SL No Division Agency Work Name Unique Order No System Order No Order Memo No Order Date No of Bills Bill Amount Scheme Requisition Amount Allotment Amount
32 61 1,35,748.36 # 1,091.95 1,091.95
1 Bankura Division RMN INFRASTRUCTURES LIMITED Implementation of MINI PIPED WATER SUPPLY SCHEME in 431( Four Hundred Thirty One ) no. villages under different blocks having less than 100 households under Bankura District in connection with Jal Swapna 000054 RMN/MPWSS/ 14/06/2024 30 1,35,142.67 MINI PIPED WATER SUPPLY SCHEME FOR KHATANGA VILLAGE HAVING HOUSEHOLD LESS THAN 100 UNDER RAIPUR BLOCK UNDER JAL SAPNA/ JJM PROGRAMME. (SM/13270) 486.26 486.26
2 Bankura Division SWAPAN KUMAR BIT Retrofitting works for creation of FHTC (Funtional House Hold Tap Connection in connection with Jal Jeevan Mission (JJM) and JAL SWAPNA of INDAS W/S Scheme under Bishnupur Sub - Division of Bankura Division, PHE Dte. Block - Indas, Name of OHR - Mirz 000054ORD/000009/2020-202 ORD/000009/2020-2021 610/BQA 10/02/2021 1 3.58 Retrofitting works for creation of 'FHTC (Funtional House Hold Tap Connection' in connection with Jal Jeevan Mission (JJM) and JAL SWAPNA of INDAS W/S Scheme (Part-A) (SM/07272) 3.58 3.58
3 Bankura Division M/S TARUN KUMAR PATRA Construction and commissioning of ¿FHTC (Functional House Hold Tap Connection)¿ in Lakshmipal (158), Dhanghari (159), Puipal (160), Khamardanga (161), Kustara (162), Khaergaria (163), Suknokhali (164), Sushinia (165), Hatibari (166), Raybandh (167) & Dubr 000054ORD/000045/2022-202 ORD/000045/2022-2023 1648/BQA 25/07/2022 1 123.04 Construction and commissioning of FHTC (Functional House Hold Tap Connection) in Lakshmipal (158), Dhanghari (159), Puipal (160), Khamardanga (161), Kustara (162), Khaergaria (163), Suknokhali (164), Sushinia (165), Hatibari (166), Raybandh (167) & Dubraj (SM/09553) 123.04 123.04
4 Bankura Division DEBAKI RANJAN SARKAR Construction & Commissioning of 400 m3 capacity 20 Mtr. staging height RCC Over Head Reservoir (Ref. of Drg.no.-PC-I/OHR/11/2012(Rev-01){Sheet-1/2 &2/2} of SE,PC-I,PHE Dte.) staging height 20 mtr. with Laying Distribution System as per LDS drawing, includ 000054ORD/000050/2023-202 ORD/000050/2023-2024 899/BQA 20/04/2023 1 35.63 AUGMENTATION OF GROUND WATER BASE PIPE WATER SUPPLY SCHEME FOR PATRASAYER TO ACCOMMODATE FHTC UNDER JALSAPNO MISSION UNDER PATESAYER BLOCK IN BANKURA DISTRICT UNDER BANKURA DIVISION P.H.E.DTE. (SM/09926) 35.63 35.63
5 Bankura Division PARTHA PRATIM CHHATAIT Laying HDPE pipeline to increase pressure in Labdapara (265) & Birkham (266) Mouzas for construction and commissioning of ¿FHTC (Functional House Hold Tap Connection)¿ by retrofitting Zone-IIB (Hetiasol) of Khatra-Hirbandh-Ranibandh Water Supply Scheme (B 000054ORD/000066/2022-202 ORD/000066/2022-2023 1690/BQA 27/07/2022 1 5.18 Construction and commissioning of FHTC (Functional House Hold Tap Connection) in Madhabpur (252), Labda Para (265), Birkham (266), Jharia (267), Dakai (268), Karra (269), Kapila (270) & Hetiasol (271) mouzas by retrofitting Zone-IIB (Hetiasol) of Khatra-H (SM/07355) 5.18 5.18
