different works related to JIRANPUR PART B PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1119/1-5/NBC-1; Dt.: 13-02-23 000098ORD/000576/2022-202 ORD/000576/2022-2023 1856/CD 14/03/2023 1 111.82 AUGMENTATION OF GROUND WATER JIRANPUR ZONE-I (B) ACCOMODATE FHTC IN HALDIBARI BLOCK WITHIN COOCH BEHAR DISTRICT UNDE COOCH BEHAR DIVISION (SM/13149) 111.82 111.82
128 Coochbehar Division M/S. MANDAL CONSTRUCTION Laying DI P/Line & other allied works related to CHAKCHAKA PWSS under JAL JEEVAN MISSION 000098ORD/000577/2023-202 ORD/000577/2023-2024 617/CD 11/03/2024 1 14.41 AUGUMENTATION OF GROUND WATER BASED CHAKCHAKA ZONE II PWSS COOCHBEHAR II BLOCK WITHIN COOCHBEHAR DISTRICT UNDER COOCHBEHAR DIVISION , PHE DTE (SM/18093) 14.41 14.41
129 Coochbehar Division MATARA CONSTRUCTION CO. Execution of different works related to PASCHIM MOAMARI PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1208/1-5/NBC-1; Dt.: 01-03-23 000098ORD/000579/2022-202 ORD/000579/2022-2023 1769/CD 02/03/2023 1 110.26 PASCHIM MOAMARI PIPED WATER SUPPLY SCHEME (SM/13619) 110.26 110.26
130 Coochbehar Division JAL PRAVAHIKA PVT. LTD. Execution of different works related to MAHISHCHARU PWSS under JAL JEEVAN MISSION SE,NBC-1,PHED A.O. No.: 1207/1-5/NBC-1; Dt.: 01-03-23 000098ORD/000580/2022-202 ORD/000580/2022-2023 1770/CD 02/03/2023 1 61.54 MAHISHCHARU PIPED WATER SUPPLY SCHEME. (SM/13207) 61.54 61.54
131 Coochbehar Division LIMRA SOCIAL WELFARE SOCIETY Designing, Making & erecting of DB using logo tagline for Cooch Behar districts under Jal Jeevan Mission (JJM) Support Activities Part D 000098ORD/000581/2023-202 ORD/000581/2023-2024 621/CD 11/03/2024 1 25.83 AUGMENTATION OF GROUND WATER BASED SITALKUCHI WATER SUPPLY SCHEME ZONE-I TO ACCOMMODATE FHTC IN SITALKUCHI BLOCK (SM/13316) 25.83 25.83
132 Coochbehar Division LIMRA SOCIAL WELFARE SOCIETY Designing, Making & erecting of DB using logo tagline for Cooch Behar districts under Jal Jeevan Mission (JJM) Support Activities Part E 000098ORD/000582/2023-202 ORD/000582/2023-2024 599/CD 11/03/2024 1 25.91 KHARI ANALDHONDRA PWSS (SM/14136) 25.91 25.91
133 Coochbehar Division SUBHAS CHANDRA ROY Execution of different works related to BARA GOPALPUR PWSS under JAL JEEVAN MISSION SE,NBC-1,PHED A.O. No.: 1109/1-5/NBC-1; Dt.: 13-02-23 000098ORD/000586/2022-202 ORD/000586/2022-2023 1671/CD 13/02/2023 1 102.75 BARA GOPALPUR PIPED WATER SUPPLY SCHEME. (SM/13161) 102.75 102.75
134 Coochbehar Division MS SSB CONSTRUCTION CO Execution of different works related to KHARIJA DURGANAGAR DWITIA KHANDA PWSS under JAL JEEVAN MISSION 000098ORD/000592/2022-202 ORD/000592/2022-2023 1672/CD 13/02/2023 1 1.99 KHARIJA DURGANAGAR DWITIYA KHANDA PWSS (SM/14449) 1.99 1.99
135 Coochbehar Division S & P ENTERPRISE Execution of different works related to ABUAR PATHAR PWSS under JAL JEEVAN MISSION SE,NBC-1,PHED A.O. No.: 1335/1-5/NBC-1; Dt.: 24-03-23 000098ORD/000593/2022-202 ORD/000593/2022-2023 1963/CD 24/03/2023 1 39.86 ABUAR PATHAR PWSS (SM/14202) 39.86 39.86
136 Coochbehar Division M/S J C ENTERPRISE Execution of different works related to DINHATA (P) PWSS under JAL JEEVAN MISSION SE,NBC-1,PHED A.O. No.: 1054/1-5/NBC-1; Dt.: 03-02-23 000098ORD/000598/2022-202 ORD/000598/2022-2023 1613/CD 03/02/2023 1 91.8 DINHATA(P) PIPED WATER SUPPLY SCHEME. (SM/13401) 91.8 91.8
