F4- Undisbursed Fund

Rs. in Lakh
SL No Division Agency Work Name Unique Order No System Order No Order Memo No Order Date No of Bills Bill Amount Scheme Requisition Amount Allotment Amount
131 155 9,030.09 # 8,441.41 8,441.41
1 Barasat Division H.I.ENTERPRISE. Enhancement of GST for providing Functional Household Tap Connection (FHTC) in connection with JJM and Jal Swapna Programme within command area of Khosdelpur WS Scheme 000009 974-1049/W 16/06/2023 16 126.72 Augmentation of Ground water based piped water supply scheme for Khasdelpur to accommodate FHTC (SM/10570) 126.72 126.72
2 Barasat Division SRIJAN ECOLOGICAL UPLIFTMENT P Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection(FHTC) for Augmentation of Shimulpur water supply scheme under Bongaon Sub-Division, P.H.E Dte. 000009ORD/000006/2023-202 ORD/000006/2023-2024 1126/BD 11/04/2023 1 30.9 Augmentation of Ground Water Based Piped Water Supply Scheme for Shimulpur to accommodate FHTC (SM/11598) 30.9 30.9
3 Barasat Division ALOK ENTERPRSE. (A UNIT OF SAK Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Dakshin Chatra Zone-I water supply scheme in Baduria Block under Barasat Division, P.H.E Dte. 000009ORD/000023/2023-202 ORD/000023/2023-2024 1210/BD 20/04/2023 1 118.78 Augmentation of ground water based piped water supply scheme for Dakshin Chatra Zone-I to accommodate FHTC (SM/12568) 118.78 118.78
4 Barasat Division PRITAM MUKHOPADHYAY. Acceptance cum work order for 2 nos. pump connection at PH No.-1 & 2 in connection with Augmentation for Bouthakurani water supply scheme (Z-II) , Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. 000009ORD/000023/2024-202 ORD/000023/2024-2025 630/HSD 12/06/2024 1 1 Augmentation of Ground Water Based Piped Water Supply Scheme For Bouthakurani to Accommodate FHTC. (SM/11536) 1 1
5 Barasat Division J.D.J.ENTERPRISE. (TRADERS PVT Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Arsula water supply scheme in Baduria Block under Barasat Division, P.H.E Dte. 000009ORD/000024/2023-202 ORD/000024/2023-2024 1217/BD 20/04/2023 1 88.71 Augmentation of ground water based piped water supply scheme for Arsula to accommodate FHTC (SM/11700) 88.71 88.71
6 Barasat Division PRITAM MUKHOPADHYAY. Acceptance cum work order for 2 nos. pump connection at PH No.-3 & 4 in connection with Augmentation for Bouthakurani water supply scheme (Z-I) , Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. 000009ORD/000024/2024-202 ORD/000024/2024-2025 631/HSD 12/06/2024 1 1.01 Augmentation of Ground Water Based Piped Water Supply Scheme For Bouthakurani to Accommodate FHTC. (SM/11536) 1.01 1.01
7 Barasat Division KINGS & CO. Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line & providing Functional Household Tap Connection with other allied works for Augmentation of Sandeshkhali water supply scheme, Sandeshkhali-II Block under Hasnabad Sub-Divis 000009ORD/000029/2023-202 ORD/000029/2023-2024 1300/BD 26/04/2023 1 26.02 Augmentation of ground water based piped water supply scheme for Sandeshkhali (SM/14152) 26.02 26.02
8 Barasat Division J.D.J.ENTERPRISE. (TRADERS PVT Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Gokna Zone-II water supply scheme in Baduria Block under Barasat Division, P.H.E Dte. 000009ORD/000030/2023-202 ORD/000030/2023-2024 1301/BD 26/04/2023 1 161.23 Augmentation of ground water based piped water supply scheme for Gokna to accommodate FHTC (SM/13405) 161.23 161.23
9 Barasat Division EFFLUENT & WATERTREATMENT ENGI Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line and providing Functional Household Tap Connection in connection with Augmentation of Sahebkhali water supply scheme (Zone-I), Hingalganj Block under Hasnabad Sub-Division, PH 000009ORD/000031/2023-202 ORD/000031/2023-2024 1304/BD 26/04/2023 1 48.3 Augmentation of ground water based piped water supply scheme for Sahebkhali to accommodate FHTC (SM/12278) 48.3 48.3
10 Barasat Division JAL PRAVAHIKA PVT. LTD. Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Aturia Zone-II water supply scheme in Baduria Block under Barasat Division, P.H.E Dte. 000009ORD/000032/2023-202 ORD/000032/2023-2024 1305/BD 26/04/2023 1 38.18 Augmentation of ground water based piped water supply scheme for Aturia to accommodate FHTC (SM/13040) 38.18 38.18
11 Barasat Division MAHAVIR PUMPS MANUFACTURING PV Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Bithari Zone-I water supply scheme in Swarupnagar Block of North 24 Parganas District under Barasat Division, P.H.E Dte. 000009ORD/000035/2023-202 ORD/000035/2023-2024 1357/BD 04/05/2023 1 97.37 Augmentation of ground water based piped water supply scheme for Bithari Zone-I to accommodate FHTC (SM/13737) 97.37 97.37
12 Barasat Division R.K.MANDAL & CO. Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line,Providing Functional Household Tap Connection, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah/Bamboo pile at different places, Construction of 000009ORD/000039/2023-202 ORD/000039/2023-2024 1439/BD 11/05/2023 1 10.59 Chutkia Radhanagar Piped Water Supply Scheme (SM/13524) 10.59 10.59
13 Barasat Division UMWELT ENGINEER PVT.LTD. Formal work order for Additional laying of distribution Pipe line and Providing Functional Household Tap Connection for the left out portion in connection with Augmentation of Kalitala water supply scheme (Z-II), under Surface Water Based Piped Water Sup 000009ORD/000076/2024-202 ORD/000076/2024-2025 1716/BD 26/06/2024 1 104.24 Surface Water Based Piped Water Supply Scheme for Hasnabad (SM/06472) 104.24 104.24
14 Barasat Division ROY CHOWDHURY CONSTRUCTION. Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) to the uncovered household as well as convert the mouzas into Swajal Gram including laying of UPVC pipe and Tube well connection under Augmentation work at Ghatpatila W/S S 000009ORD/000078/2024-202 ORD/000078/2024-2025 1770/BD 01/07/2024 1 7.37 Augmentation of ground water based piped water supply scheme for Ghatpatila (Zone-I) to accommodate FHTC (SM/11540) 7.37 7.37
15 Barasat Division MONDAL & CO. (BASIRHAT). Formal work order for Additional Laying of DI/UPVC distribution pipe line and Providing Functional Household Tap Connection for the left out portion in connection with Augmentation of Baruhat Patlikhanpur water supply scheme (Z-I), Hasnabad Block of Has 000009ORD/000097/2024-202 ORD/000097/2024-2025 1735/BD 27/06/2024 1 69.79 Augmentation of Ground Water Based Piped Water Supply Scheme for Barunhat Patlikhanpur to accommodate FHTC. (SM/11987) 69.79 69.79