6 Bankura Division MAKALI CONSTRUCTION Work Order for Laying extra UPVC pipeline to cover Handulia (1) & Metyaldoba (2) mouzas for construction and commissioning of ¿FHTC (Functional House Hold Tap Connection)¿ by retrofitting of Water Supply Scheme for Parsola, Zone-B and its adjoining Mouzas 000054ORD/000078/2022-202 ORD/000078/2022-2023 1299/BQA 15/06/2022 1 1.01 Construction and commissioning of FHTC (Functional House Hold Tap Connection) in Handulia (1), Metyaldoba (2), Lakhyatapal (3), Budhadhara (4), Kharkhari (6), Kharjuria (7), Peripathar (8) & Ramgar (33) mouzas by retrofitting of Water Supply Scheme for Pa (SM/09476) 1.01 1.01
7 Bankura Division MUNMUN UPADHYAY Construction and commissioning of ¿FHTC (Functional House Hold Tap Connection)¿ in Patpur (214), Maharadihi (215), Dharampur (216), Baragari (220), Datarampur (221), Pithabaid (222), Radhanathpur (259) & Saluka (260) mouzas by retrofitting Zone-IIA (Barag 000054ORD/000084/2021-202 ORD/000084/2021-2022 2502/BQA 23/09/2021 1 12.01 Construction and commissioning of FHTC (Functional House Hold Tap Connection) in Patpur (214), Maharadihi (215), Dharampur (216), Bara Gari (220), Data Rampur (221), Pitha Baid (222), Radhanathpur (259) & Saluka (260) mouzas by retrofitting Zone-IIA (Bara (SM/07265) 12.01 12.01
8 Bankura Division PRADIP CHAKRABORTY Construction and commissioning of ¿FHTC (Functional House Hold Tap Connection)¿ in Sitarampur (59) mouza by retrofitting Zone-A (Bhuakana) of Khatra-Hirbandh-Ranibandh Water Supply Scheme (BRGF Ph-I) at Block- Hirbandh, Dist.- Bankura under Jal Swapna & J 000054ORD/000105/2020-202 ORD/000105/2020-2021 163/BQA 18/01/2021 1 0.08 Construction and commissioning of FHTC (Functional House Hold Tap Connection) in Golakpur (50), Bhutardihi (51), Manora (52), Bijardihi (57), Chaka Doba (58), Sitarampur (59), Bhuchu Dungri (61), Madhupur (62), Bhuakana (63), Belkanlia (67) & Bauridihi (6 (SM/07364) 0.08 0.08
9 Bankura Division GANESH ROY Construction and commissioning of ¿FHTC (Functional House Hold Tap Connection)¿ in Bamni (42) mouzas by retrofitting Zone-C (Biradihi) of Khatra-Hirbandh-Ranibandh Water Supply Scheme (BRGF Ph-I) at Block- Hirbandh, Dist.- Bankura under Jal Swapna & Jal J 000054ORD/000114/2020-202 ORD/000114/2020-2021 172/BQA 18/02/2021 1 2.53 Construction and commissioning of FHTC (Functional House Hold Tap Connection) in Biradihi (39), Diktor (40) & Bamni (42) mouzas by retrofitting Zone-C (Biradihi) of Khatra-Hirbandh-Ranibandh Water Supply Scheme (BRGF Ph-I) at Block- Hirbandh, Dist.- Banku (SM/07336) 2.53 2.53
10 Bankura Division GOUTAM BHOWMIK Retrofitting works for creation of FHTC (Funtional House Hold Tap Connection) in connection with Jal Jeevan Mission (JJM) and JAL SWAPNA of Prakash Zone - B W/S Scheme (BRGF ph - I project) under Bishnupur Sub - Division of Bankura Division, PHE Dte. B 000054ORD/000137/2021-202 ORD/000137/2021-2022 2806/BQA 11/11/2021 1 6.86 Construction & commissioning of FHTC by Retrofitting of completed and commissioned piped water supply scheme of Prakash Zone-B (BRGF Ph - I project) under JAL SWAPNO & Jal Jeevan Mission (JJM) for 03 nos. mouzas (Patlapur-33, Hingjuri-34 & Gumut-35) of PR (SM/08293) 6.86 6.86