137 Coochbehar Division SANKAR CHAKRABORTY Execution of different works related to DAKHSHIN DIGHALTARI PWSS under JAL JEEVAN MISSION SE,NBC-1,PHED A.O. No.: 1122/1-5/NBC-1; Dt.: 13-02-23 000098ORD/000603/2022-202 ORD/000603/2022-2023 1855/CD 14/03/2023 1 68.04 DAKHSHIN DIGHALTARI PWSS (SM/13388) 68.04 68.04
138 Coochbehar Division M/S TORSHA CONSTRUCTION Execution of different works related to GAJENDRAPUR CHOWRANGEE PWSS under JAL JEEVAN MISSION SE,NBC-1,PHED A.O. No.: 1116/1-5/NBC-1; Dt.: 13-02-23 000098ORD/000604/2022-202 ORD/000604/2022-2023 1854/CD 14/03/2023 1 64.52 AUGMENTATION OF GROUND WATER BASED GAJENDRAPUR CHOWRANGEE PWSS HALDIBARI BLOCK WITHIN COOCH BEHAR DISTRICT UNDER COOCH BEHAR DIVISION, P.H.E. DTE. (SM/14933) 64.52 64.52
139 Coochbehar Division NABIN DEBNATH Execution of different works related to AUG. of BAJEJAMA CHILAKHANA ZONE-II PWSS under JAL JEEVAN MISSION SE,NBC-1,PHED A.O. No.: 1175/1-5/NBC-1; Dt.: 24-02-23 000098ORD/000621/2022-202 ORD/000621/2022-2023 1875/CD 14/03/2023 1 39.36 Augmentation of bajejama chilakhana zone-II PWSS (SM/13386) 39.36 39.36
140 Coochbehar Division M/S J C ENTERPRISE Execution of different works related to JHURIPARA PWSS under JAL JEEVAN MISSION SE,NBC-1,PHED A.O. No.: 1058/1-5/NBC-1; Dt.: 03-02-23 000098ORD/000624/2022-202 ORD/000624/2022-2023 1614/CD 03/02/2023 1 39.79 JHURIPARA PIPED WATER SUPPLY SCHEME (SM/14439) 39.79 39.79
141 Coochbehar Division M/S B PAUL AND COMPANY Execution of different works related to SHALBARI ZONE 2 PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1344/1-5/NBC-1; Dt.: 24-03-23 000098ORD/000625/2022-202 ORD/000625/2022-2023 1962/CD 24/03/2023 1 140.11 SHALBARI PIPED WATER SUPPLY SCHEME (SM/18370) 140.11 140.11
142 Coochbehar Division M/S B PAUL AND COMPANY Execution of different works related to SHALBARI ZONE 1 PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1334/1-5/NBC-1; Dt.: 24-03-23 000098ORD/000627/2022-202 ORD/000627/2022-2023 1961/CD 24/03/2023 1 100.42 SHALBARI PIPED WATER SUPPLY SCHEME (SM/18370) 100.42 100.42
143 Coochbehar Division SHREE RANI SATI ENTERPRISE Execution of different works related to AUG. of Bherbheri PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1365/1-5/NBC-1; Dt.: 28-03-23 000098ORD/000634/2022-202 ORD/000634/2022-2023 1995/CD 28/03/2023 1 2.21 AUGMENTATION OF GROUND WATER BASED BHERBHERI PWSS MATHABHANGA - II BLOCK WITHIN COOCHBEHAR DISTRICT (SM/16140) 2.21 2.21
144 Coochbehar Division MATARA CONSTRUCTION CO. Execution of different works related to AUG. of GOPALPUR PWSS under JAL JEEVAN MISSION SE,NBC-1,PHED A.O. No.: 1368/1-5/NBC-1; Dt.: 28-03-23 000098ORD/000639/2022-202 ORD/000639/2022-2023 2016/CD 30/03/2023 1 81.53 AUGMENTATION OF GROUND WATER BASED GOPALPUR PWSS COOCH BEHAR-II BLOCK WITHIN COOCH BEHAR DISTRICT UNDER COOCH BEHAR DIVISION, P.H.E. DTE. (SM/16146) 81.53 81.53
145 Coochbehar Division SHREE RANI SATI ENTERPRISE Execution of different works related to Aug. of MUKUL DANGA PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1377/1-5/NBC-1; Dt.: 28-03-23 000098ORD/000655/2022-202 ORD/000655/2022-2023 1999/CD 28/03/2023 2 23.15 AUGMENTATION OF GROUND WATER BASED MUKUL DANGA PWSS MATHABHANGA - II BLOCK WITHIN COOCHBEHAR DISTRICT UNDER COOCHBEHAR DIVISION, PHE DTE (SM/16473) 23.15 23.15
146 Coochbehar Division SHREE RANI SATI ENTERPRISE Execution of different works related to PHULBARI PART-A PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1366/1-5/NBC-1; Dt.: 28-03-23 000098ORD/000657/2022-202 ORD/000657/2022-2023 1988/CD 28/03/2023 1 50 AUGMENTATION OF GROUND WATER BASED PHULBARI PART A PWSS (SM/16518) 50 50