16 Barasat Division KINGS & CO. Formal work order for Additional Laying of UPVC distribution pipe line and Providing Functional Household Tap Connection for the leftout portion in connection with Augmentation of Kanaikathi Kathalberia water supply scheme (Z-II), Hingalganj Block under 000009ORD/000098/2024-202 ORD/000098/2024-2025 1717/BD 26/06/2024 1 41.13 Augmentation of ground water based piped water supply scheme for Kanaikati kathalberia Zone-II to accommodate FHTC (SM/11657) 41.13 41.13
17 Barasat Division ROY CHOWDHURY CONSTRUCTION. Formal work order for Construction of 200 cum capacity CWR with pipe connection, Construction of Boundary wall, Approach Road, Earth Filling, Construction of 5.40 mtr. X 3.60 mtr. size Switch Room with sanitary and water supply arrangement and Laying of 000009ORD/000109/2024-202 ORD/000109/2024-2025 2222/BD 07/08/2024 1 23.3 Augmentation of Ground Water Based Piped Water Supply Scheme for Diara to accommodate FHTC (SM/11668) 23.3 23.3
18 Barasat Division R.K.MANDAL & CO. Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line, Providing Functional Household Tap Connection, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah/Bamboo pile at different places, Construction of 000009ORD/000115/2023-202 ORD/000115/2023-2024 1690/BD 07/06/2023 1 9.98 Bachhra piped Water supply scheme (SM/12712) 9.98 9.98
19 Barasat Division M/S B.K.ENTERPRISE. Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line, Providing Functional Household Tap Connection, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah/Bamboo pile at different places, Construction of 000009ORD/000117/2023-202 ORD/000117/2023-2024 1691/BD 07/06/2023 1 62.52 Phulbari Abad Piped Water Supply Scheme. (SM/12717) 62.52 62.52
20 Barasat Division SRI KRISHNA CO-OP-LABOUR CONTR Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line, Providing Functional Household Tap Connection, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah/Bamboo pile at different places, Construction of 000009ORD/000122/2023-202 ORD/000122/2023-2024 1682/BD 07/06/2023 1 51.63 Tapla Kusangra Piped Water Supply Scheme. (SM/12720) 51.63 51.63
21 Barasat Division SRI KRISHNA CO-OP-LABOUR CONTR Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line, Providing Functional Household Tap Connection, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah/Bamboo pile at different places, Construction of 000009ORD/000137/2023-202 ORD/000137/2023-2024 1703/BD 08/06/2023 1 31.72 Debitala Piped Water Supply Scheme (SM/13523) 31.72 31.72
22 Barasat Division POWER TOOLS & ENGINEERING Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line, Providing Functional Household Tap Connection, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah/Bamboo pile at different places, Construction of 000009ORD/000140/2023-202 ORD/000140/2023-2024 1714/BD 08/06/2023 1 55.19 Hatbhanga Piped Water Supply Scheme (SM/13525) 55.19 55.19
23 Barasat Division DIAMOND ENGINEER'S CO-OP. SOCI Formal work order for Construction of 300 cum capacity 20 mtr. height R.C.C. Over Head Reservoir as per Deptt. design, drawing & specification including bored pile & pile cap, laying of DI rising main & distribution pipe line by DI/UPVC and Providing FHTC 000009ORD/000148/2023-202 ORD/000148/2023-2024 1713/BD 08/06/2023 1 25.2 Augmentation of Ground Water Based Piped Water Supply Scheme for SHIBALAYA to accommodate FHTC. (SM/13472) 25.2 25.2
24 Barasat Division DIAMOND ENGINEER'S CO-OP. SOCI Formal work order for Construction of 350 cum capacity 20 mtr. height R.C.C. Over Head Reservoir as per Deptt. design, drawing & specification including bored pile & pile cap, laying of DI rising main & distribution pipe line by DI/UPVC and Providing FHTC 000009ORD/000149/2023-202 ORD/000149/2023-2024 1712/BD 08/06/2023 1 23.44 Augmentation of Ground water based Nebadhai Duttapukur Zone-I PWSS to Accommodate FHTC. (SM/13471) 23.44 23.44
25 Barasat Division R.K.MANDAL & CO. Formal work order for Construction of 300 cum capacity 20 mtr. staging height R.C.C. Over Head water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap for Augmentaion of Monipur water supply scheme, Sandeshkha 000009ORD/000154/2023-202 ORD/000154/2023-2024 1721/BD 08/06/2023 1 45.31 Augmentation of Ground Water Based Piped Water Supply Scheme for Monipur to accommodate FHTC (SM/11632) 45.31 45.31
26 Barasat Division CHAKRABORTTI ENTERPRISE. Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Bithari Z-II B water supply scheme in Swarupnagar Block under Barasat Division, P.H.E Dte. 000009ORD/000163/2023-202 ORD/000163/2023-2024 1719/BD 08/06/2023 1 79.01 Augmentation of ground water based piped water supply scheme for Bithari Zone-II to accommodate FHTC (SM/12895) 79.01 79.01
27 Barasat Division MADE & TRADE CO. Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Baro Bankra water supply scheme in Swarupnagar Block under Barasat Division, P.H.E Dte. 000009ORD/000164/2023-202 ORD/000164/2023-2024 1720/BD 08/06/2023 1 50.15 Augmentation of ground water based piped water supply scheme for Bara Bankra to accommodate FHTC (SM/11704) 50.15 50.15
28 Barasat Division SRIJAN ECOLOGICAL UPLIFTMENT P Formal work order for Balance Work for laying of distribution system with UPVC pipe (class-III) at mouja Jayanpur (J.L No-04) of Zone-XXX, Providing FHTC(Part-A & Part-B) and other allied works within Barrackpore-I Block of ¿Surface Water based Water Sup 000009ORD/000175/2023-202 ORD/000175/2023-2024 1727/BD 08/06/2023 1 263.72 Surface Water Based Water Supply Scheme for Arsenic Affected Areas of Habra-Gaighata & Adjoining Mouzas (SM/04457) 263.72 263.72
29 Barasat Division RANJIT KUMAR MANDAL Work order for Supply of Mechanized boat on hire basis with providing driver, helper and other requirement as perterms condition and specification as per direction of the EIC under Hasnabad Sub-Division, P.H.E. Dte. Period :01.05.24 to 31.08.24. 000009ORD/000181/2024-202 ORD/000181/2024-2025 525/HSD 30/04/2024 1 4.46 Surface Water Based Piped Water Supply Scheme for Hasnabad (SM/06472) 4.46 4.46