11 Bankura Division GOPAL CHANDRA CHOWDHURY Laying fitting fixing of HDPE pipe from Kulbona Village to Tikhargram village to increase pressure of Retrofitting works for creation of 'FHTC (Functional House Hold Tap Connection' in connection with Jal Jeevan Mission (JJM) and JAL SWAPNA of BARJORA 000054ORD/000141/2022-202 ORD/000141/2022-2023 564/BSD 29/07/2022 1 0.53 Retrofitting works for creation of 'FHTC (Functional House Hold Tap Connection' in connection with Jal Jeevan Mission (JJM) and JAL SWAPNA for 06 nos. Mouzas (Chak Kulbana, Methyali, Nutangram, Pratappur, Sitarampur, Salgara) of BARJORA Water Supply Schem (SM/09330) 0.53 0.53
12 Bankura Division I.R.CONSTRUCTION Retrofitting works for creation of 'FHTC (Funtional House Hold Tap Connection)' in connection with Jal Jeevan Mission (JJM) and JAL SWAPNA of Chuamosina Zone - B W/S Scheme (BRGF ph - I project) under Bishnupur Sub - Division of Bankura Division, PHE D 000054ORD/000170/2021-202 ORD/000170/2021-2022 2845/BQA 16/11/2021 1 0.41 Construction & commissioning of FHTC by Retrofitting of completed and commissioned piped water supply scheme of Chuamosina Zone-B (BRGF Ph - I project) under JAL SWAPNO & Jal Jeevan Mission (JJM) for 09 nos. mouzas (Nangalbhanga-18, Chwak Chuamosina-19, B (SM/09308) 0.41 0.41
13 Bankura Division AJIT KUMAR PAUL Retrofitting works for creation of 'FHTC (Funtional House Hold Tap Connection)' in connection with Jal Jeevan Mission (JJM) and JAL SWAPNA of Betanal Zone - B W/S Scheme (BRGF ph - I project) under Bishnupur Sub - Division of Bankura Division, PHE Dte. 000054ORD/000172/2021-202 ORD/000172/2021-2022 2847/BQA 22/11/2021 1 5.5 Construction & commissioning of FHTC by Retrofitting of completed and commissioned piped water supply scheme of Betanal Zone-B (BRGF Ph - I project) under JAL SWAPNO & Jal Jeevan Mission (JJM) for 03 nos. mouzas (Kenjera-129, Chattrakhanda-130 & Nagatentu (SM/09332) 5.5 5.5
14 Bankura Division UNITED TRADERS Work Order for Repairing and laying of HDPE pipe for Distribution Main along with allied works from Pukhuria OHR site to Pukhuria School More [damage due to done during Strengthening - Widening of Khatra-Simlapal road by PWD (Roads) Dte.] of Water Supply 000054ORD/000181/2022-202 ORD/000181/2022-2023 1284/BQA 15/06/2022 1 4.94 Construction and commissioning of FHTC (Functional House Hold Tap Connection) in Kadamara (9), Pukhuria (10), Baranimdiha (13), Rengurbandh (14) & Rajabandh (15) mouzas by retrofitting of Water Supply Scheme for Parsola, Zone-B and its adjoining Mouzas un (SM/09640) 4.94 4.94
15 Bankura Division EARTH MOVING (INDIA) Work Order for Repairing and laying of HDPE pipe for Distribution Main along with allied works from Pukhuria OHR site to Pukhuria School More [damage due to done during Strengthening - Widening of Khatra-Simlapal road by PWD (Roads) Dte.] of Water Supply 000054ORD/000182/2022-202 ORD/000182/2022-2023 1286/BQA 15/06/2022 1 4.95 Construction and commissioning of FHTC (Functional House Hold Tap Connection) in Kadamara (9), Pukhuria (10), Baranimdiha (13), Rengurbandh (14) & Rajabandh (15) mouzas by retrofitting of Water Supply Scheme for Parsola, Zone-B and its adjoining Mouzas un (SM/09640) 4.95 4.95