147 Coochbehar Division UNIBRO INFRASERV PRIVATE LIMIT Execution of different works related to HEMKUMARI ZONE 3 PWSS under JAL JEEVAN MISSION SE,NBC-1,PHED A.O. No.: 1106/1-5/NBC-1; Dt.: 13-02-23 000098ORD/000671/2022-202 ORD/000671/2022-2023 1884/CD 14/03/2023 1 110.57 AUGMENTATION OF HEMKUMARI PWSS ZONE-III (SM/13150) 110.57 110.57
148 Coochbehar Division GOUTAM KUMAR DAS Execution of different works related to Aug. of BARASOLMARI-SINGIJANI PWSS under JAL JEEVAN MISSION SE,NBC-1,PHED A.O. No.: 1370/1-5/NBC-1; Dt.: 28-03-23 000098ORD/000674/2022-202 ORD/000674/2022-2023 1990/CD 28/03/2023 1 60.94 AUGMENTATION OF GROUND WATER BASED BARASOLMARI-SINGIJANI PWSS MATHABHANGA - II BLOCK WITHIN COOCHBEHAR DISTRICT (SM/16519) 60.94 60.94
149 Coochbehar Division MODERN UN EMP CO OP LAB CONT A Providing FHTC & Construction of Pumphouse at HWSite and laying of Pipe line and other allied works at ATPUKURI ZONE - I PWSS Under Cooch Behar division P.H.E.Dte.(Part-F) 000098ORD/000733/2022-202 ORD/000733/2022-2023 1737/CD 21/02/2023 1 16.95 Atpukhari Piped Water Supply Scheme. (SM/14250) 16.95 16.95
150 Coochbehar Division PARAUDDIN MIAH Extension Work order for Hiring of Diesel Vehicle of Bolero Maxi cab for the Office use of Assistant Engineer, Cooch Behar Sadar Sub-Division, PHE Dte. for 6 Months (February 2023 to July 2023) 000098ORD/000737/2022-202 ORD/000737/2022-2023 1575/CD 31/01/2023 2 1.08 AUGMENTATION OF CHANDAMARI PIPED WATER SUPPLY SCHEME (SM/09302) 1.08 1.08
151 Coochbehar Division BHAGWATI BHUJEL Execution of different works related to TFG LAB under BAJEJAMA CHILAKHANA PRATHAM KHANDA PWSS under JAL JEEVAN MISSION 000098ORD/000781/2023-202 ORD/000781/2023-2024 662/CD 11/03/2024 1 6.94 BAJEJAMA CHILAKHANA PRATHAM KHANDA PWSS (SM/16154) 6.94 6.94
152 Coochbehar Division KRISHNA GOPAL BASK Execution of different works related to BANESWAR Z2 PWSS under JAL JEEVAN MISSION 000098ORD/000786/2022-202 ORD/000786/2022-2023 1862/CD 14/03/2023 1 19.88 AUGMENTATION OF BANESWAR PIPED WATER SUPPLY SCHEME (SM/10152) 19.88 19.88
153 Coochbehar Division BIJOY ROY Execution of different works related to BOXIRHAT PWSS under JAL JEEVAN MISSION 000098ORD/000792/2022-202 ORD/000792/2022-2023 1868/CD 14/03/2023 1 15 AUGMENTATION OF BAKSIRHAT PIPED WATER SUPPLY SCHEME (SM/10050) 15 15
154 Coochbehar Division UDAY CHAKI Execution of different works related to DAKSHIN BAJHEJAMA PWSS under JAL JEEVAN MISSION 000098ORD/000799/2022-202 ORD/000799/2022-2023 1872/CD 14/03/2023 1 1.17 Augmentation of Dakshin Bajejama Water Supply Scheme. (SM/09807) 1.17 1.17
155 Coochbehar Division MATRI ENTERPRISEES Execution of different works related to AUG. of HARINCHAOWRA PWSS under JAL JEEVAN MISSION 000098ORD/000815/2022-202 ORD/000815/2022-2023 1997 28/03/2023 1 58.04 AUGUMENTATION OF GROUND WATER BASED HARINCHAOWRA PWSS COOCHBEHAR 1 BLOCK WITHIN COOCHBEHAR DISTRICT UNDER COOCHBEHAR DIVISION, PHE DTE (SM/15933) 58.04 58.04
156 Coochbehar Division SWAPAN KR.SARKAR Training for improvement of Skillness of Pump Operator & Valve Operator of different PWSS of Cooch Behar-II Block held at khagrabari under Cooch Behar Division, PHED. 000098ORD/000835/2022-202 ORD/000835/2022-2023 1617/CD/B 03/02/2023 1 0.4 AUGMENTATION OF KHAGRABARI PIPED WATER SUPPLY SCHEME. (SM/13403) 0.4 0.4
Total 174 6,819 # 6,821.7 6,798.96