30 Barasat Division SRI KRISHNA CO-OP-LABOUR CONTR Formal work order for Construction of switch room cum chlorine room with sanitary & water supply arrangement i/c plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No-2, 3 & 4 (Size-3.60x3.00 mtr.), Laying of DI rising main and DI/UPVC distribution 000009ORD/000191/2023-202 ORD/000191/2023-2024 1729/BD 08/06/2023 1 63.13 Katakhali Piped Water Supply Scheme (SM/15826) 63.13 63.13
31 Barasat Division M/S NIRMAN CONSTRUCTION. Formal work order for Construction of 300 Cum capacity 20 mtr staging height R.C.C Over Head water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap for Augmentation of Kalitala (Zone-II) water supply scheme, 000009ORD/000218/2023-202 ORD/000218/2023-2024 1733/BD 08/06/2023 1 54.42 Augmentation of ground water based piped water supply scheme for Kalitala and adjoining mouzas (SM/14153) 54.42 54.42
32 Barasat Division IMAGIN Arrangement of Block Level Orientation Programe involving stakeholders of PRI bodies including refreshments, training materials and related activities for 2 nos Blocks (Barasat-I & II) in North 24 Parganas under Barasat Division, P.H.E. Dte. 000009ORD/000246/2024-202 ORD/000246/2024-2025 171/BSD 10/06/2024 1 0.98 Augmentation of Ground Water Based Piped Water Supply Scheme for SHIBALAYA to accommodate FHTC. (SM/13472) 0.98 0.98
33 Barasat Division IMAGIN Arrangement of Block Level Orientation Programe involving stakeholders of PRI bodies including refreshments, training materials and related activities for 2 nos Blocks (Amdanga & Deganga) in North 24 Parganas under Barasat Division, P.H.E. Dte. 000009ORD/000247/2024-202 ORD/000247/2024-2025 172/BSD 10/06/2024 1 0.98 Augmentation of Berachampa Zone-2 Piped Water Supply Scheme (SM/13893) 0.98 0.98
34 Barasat Division IMAGIN Arrangement of Block Level Orientation Programe involving stakeholders of PRI bodies including refreshments, training materials and related activities for 1 no Blocks (Rajarhat) in North 24 Parganas under Barasat Division, P.H.E. Dte. 000009ORD/000248/2024-202 ORD/000248/2024-2025 173/BSD 10/06/2024 1 0.49 Improvement of Humaipur Piped Water Supply Scheme (SM/05811) 0.49 0.49
35 Barasat Division NOVELTY ENTERPRISE Formal work order for Construction of OHR (1600 cum capacity), Guard Room, Chlorine Room, Boundary Wall, Internal Road, Laying of distribution system including allied works of head works at mouza Keutia (J.L. No.- 09) of Zone-XXXI within Barrackpore-I Blo 000009ORD/000293/2023-202 ORD/000293/2023-2024 2319/BD 07/08/2023 1 62.18 Surface Water Based Water Supply Scheme for Arsenic Affected Areas of Habra-Gaighata & Adjoining Mouzas (SM/04457) 62.18 62.18
36 Barasat Division M/S NIRMAN CONSTRUCTION. Acceptance cum work order for Temporary approach road for movement of winch machine and other allied machineries at Head Work site within Jhikra W/S scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. 000009ORD/000309/2024-202 ORD/000309/2024-2025 879/HSD 07/08/2024 1 0.75 Jhikra Piped Water Supply Scheme. (SM/12719) 0.75 0.75
37 Barasat Division UNIFIED ENGINEERS' CO-OPERATIV Acceptance cum work order for Construction of anchor block for resting of 100 mm dia DI pipeline at different places in connection with Augmentation of Rupmari w/s scheme (Z-II), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. 000009ORD/000310/2024-202 ORD/000310/2024-2025 881/HSD 07/08/2024 1 0.91 Augmentation of Ground Water Based Piped Water Supply Scheme for Rupmari to Accommodate FHTC. (SM/12122) 0.91 0.91
38 Barasat Division M/S SUKANTA ENTERPRISE. Acceptance cum work order for Sand bats consolidation work over sand filling trenches as a part of road restoration work due to laying of Secondary rising main along different PMGSY road maintained by WBSRDA, North 24 parganas in connection with Habra-Gai 000009ORD/000357/2024-202 ORD/000357/2024-2025 2408/BD 22/08/2024 1 5.95 Surface Water Based Water Supply Scheme for Arsenic Affected Areas of Habra-Gaighata & Adjoining Mouzas (SM/04457) 5.95 5.95
39 Barasat Division IMAGIN Arrangement of Block Level Orientation programe involving stakeholders of PRI bodies including refreshments, training materials and related activities for 2 nos. Blocks (Bagda & Swarupnagar) in North 24 Parganas Under Barasat Division, P.H.E Dte. 000009ORD/000375/2024-202 ORD/000375/2024-2025 697/Bon 10/06/2024 1 0.98 Surface Water Based PWSS for Arsenic Affected Areas of Bagda and Bongaon Blocks (Including Ranaghat-I, Ranaghat-II Blocks and Bongaon Municipality) (SM/06364) 0.98 0.98
40 Barasat Division IMAGIN Arrangement of Block Level Orientation programe involving stakeholders of PRI bodies including refreshments, training materials and related activities for 2 nos. Blocks (Gaighata & Bongaon) in North 24 Parganas under Barasat Division, P.H.E Dte. 000009ORD/000376/2024-202 ORD/000376/2024-2025 698/Bon 10/06/2024 1 0.98 Surface Water Based PWSS for Arsenic Affected Areas of Bagda and Bongaon Blocks (Including Ranaghat-I, Ranaghat-II Blocks and Bongaon Municipality) (SM/06364) 0.98 0.98
41 Barasat Division SWADESH MONDAL. Repair of damaged concrete road due to laying of pipe line in various place (node 711 to 718, 542 to 546, 552 to 554 ) of Gobindapur Dhokra pwss under Basirhat to Sub-Division within Barasat Division, PHE Dte. 000009ORD/000441/2024-202 ORD/000441/2024-2025 1165/BHTSD 30/07/2024 1 0.95 Augmentation of ground water based piped water supply scheme for Gobindapur Dhokra to accommodate FHTC (SM/11532) 0.95 0.95
42 Barasat Division PRASANTA KUMAR PAUL. Repair of damaged concrete road due to laying of pipe line in various place (node 549 to 551, 511 to 538, 575 to 579 ) of Gobindapur Dhokra pwss under Basirhat to Sub-Division within Barasat Division, PHE Dte. 000009ORD/000442/2024-202 ORD/000442/2024-2025 1166/BHTSD 30/07/2024 1 0.97 Augmentation of ground water based piped water supply scheme for Gobindapur Dhokra to accommodate FHTC (SM/11532) 0.97 0.97
43 Barasat Division M/S MAA TARA ENTERPRISE Repair of damaged concrete road due to laying of pipe line in various place (node 82 to 84, 84 to 86, 725 to 726, 545 to 549, 546 to 552 ) of Gobindapur Dhokra pwss under Basirhat to Sub-Division within Barasat Division, PHE Dte. 000009ORD/000443/2024-202 ORD/000443/2024-2025 1167/BHTSD 30/07/2024 1 0.99 Augmentation of ground water based piped water supply scheme for Gobindapur Dhokra to accommodate FHTC (SM/11532) 0.99 0.99