16 Bankura Division UNITED TRADERS Work Order for Repairing and laying of HDPE pipe for Distribution Main along with allied works from Pukhuria OHR site to Pukhuria School More [damage due to done during Strengthening - Widening of Khatra-Simlapal road by PWD (Roads) Dte.] of Water Supply 000054ORD/000183/2022-202 ORD/000183/2022-2023 1288/BQA 15/06/2022 1 4.94 Construction and commissioning of FHTC (Functional House Hold Tap Connection) in Kadamara (9), Pukhuria (10), Baranimdiha (13), Rengurbandh (14) & Rajabandh (15) mouzas by retrofitting of Water Supply Scheme for Parsola, Zone-B and its adjoining Mouzas un (SM/09640) 4.94 4.94
17 Bankura Division EARTH MOVING (INDIA) Work Order for Repairing and laying of HDPE pipe for Distribution Main along with allied works from Pukhuria OHR site to Pukhuria School More [damage due to done during Strengthening - Widening of Khatra-Simlapal road by PWD (Roads) Dte.] of Water Supply 000054ORD/000185/2022-202 ORD/000185/2022-2023 1290/BQA 15/06/2022 1 3.13 Construction and commissioning of FHTC (Functional House Hold Tap Connection) in Kadamara (9), Pukhuria (10), Baranimdiha (13), Rengurbandh (14) & Rajabandh (15) mouzas by retrofitting of Water Supply Scheme for Parsola, Zone-B and its adjoining Mouzas un (SM/09640) 3.13 3.13
18 Bankura Division SUBHENDU SEKHAR GORAI Retrofitting works for creation of 'FHTC (Funtional House Hold Tap Connection)' in connection with Jal Jeevan Mission (JJM) and JAL SWAPNA of Chakuporsol Zone- A W/S Scheme (BRGF ph - I project) under Bishnupur Sub - Division of Bankura Division, PHE Dt 000054ORD/000194/2021-202 ORD/000194/2021-2022 3028/BQA 29/11/2021 1 24.2 Construction & commissioning of FHTC by Retrofitting of completed and commissioned piped water supply scheme of Chakuparsole Zone-A (BRGF Ph - I project) under JAL SWAPNO & Jal Jeevan Mission (JJM) for 02 nos. mouzas (Chotobankadaha-148 & Bandrya-150) of (SM/09619) 24.2 24.2
19 Bankura Division M/S K.B.CONSTRUCTION Retrofitting works for creation of 'FHTC (Funtional House Hold Tap Connection' in connection with Jal Jeevan Mission (JJM) and JAL SWAPNA of INDAS W/S Scheme under Bishnupur Sub - Division of Bankura Division, PHE Dte. Block - Indas, Name of OHR - M 000054ORD/000213/2021-202 ORD/000213/2021-2022 3049/BQA 01/12/2021 1 15.13 Retrofitting works for creation of 'FHTC (Funtional House Hold Tap Connection' in connection with Jal Jeevan Mission (JJM) and JAL SWAPNA of INDAS W/S Scheme (Part-C) (SM/07371) 15.13 15.13
20 Bankura Division M/S D.K.H CONSTRUCTION Retrofitting works for creacion of 'FHTC (Functional House Hold Tap Connection' in connection with Jal Jeevan Misson (JJM) and JAL SWAPNA of JAMTORA (Zone - G) under Saltora- Chhatna Block W/S Scheme (BRGF ph - I project) under Bankura Sadar Sub - Div 000054ORD/000249/2021-202 ORD/000249/2021-2022 3362/BQA 31/12/2021 1 92.53 Retrofitting works for creation of 'FHTC (Functional House Hold Tap Connection' in connection with Jal Jeevan Mission (JJM) and JAL SWAPNA for 22 nos. mouzas (Alutia, Chholagasa, Satkhulia, Tilajuri, Aljharia, Dhengagora, Bagmara, Katharia, Bijpur, Siulib (SM/09499) 92.53 92.53