44 Barasat Division MD AMIRUL MOLLA. Repair of damaged concrete road due to laying of pipe line in various place (node 72 to 80 to 81, 73 to 74, 80 to 82, 538 to 539, 736 to 737 ) of Gobindapur Dhokra pwss under Basirhat to Sub-Division within Barasat Division, PHE Dte. 000009ORD/000444/2024-202 ORD/000444/2024-2025 1168/BHTSD 30/07/2024 1 0.98 Augmentation of ground water based piped water supply scheme for Gobindapur Dhokra to accommodate FHTC (SM/11532) 0.98 0.98
45 Barasat Division SELIM GAZI. Repair of OHR & Pump House and emergency repairing of pipeline in Gobindapur Dhokra W/S Scheme Under Basirhat Sub-Division P.H.E. Dte.Under Barasat Division, P.H.E.Dte. 000009ORD/000447/2024-202 ORD/000447/2024-2025 1170/BHTSD 30/07/2024 1 0.94 Augmentation of ground water based piped water supply scheme for Gobindapur Dhokra to accommodate FHTC (SM/11532) 0.94 0.94
46 Barasat Division S.MUKHERJEE. Construction of Culvert at Pump House - V of Chandrapur W/S Scheme under Barasat Sub. Division, PHE Dte. 000009ORD/000468/2024-202 ORD/000468/2024-2025 509/BSD 30/08/2024 1 0.81 Augmentation of Ground water based Chandrapur Piped Water Supply scheme to Accommodate FHTC (SM/14161) 0.81 0.81
47 Barasat Division M/S BISWAS BROTHERS. Formal work order for Construction of 550cum capacity 20Mtr staging Height R.C.C. Over Head Reservoir and laying of Rising main & distribution pipe line by DI & UPVC and providing FHTC for Augmentation of Swetpur Zone-I Water Supply Scheme under Barasat 000009ORD/000563/2023-202 ORD/000563/2023-2024 2382/BD 10/08/2023 1 15.16 Augmentation of Ground Water Based Swethpur Zone-I to Accommodate FHTC. (SM/18410) 15.16 15.16
48 Barasat Division H.I.ENTERPRISE. Formal work order for Construction of 450 cum capacity 20 Mtr. staging height RCC Over Head Reservoir and laying of Rising main & distribution pipe line by DI & UPVC and providing FHTC for augmentation of Berachampa Zone-III Water Supply Scheme under Bar 000009ORD/000565/2023-202 ORD/000565/2023-2024 2449/BD 16/08/2023 1 112.09 Augmentation of Berachampa Zone-3 Piped Water Supply Scheme (SM/13894) 112.09 112.09
49 Barasat Division M/S S.S.ENTERPRISE. (SOUTH) Acceptance cum work order for Construction of Indoor Type Sub-Station Building at Ashokenagar GLR Site for Surface based Water Supply Scheme for Arsenic affected areas of Habra-Gaighata and adjoining moujas in the district of North 24 Parganas under 000009ORD/000595/2022-202 ORD/000595/2022-2023 2671/BD 08/09/2022 1 35.83 Surface Water Based Water Supply Scheme for Arsenic Affected Areas of Habra-Gaighata & Adjoining Mouzas (SM/04457) 35.83 35.83
50 Barasat Division KINGS & CO. Formal work order for Laying of UPVC distribution pipe line and Providing FHTC (Functional Household Tap Connection) for Augmentation of Banglani Water Supply Scheme in Swarupnagar Block of North 24 Parganas District under Barasat Division, P.H.E. Dte. 000009ORD/000717/2023-202 ORD/000717/2023-2024 2518/BD 22/08/2023 1 33.81 Augmentation of ground water based piped water supply scheme for Banglani to accommodate FHTC (SM/18618) 33.81 33.81
51 Barasat Division KINGS & CO. Formal work order for "Laying of DI rising main, DI/UPVC distribution pipe line, Providing Functional Household Tap Connection & Construction of 400 cum capacity 20 mtr staging height R.C.C Over Head water Reservoir as per Department design, drawing & spe 000009ORD/000721/2023-202 ORD/000721/2023-2024 2577/BD 25/08/2023 1 173.69 NITYABARIA PIPED WATER SUPPLY SCHEME (SM/10182) 173.69 173.69
52 Barasat Division SRI KRISHNA CO-OP-LABOUR CONTR Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.-2 & 3 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Hing 000009ORD/000732/2023-202 ORD/000732/2023-2024 2480/BD 18/08/2023 1 38.28 Augmentation of Hingalganj Piped water supply scheme Zone-I (SM/14512) 38.28 38.28
53 Barasat Division ALOK ENTERPRSE. (A UNIT OF SAK Formal work order for Laying of DI/UPVC distribution pipe line and Providing FHTC (Functional Household Tap Connection ) for augmentation of Dhanyakuria water supply scheme in Basirhat-II block under Barasat Division, PHE Dte. 000009ORD/000745/2022-202 ORD/000745/2022-2023 3343/BD 16/11/2022 1 41.86 Augmentation of ground water based piped water supply scheme for Dhanyakuria to accommodate FHTC (SM/12274) 41.86 41.86
54 Barasat Division GARGO TRADERS Formal work order for Laying of DI / UPVC distribution pipe line and Providing FHTC (Functional Household Tap Connection) by Augmentation of Nalabara (Zone-I) Water Supply Scheme in Swarupnagar Block of North 24 Parganas District under Barasat Division, P 000009ORD/000776/2023-202 ORD/000776/2023-2024 2713/BD 05/09/2023 1 73.85 Augmentation of ground water based piped water supply scheme for Nalabara to accommodate FHTC (SM/12377) 73.85 73.85
55 Barasat Division SUPER SKILL. Formal work order for Laying of DI/UPVC distribution pipeline and Providing FHTC (Functional Household Tap Connection ) for augmentation of Mirjanagar water supply scheme in Basirhat-II block of North 24 Parganas District under Barasat Division, PHE Dte. 000009ORD/000779/2022-202 ORD/000779/2022-2023 3476/BD 01/12/2022 1 53.85 Augmentation of ground water based piped water supply scheme for Mirjanagar to accommodate FHTC (SM/11702) 53.85 53.85
56 Barasat Division M/S S.S.ENTERPRISE. (SOUTH) Formal work order for "Laying of DI rising main, DI/UPVC distribution pipe line, Construction of 350 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap 000009ORD/000779/2023-202 ORD/000779/2023-2024 2601/BD 28/08/2023 1 96.49 Augmentation of ground water based piped water supply scheme for Hasnabad to accommodate FHTC (SM/12124) 96.49 96.49
57 Barasat Division H.I.ENTERPRISE. Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line, Construction of 700 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap 000009ORD/000780/2023-202 ORD/000780/2023-2024 2592/BD 28/08/2023 1 66.69 Augmentation of ground water based piped water supply scheme for Dakshin Bhebia Zone-II to accommodate FHTC (SM/12277) 66.69 66.69
58 Barasat Division M/S S.S.ENTERPRISE. (SOUTH) Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line, Construction of 600 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap 000009ORD/000784/2023-202 ORD/000784/2023-2024 2600/BD 28/08/2023 1 104.08 Augmentation of ground water based piped water supply scheme for Bhawanipur to accommodate FHTC (SM/12126) 104.08 104.08
59 Barasat Division SUBHASH BOSE. Formal work order for Laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) for Augmentation of Patua Water Supply Scheme in Swarupnagar Block of North 24 Parganas District under Barasat Division, PHE Dte. 000009ORD/000787/2022-202 ORD/000787/2022-2023 3549/BD 06/12/2022 1 21.07 Augmentation of ground water based piped water supply scheme for Patua to accommodate FHTC (SM/11656) 21.07 21.07
60 Barasat Division BALAJI UDDYOG Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Gotra water supply scheme in Basirhat-I Block under Barasat Division, P.H.E Dte. 000009ORD/000789/2022-202 ORD/000789/2022-2023 3547/BD 06/12/2022 1 34.94 Augmentation of ground water based piped water supply scheme for Gotra to accommodate FHTC (SM/11633) 34.94 34.94
61 Barasat Division WAPCOS LIMITED. Formal work order for Providing Engineering Consultancy Service and Supervision of Turnkey works including Project Monitoring in connection with Surface water based Water Supply Scheme for Arsenic affected areas of Habra Gaighata and adjoining Mouzas in 000009ORD/000827/2014-201 ORD/000827/2014-2015 2990/BD 27/05/2014 1 13.54 Surface Water Based Water Supply Scheme for Arsenic Affected Areas of Habra-Gaighata & Adjoining Mouzas (SM/04457) 13.54 13.54
62 Barasat Division UNICON INDIA. Formal Work Order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and Jal Swapna) under command area of Bergum Water Supply Scheme at Habra-I Block within the jurisdiction of Habra Sub-Division, under 000009ORD/000864/2021-202 ORD/000864/2021-2022 2484/BD 17/12/2021 1 16.65 Providing Functional Household Tap Connection (FHTC) in connection with Jal Jivan Mission (JJM and Jal Swapna) under command area of Bergum Piped Water Supply Scheme at Habra-I Block (Phase-I) (SM/08775) 16.65 16.65
63 Barasat Division B.M.ENGINEERING. & CONSTRUCTIO Acceptance cum work order for Construction of 150 cum. capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile, pile cap & Soil Investigation within command area for Augme 000009ORD/000884/2023-202 ORD/000884/2023-2024 2793/BD 12/09/2023 1 44.42 Augmentation of Ground Water Based Piped Water Supply Scheme for Bharatpur to Accommodate FHTC (SM/11534) 44.42 44.42
64 Barasat Division TRISHA ENTERPRISE & CO. Acceptance cum work order for Laying of 90 mm dia. UPVC pipe line from Boltala Kalupara More to near KatakhaliMadrasa within Hingalganj W/S Scheme (Z-I), Hingalganj block under Hasnasbad Sub-Division, P.H.E.Dte. 000009ORD/000917/2022-202 ORD/000917/2022-2023 937/HSD 07/07/2022 1 3.19 Providing Functional Household Tap Connection (FHTC) in connection with Jal Jivan Mission (JJM and Jal Swapna) under command area of Hingalganj Piped Water Supply Scheme (Zone -I), Hingalganj Block (SM/09224) 3.19 3.19
65 Barasat Division PURBA SERVICES Supply, erection of Sign Board at 10 (Ten) Nos. NABL Recognized Sub District Water Testing Laboratory under Barasat Division, P.H.Engg. Dte. 000009ORD/000986/2022-202 ORD/000986/2022-2023 879/BST 27/12/2022 1 0.84 Yearly operational charges of PHE Dte and NGO managed Laboratories related to WQMSP in connection with Jal Jeevan Mission under Barasat Division PHE Dte. (SM/11625) 0.84 0.84
66 Barasat Division LAB. SOLUTION Providing service by assigning Resource Person for a period of 3 months supervision of process of preparation for NABL recognition for Chemical Testing of potable water of Sub-District level Water Quality Testing Laboratory including supply, installation 000009ORD/001060/2021-202 ORD/001060/2021-2022 675/BST 24/12/2021 1 1.18 Up-gradation of PHED & NGO Managed Laboratories under Water Quality Monitoring & Surveillance Programme for 2018-19 (SM/06349) 1.18 1.18
67 Barasat Division ABDUL ALIM MONDAL. Formal work order for Construction of 300 cum capacity 20 mtr staging height R.C.C Over Head Reservoir as per Deptt. design, drawing & specification including bored pile with pile cap for Augmentation of Durgapur Baylani water supply scheme (Zone-II), H 000009ORD/001095/2023-202 ORD/001095/2023-2024 3021/BD 05/10/2023 1 52.15 Augmentation of Ground Water Based Piped Water Supply Scheme for Durgapur Baylani Zone-II to accommodate FHTC. (SM/11664) 52.15 52.15
68 Barasat Division MONDAL & CO. (BASIRHAT). Formal work order for Construction of 500 cum capacity 20 mtr staging height R.C.C Over Head Reservoir as per Deptt. design, drawing & specification including bored pile with pile cap in connection with Augmentation of Chandpur water supply scheme (Zone-I 000009ORD/001096/2023-202 ORD/001096/2023-2024 2866/BD 20/09/2023 1 96.86 Augmentation of Ground Water Based Piped Water Supply Scheme for Chandpur to accommodate FHTC. (SM/13313) 96.86 96.86
69 Barasat Division M/S B.K.ENTERPRISE. Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line and providing Functional Household Tap Connection in connection with Augmentation of Chaital water supply scheme, Minakhan Block under Hasnabad Sub-Division, PHE Dte. 000009ORD/001135/2022-202 ORD/001135/2022-2023 517/BD 20/02/2023 1 32.39 Augmentation of ground water based piped water supply scheme for Chaital to accommodate FHTC (SM/11669) 32.39 32.39
70 Barasat Division M/S S.S.ENTERPRISE. (SOUTH) Formal work order for Laying of Distribution system, Construction of Office cum Guard room, Switch cum Chlorine Room, Boundary wall, Surface drain, Land development and other allied works and Providing FHTC within the jurisdiction of (Zone-XIII) under Hab 000009ORD/001160/2023-202 ORD/001160/2023-2024 2958/BD 29/09/2023 1 216.82 Surface Water Based Water Supply Scheme for Arsenic Affected Areas of Habra-Gaighata & Adjoining Mouzas (SM/04457) 216.82 216.82