21 Bankura Division NAYAN BARDHAN HDPE pipe Bypass line to increase pressure from Pakhnna Head work site to Tajpur village retrofitting works for creation of 'FHTC (Functional House Hold Tap Connection' in connection with Jal Jeevan Mission (JJM) and JAL SWAPNA of Pakhnna & its adjoinin 000054ORD/000266/2022-202 ORD/000266/2022-2023 2323/BQA 08/12/2022 1 24.83 Retrofitting works for creation of 'FHTC (Functional House Hold Tap Connection' in connection with Jal Jeevan Mission (JJM) and JAL SWAPNA for 09 nos. Mouzas (Pakhnna, Kamalpur, Tajpur, Pakhanna Bharabpur, Gopalpur, Radhakantapur, Pakhanna Pratap pur, P (SM/09328) 24.83 24.83
22 Bankura Division JAI BHARAT COMMERCIAL CORPORAT Augmentation works for Aguri Band Punisol & its adjoining Mouzas Water Supply Scheme (Zone - A) under Onda Block (BRGF Phase - I Project). 000054ORD/000289/2023-202 ORD/000289/2023-2024 1910/BQA 13/07/2023 1 16.15 Augmentation works for Aguri Band Punisol & its adjoining Mouzas Water Supply Scheme (Zone- A) under Onda Block (BRGF Ph - I Project). (SM/17708) 16.15 16.15
23 Bankura Division GANESH ROY Retrofitting works for creation of 'FHTC (Functional House Hold Tap Connection' in connection with Jal Jeevan Mission (JJM) and JAL SWAPNA of HORIALGORA (Zone -O) under Bankura - I,II & Barjora Block W/S Scheme (BRGF ph. - I project) under Bankura Sadar 000054ORD/000337/2022-202 ORD/000337/2022-2023 606/BSD 16/08/2022 1 3.07 Construction & commissioning of FHTC by Retrofitting of completed and commissioned piped water supply scheme of Bankura - I, II & Barjora Block (BRGF Ph - I project) under JAL SWAPNO & Jal Jeevan Mission (JJM) for 06 nos mousas (Tantkanali, Harialgora, Sa (SM/09320) 3.07 3.07
24 Bankura Division CHAKRABORTY MINING & ENGINEERI Acceptance cum Formal work order for the work of Providing Man power engagement and Driver for construction RBTW in connection to Onda rejuvenation work in Chapra Ghat pump house and OHR site by rig unit KLR at BMSD (D) under BMD PHE Dte. (S.L:01) 000054ORD/000344/2022-202 ORD/000344/2022-2023 88/BMSD(D) 02/02/2023 1 0.96 Rejuvenation of Sub-Surface Water Based Water Supply Scheme for Onda (SM/06187) 0.96 0.96
25 Bankura Division M/S SWAPAN BANERJEE Acceptance cum Formal work order for the work of Supply and delivery of pea size gravels at Bankura Store/Onda drilling site (Chapra Ghat P/H and OHR site) in connection to Onda Rejuvenation Programme for construction of RBTW at BMSD(D) under BMD PHE Dte. 000054ORD/000372/2022-202 ORD/000372/2022-2023 57/BMSD(D) 19/01/2023 1 0.92 Rejuvenation of Sub-Surface Water Based Water Supply Scheme for Onda (SM/06187) 0.92 0.92
26 Bankura Division DEBAKI RANJAN SARKAR SUPPLY, DELIVERY, CONSTRUCTION, COMMISSIONING AND COMPLETION OF ALL CIVIL WORKS INCLUDING ALL ALLIED, RELATED AND ENABLING WORKS FOR BHAT PUSHKARANI PIPED WATER SUPPLY SCHEME, BLOCK- SONAMUKHI, DIST- BANKURA UNDER JJM INCLUDING TRIAL RUN FOR 3 MONTHS AND 000054ORD/000373/2023-202 ORD/000373/2023-2024 2035/BQA 24/07/2023 1 125.76 Bhat Pushkarini Piped Water Supply Scheme (SM/12416) 125.76 125.76
27 Bankura Division M/S TARUN KUMAR PATRA Retrofitting works for creation of 'FHTC (Funtional House Hold Tap Connection' in connection with Jal Jeevan Mission (JJM) and JAL SWAPNA of Kushmuri Zone-B W/S Scheme (BRGF ph - I project) under Bishnupur Sub - Division of Bankura Division, PHE Dte. B 000054ORD/000394/2021-202 ORD/000394/2021-2022 205/BQA 01/02/2022 1 74.18 Construction & commissioning of FHTC by Retrofitting of completed and commissioned piped water supply scheme of Kushmuri Zone-B (BRGF Ph - I project) under JAL SWAPNO & Jal Jeevan Mission (JJM) for 10 nos. mouzas (Jinkara-19, Srirampur-20, Pratapmath-21, (SM/09625) 74.18 74.18
28 Bankura Division ASHOKE KUMAR DEY Supplying laying fitting fixing of HDPE pipe line connection from Hindur danga village Main road to Baguli ,Lohara boni & Molboni village ( under Baguli Mouza ) for Retrofitting works for creation of 'FHTC (Funtional House Hold Tap Connection' in c 000054ORD/000464/2022-202 ORD/000464/2022-2023 620/BSD 16/08/2022 1 1.97 Construction & commissioning of Retrofitting works for creation of 'FHTC (Funtional House Hold Tap Connection' in connection with Jal Jeevan Mission (JJM) and JAL SWAPNA for 03 Nos. Mouzas (Kuldiha , Napra, Bagulia) of MALIARA (Zone - A) under Bankur (SM/09304) 1.97 1.97
29 Bankura Division LABIR MIRSHAD KHAN Retrofitting works for creacion of 'FHTC (Functional House Hold Tap Connection' in connection with Jal Jeevan Misson (JJM) and JAL SWAPNA of DHABAN (Zone - A) under Saltora- Chhatna Block W/S Scheme (BRGF ph - I project) under Bankura Sadar Sub - Divi 000054ORD/000497/2020-202 ORD/000497/2020-2021 161/ BSD 18/02/2021 1 4.03 Construction & commissioning of Retrofittings works for creation of 'FHTC (Functional House Hold Tap Connection' in connection with Jal Jeevan Mission (JJM) and JAL SWAPNA for 06 Nos. Mouzas (Kumirdoha, Gairabad, Fulberia, Dhaban, Bhabanipur, Upargara) (SM/09306) 4.03 4.03
30 Bankura Division ASOKE BHATTACHARYYA Augmentation of CHATURDIHI (Zone - U) under Bankura - I,II & Barjora Block W/S Scheme (BRGF ph - I project) under Bankura Sadar Sub - Division of Bankura Division, PHE Dte. No. of House Hold :- 100 000054ORD/000749/2023-202 ORD/000749/2023-2024 2781/BQA 09/10/2023 1 4.03 Augmentation works for CHATURDIHI (Zone- U) under Bankura - I, II & Barjora Block Water Supply Scheme (BRGF Ph - I Project). (SM/16971) 4.03 4.03
31 Bankura Division CLIFFORD FACILITY SERVICES PVT Continuation Work order for providing services for operation of 10 (ten) nos Laboratory w.e.f.01.05.2023 to 31.05.2023 under Bankura Division, P.H.E.Dte. 000054ORD/000775/2023-202 ORD/000775/2023-2024 1526/BQA 16/06/2023 1 1.1 Operational charges of PHED & NGO Managed Laboratories Related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission (SM/17128) 1.1 1.1
32 Bankura Division TARINI CHARAN UPADHYAY Laying extra HDPE pipe line to cover Fengabasa & Amlatora mouzas for construction and commissioning of ' 'FHTC (Functional House Hold Tap Connection' in connection with Jal Jeevan Mission (JJM) and JAL SWAPNA of Andharthol (Zone- V) OHR under Bankura - I 000054ORD/000797/2021-202 ORD/000797/2021-2022 824/BSD 06/08/2021 1 2.51 Construction & commissioning of FHTC by Retrofitting of completed and commissioned piped water supply scheme of Bankura - I, II & Barjora Block (BRGF Ph - I project) under JAL SWAPNO & Jal Jeevan Mission (JJM) for 09 nos mousas (Chhendua, Chamkara, Fengab (SM/07343) 2.51 2.51
Total 61 1,35,748.36 # 1,091.95 1,091.95