71 Barasat Division SRIJAN ECOLOGICAL UPLIFTMENT P Formal work order for Laying of Distribution system, Construction of Office cum Guard room, Switch cum Chlorine Room, Boundary wall, Surface drain, Land development and other allied works and Providing FHTC within the jurisdiction of (Zone-XIX) under Habr 000009ORD/001161/2023-202 ORD/001161/2023-2024 2954/BD 29/09/2023 1 388.77 Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan mission (JJM) under command area of 'Surface water based water supply scheme for Arsenic Affected Areas of Habra-Gaighata & Adjoning Moujas under North 24 Parganas District (SM/13538) 388.77 388.77
72 Barasat Division SRIJAN ECOLOGICAL UPLIFTMENT P Formal work order for Laying of Distribution system, Construction of Office cum Guard room, Switch cum Chlorine Room, Boundary wall, Surface drain, Land development and other allied works and Providing FHTC within the jurisdiction of (Zone-XXI) under Habr 000009ORD/001162/2023-202 ORD/001162/2023-2024 2953/BD 29/09/2023 1 451.1 Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan mission under command area of 'Surface water based water supply scheme for Arsenic Affected Areas of Habra-Gaighata & Adjoning Moujas under North 24 Parganas District proj (SM/13536) 451.1 451.1
73 Barasat Division ALOK ENTERPRSE. (A UNIT OF SAK Formal work order for Laying of Distribution system, Construction of Office cum Guard room, Switch cum Chlorine Room, Boundary wall, Surface drain, Land development and other allied works and Providing FHTC within the jurisdiction of (Zone-XXVI) under Hab 000009ORD/001165/2023-202 ORD/001165/2023-2024 2955/BD 29/09/2023 1 118.25 Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan mission (JJM) under command area of 'Surface water based water supply scheme for Arsenic Affected Areas of Habra-Gaighata & Adjoning Moujas under North 24 Parganas District (SM/13532) 118.25 118.25
74 Barasat Division M/S S.S.ENTERPRISE. (SOUTH) Formal work order for Laying of Distribution system, Construction of Office cum Guard room, Switch cum Chlorine Room, Boundary wall, Surface drain, Land development and other allied works and Providing FHTC within the jurisdiction of (Zone-XXIV) under Hab 000009ORD/001172/2023-202 ORD/001172/2023-2024 2959/BD 29/09/2023 1 200.62 Surface Water Based Water Supply Scheme for Arsenic Affected Areas of Habra-Gaighata & Adjoining Mouzas (SM/04457) 200.62 200.62
75 Barasat Division BALAJI UDDYOG Formal work order for Laying Distribution system, Construction of Office cum Guard room, Switch cum Chlorine Room, Boundary wall, Surface drain, Land development and other allied works and Providing FHTC at Zonal Head work site - XVII i.e. Betpuli within 000009ORD/001179/2023-202 ORD/001179/2023-2024 3020/BD 05/10/2023 1 142.49 Surface Water Based Water Supply Scheme for Arsenic Affected Areas of Habra-Gaighata & Adjoining Mouzas (SM/04457) 142.49 142.49
76 Barasat Division MONDAL ENTERPRISE. (BARASAT) Formal work order for Construction of 1200cum capacity 20mtr.Height R.C.C Over Head Reservoir and laying of Rising main & distribution pipe line by DI & UPVC and Providing FHTC for Augmentation of Chandrapur Water Supply Scheme under Barasat Sub-Division, 000009ORD/001189/2023-202 ORD/001189/2023-2024 3062/BD 09/10/2023 1 162.36 Augmentation of Ground water based Chandrapur Piped Water Supply scheme to Accommodate FHTC (SM/14161) 162.36 162.36
77 Barasat Division PUSPA ENTERPRISE. Formal work order for Construction of 900 cum capacity 20mtr Height R.C.C Over Head Reservoir and laying of Rising main & distribution pipe line by DI & UPVC and providing FHTC for Augmentation of Bodai Zone-I Water Supply Scheme under Barasat Sub-Divisio 000009ORD/001196/2023-202 ORD/001196/2023-2024 3080/BD 10/10/2023 1 61.93 Augmentation of Ground water based Bodai Zone-I PWSS to accommodate FHTC (SM/18416) 61.93 61.93
78 Barasat Division M/S DATTA ENTERPRISE. Formal work order for Construction of switch room cum chlorine room with sanitary and water supply arrangement including plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No.-2,3,4 (Size-3.60x3.00 mtr),Laying of DI rising main and DI/UPVC distribut 000009ORD/001208/2023-202 ORD/001208/2023-2024 4047/BD 13/10/2023 1 84.9 Dakshin Akhratala Piped Water Supply Scheme (SM/18617) 84.9 84.9
79 Barasat Division GARGO TRADERS Formal work order for Construction of 2 nos. (1250 CuM & 600 CuM) capacity OHR, Land development, Construction of Office cum Guard room and Switch cum Chlorine Room, Boundary wall, Surface drain and related allied works at Zone-X and XI Head work sites in 000009ORD/001211/2023-202 ORD/001211/2023-2024 4072/BD 16/10/2023 1 300.83 Surface Water Based Water Supply Scheme for Arsenic Affected Areas of Habra-Gaighata & Adjoining Mouzas (SM/04457) 300.83 300.83
80 Barasat Division SRIJAN ECOLOGICAL UPLIFTMENT P Formal work order for Laying of Distribution System, Providing FHTC, Construction of Office cum Guard room, Land development and Switch cum Chlorine Room, Boundary wall, Surface drain and other allied works within the jurisdiction of (Zone-XX) i.e. Matiku 000009ORD/001214/2023-202 ORD/001214/2023-2024 4073/BD 16/10/2023 1 1,177.37 Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan mission under command area of 'Surface water based water supply scheme for Arsenic Affected Areas of Habra-Gaighata & Adjoning Moujas under North 24 Parganas District proje (SM/13535) 588.69 588.69
81 Barasat Division GBC INFRASTRUCTURE PRIVATE LIM Formal work order for Construction of 1150 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap at (Zone- XXV) i.e. Jhikra & Laying of Distribution Syst 000009ORD/001215/2023-202 ORD/001215/2023-2024 4081/BD 16/10/2023 1 262.06 Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan mission under command area of 'Surface water based water supply scheme for Arsenic Affected Areas of Habra-Gaighata & Adjoning Moujas under North 24 Parganas District proje (SM/13533) 262.06 262.06
82 Barasat Division SARKAR ENTERPRISE & CO. Formal work order for construction of 300 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap for Augmentaion of Nurpur water supply scheme, Minakhan Bl 000009ORD/001251/2023-202 ORD/001251/2023-2024 4181/BD 30/10/2023 1 28.16 Augmentation of Ground Water Based Piped Water Supply Scheme for Nurpur to accommodate FHTC. (SM/11595) 28.16 28.16
83 Barasat Division DEBASIS SAMADDAR Formal work order for construction of 300 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap for Augmentaion of Durgamandop water supply scheme, Sandes 000009ORD/001252/2023-202 ORD/001252/2023-2024 4182/BD 30/10/2023 1 83.99 Augmentation of Ground water based piped water supply scheme for Durgamandap (SM/10370) 83.99 83.99
84 Barasat Division UNIVERSAL CONSTRUCTION Formal work order for Construction and Commissioning of 15 (fifteen) nos. Over Head Reservoirs including soil test of different capacity at different PWSS within Bongaon and Bagdah Block along with other ancillary civil works for Arsenic affected Blocks o 000009ORD/001258/2023-202 ORD/001258/2023-2024 4188/BD 30/10/2023 1 139.59 Surface Water Based PWSS for Arsenic Affected Areas of Bagda and Bongaon Blocks (Including Ranaghat-I, Ranaghat-II Blocks and Bongaon Municipality) (SM/06364) 139.59 139.59
85 Barasat Division UNIVERSAL CONSTRUCTION Formal work order for construction of 1150 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap at (Zone-XXVII) i.e. Sutia & Construction of Office cum G 000009ORD/001261/2023-202 ORD/001261/2023-2024 4192/BD 30/10/2023 1 85.54 Surface Water Based Water Supply Scheme for Arsenic Affected Areas of Habra-Gaighata & Adjoining Mouzas (SM/04457) 85.54 85.54
86 Barasat Division BKB INFRA PROJECTS PVT. LTD. Formal work order for Construction and Commissioning of 4 (four) nos. Over Head Reservoirs including soil investigation for Zone No. XXIV, XXVI, XXVIII & XXIX of capacity 1000cum, 1200cum, 800cum & 750cum respectively of Habra-Gaighata surface water based 000009ORD/001262/2023-202 ORD/001262/2023-2024 4187/BD 30/10/2023 1 95.06 Surface Water Based Water Supply Scheme for Arsenic Affected Areas of Habra-Gaighata & Adjoining Mouzas (SM/04457) 95.06 95.06
87 Barasat Division GARGO TRADERS Formal work order for Construction of Office cum Guard room, Switch cum Chlorine Room, Boundary wall, Surface drain, Land development and related allied works at Zonal Head Work site - XXIX i.e. Tentulberia including Laying distribution system within the 000009ORD/001265/2023-202 ORD/001265/2023-2024 4199/BD 31/10/2023 1 119.86 Surface Water Based Water Supply Scheme for Arsenic Affected Areas of Habra-Gaighata & Adjoining Mouzas (SM/04457) 119.86 119.86
88 Barasat Division ANKUSH CONSTRUCTION & CO. Acceptance cum work order for 2 nos. pump connection at PH No.-1 & 2 in connection with Augmentation for Monipur water supply scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. 000009ORD/001291/2023-202 ORD/001291/2023-2024 1413/HSD 06/11/2023 1 0.9 Augmentation of Ground Water Based Piped Water Supply Scheme for Monipur to accommodate FHTC (SM/11632) 0.9 0.9
89 Barasat Division JESMINE ENTERPRISE. Acceptance cum work order for Construction of boundary wall with RCC column structure at Head Work site (TW No-1) within Jhupkhali w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. 000009ORD/001304/2023-202 ORD/001304/2023-2024 4377/BD 10/11/2023 1 20.58 Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan mission (JJM and Jal Swapna) under command area of Jhupkhali W/S Scheme, Sandeshkhali-II Block, Dist. - North 24 Parganas under Barasat Division, PHE. Dte. (Phase I). (SM/10505) 20.58 20.58
90 Barasat Division R. B. ENTERPRISE Acceptance cum Work order for Construction of boundary wall with RCC column structure at Head Work site within Tushkhali w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. 000009ORD/001307/2023-202 ORD/001307/2023-2024 4379/BD 10/11/2023 1 18.48 Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan mission (JJM and Jal Swapna) under command area of Tushkhali W/S Scheme, Sandeshkhali-II Block, Dist. - North 24 Parganas under Barasat Division, PHE. Dte. (Phase I). (SM/10550) 18.48 18.48
91 Barasat Division CSS INFOSOLUTION. Annual Maintenance Contract (AMC) for Computers Printers UPS and other related peripherals installed in various water testing laboratories under office of the Executive Engineer, Barasat Division P.H.E.Dte. (for the period 01.10.2023 to 30.09.2024). 000009ORD/001387/2023-202 ORD/001387/2023-2024 871/BST 29/09/2023 1 1.2 Yearly Operational Charges of PHED and NGO managed Laboratories for 2024 related to WQMSP in connection with JJM under Barasat Division, P.H.E.Dte. (SM/19259) 1.2 1.2
92 Barasat Division GHOSH CONSTRUCTION. Acceptance cum work order for Construction of Boundary wall at Head work site for Augmentation of Gadpukuria (Zone-I) water Supply scheme, Bagdah Block within jurisdiction of Bongaon Sub-Division, P.H.E. Dte. 000009ORD/001472/2023-202 ORD/001472/2023-2024 4411/BD 10/11/2023 1 19.43 Augmentation of Ground Water Based Piped Water Supply Scheme for Gadpukuria Zone-I to Accommodate FHTC (SM/11761) 19.43 19.43
93 Barasat Division TAPAN GHOSH. Acceptance cum work order for Construction of Boundary wall aand Construction of Approach Road at 1st T/W site under Augmentation of Chauberia water Supply scheme, Bongaon Block within jurisdiction of Bongaon Sub-Division, under Barasat Division P.H.E. Dt 000009ORD/001499/2023-202 ORD/001499/2023-2024 4485/BD 23/11/2023 1 5.57 Augmentation of Ground Water Based Piped Water Supply Scheme for Chauberia to Accommodate FHTC (SM/11592) 5.57 5.57
94 Barasat Division M/S S.S.ENTERPRISE. (SOUTH) Formal work order for Construction of Chlorine Room, Guard Room, Boundary wall, Surface drain, Pathway, Approach road, Retaining Wall, Cable Trench, Land development, Beautification and allied works at Ashoknagar G.L.R sites of surface based Water supp 000009ORD/001521/2023-202 ORD/001521/2023-2024 4833/BD 26/12/2023 1 32.58 Surface Water Based Water Supply Scheme for Arsenic Affected Areas of Habra-Gaighata & Adjoining Mouzas (SM/04457) 32.58 32.58
95 Barasat Division EFFLUENT & WATERTREATMENT ENGI Acceptance cum work order for Renovation of 103 Cum/hr of capacity AIRP and allied works at Head work site for Augmentation of Gadpukuria (Zone-I) water Supply Scheme under Bongaon Sub-Division, Barasat Division P.H.E. Dte. 000009ORD/001542/2023-202 ORD/001542/2023-2024 13/BD 02/01/2024 1 4.95 Augmentation of Ground Water Based Piped Water Supply Scheme for Gadpukuria Zone-I to Accommodate FHTC (SM/11761) 4.95 4.95
96 Barasat Division SRIJAN ECOLOGICAL UPLIFTMENT P Formal work order for Land development, Construction of Office cum Guard room and Switch cum Chlorine Room, Boundary wall, Surface drain and related allied works at Zonal Head work site - XIV i.e. Kumra /Zonal Head work site - XVI i.e.Nangla including Lay 000009ORD/001613/2023-202 ORD/001613/2023-2024 110/BD 10/01/2024 1 704.27 Surface Water Based Water Supply Scheme for Arsenic Affected Areas of Habra-Gaighata & Adjoining Mouzas (SM/04457) 704.27 704.27
97 Barasat Division M/S B.K.ENTERPRISE. Acceptance cum work order for Hiring Diesel Luxury Car on Daily basis ( from 01.01.2024 to 31.03.2024) for the office use of Deputy Superintending Engineer, Planning Circle-I, PHE Dte. 000009ORD/001624/2023-202 ORD/001624/2023-2024 4876/BD 29/12/2023 3 1.03 Augmentation of Ground Water Based Piped Water supply Scheme for Gadpukuria Zone-II to Accommodate FHTC (SM/11762) 1.03 1.03
98 Barasat Division M/S LATIKA CONSTRUCTION. Hiring of 1 no. of Diesel Luxury Car (Euro - IV/VI) in good condition (traffic worthy) on daily basis for office use of the Assistant Engineer, Habra Sub-Division, under Barasat Division P.H.E. Dte. (For the period from: 01.12.2023 to 30.11.24) 000009ORD/001630/2023-202 ORD/001630/2023-2024 720/HAB 23/11/2023 3 0.96 Augmentation of Ground water based piped water supply scheme for Bira Rajibpur to accommodate FHTC (SM/10782) 0.96 0.96
99 Barasat Division LAB. SOLUTION Supervision and extend support to NABL recognized Paschim Banga Vigyan Mancha Sub-District Water Testing Laboratory by assigning team of competent resource personnel who will be engaged for complete supervision for retaining NABL recognition and completio 000009ORD/001676/2023-202 ORD/001676/2023-2024 1187/BST 22/12/2023 1 19.82 Procurement of services & consumables for continuance of NABL Accreditation and Recognition of District and Sub District Drinking Water Testing Laboratories related to Water Quality Monitoring & Surveillance Programme under jal Jeevan Mission (SM/13633) 19.82 19.82
100 Barasat Division LAB. SOLUTION Supervision and extend support to NABL recognized Forum of Scientists Engineers & Technologists Sub-District Water Testing Laboratory by assigning team of competent resource personnel who will be engaged for complete supervision for retaining NABL recogn 000009ORD/001677/2023-202 ORD/001677/2023-2024 1196/BST 29/12/2023 1 19.82 Procurement of services & consumables for continuance of NABL Accreditation and Recognition of District and Sub District Drinking Water Testing Laboratories related to Water Quality Monitoring & Surveillance Programme under jal Jeevan Mission (SM/13633) 19.82 19.82
101 Barasat Division UTPAL CONSTRUCTION & CO. Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.-1 & 2 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Sahe 000009ORD/001683/2023-202 ORD/001683/2023-2024 526/BD 20/02/2024 1 48.73 Augmentation of ground water based piped water supply scheme for Sahebkhali to accommodate FHTC (SM/12278) 48.73 48.73
102 Barasat Division UMWELT ENGINEER PVT.LTD. Formal work order for Name of Work: Laying Distribution System including construction of Surface drain, Land development and allied works at Zonal Head work with repair & renovation of 450 cum & 700 cum capacity OHR, Chlorine & Guard Room, Boundary wa 000009ORD/001696/2023-202 ORD/001696/2023-2024 353/BD 02/02/2024 1 382.96 Augmentation of Mathurabil Zone-II in Barrackpore-I Block of North 24 Parganas District under Barasat Division, P.H.E.Dte. (SM/19109) 382.96 382.96
103 Barasat Division ABDUL ALIM MONDAL. Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) for left out house holds under the command area of Kalinagar water supply scheme (Z-I) in order to provide Har Ghar Jal Certification, Sandeshkhali-I Block under Hasnabad 000009ORD/001730/2023-202 ORD/001730/2023-2024 429/BD 09/02/2024 1 9.39 Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan mission (JJM and Jal Swapna) under command area of Kalinagar (Zone-I) W/S Scheme, Sandeshkhali-I Block, Dist. - North 24 Parganas under Barasat Division, PHE. Dte. (Phase I (SM/10507) 9.39 9.39
104 Barasat Division ANKUSH CONSTRUCTION & CO. Acceptance cum work order for Renovation and repairing of Boundary wall at Head Work site for Augmentation of Krishnachandrapur Water Supply Scheme, Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. 000009ORD/001739/2023-202 ORD/001739/2023-2024 535/BD 21/02/2024 1 17.76 Augmentation of ground water based piped water supply scheme for Krishnachandrapur to accommodate FHTC, Block - Bongaon (SM/10308) 17.76 17.76
105 Barasat Division KAMAL HALDER. Acceptance cum work order for Renovation and repairing of Boundary wall at 1st Tube Well & 2nd Tube Well site and Construction of Approach Road at 1st Tube Well & 2nd Tube Well site under Augmentation of Chhaygharia (Zone-I) Water Supply Scheme, Bongaon B 000009ORD/001743/2023-202 ORD/001743/2023-2024 559/BD 22/02/2024 1 3.15 Augmentation of Ground Water Based Piped Water Supply Scheme for Chhayageria Zone-I to Accommodate FHTC (SM/11593) 3.15 3.15
106 Barasat Division MA CONSTRUCTION. Acceptance cum work order for Construction of Boundary wall at 1st Tube well site for Augmentation of Kalupur Water Supply Scheme, Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. 000009ORD/001744/2023-202 ORD/001744/2023-2024 560/BD 22/02/2024 1 9.31 Augmentation of Ground Water Based Piped Water Supply Scheme for Kalupur to Accommodate FHTC (SM/11631) 9.31 9.31
107 Barasat Division ROY ENGINEERS. Acceptance cum work order for Renovation and repairing of Boundary wall at 1st Tube Well & 2nd Tube Well site and Construction of Approach Road at 1st Tube Well & 2nd Tube Well site under Augmentation of Chhaygharia (Zone-III) Water Supply Scheme, Bongaon 000009ORD/001745/2023-202 ORD/001745/2023-2024 561/BD 22/02/2024 1 9.86 Augmentation of Ground Water Based Piped Water Supply Scheme for Chhayageria Zone-III to Accommodate FHTC (SM/11594) 9.86 9.86
108 Barasat Division M/S B.K.ENTERPRISE. Acceptance cum work order for Uploading of FTK Data Sheet (Phase-II) to WQMIS related to Water Quality Monitering & Surveillance Programme under Jal Jeevan Mission of North 24 parganas. 000009ORD/001754/2023-202 ORD/001754/2023-2024 445/BD 12/02/2024 1 0.56 Collection, testing and uploading charges of drinking water sample (Phase-II) through Field Test Kits (FTK) (Phase-II) (SM/18143) 0.56 0.56
109 Barasat Division M/S B.K.ENTERPRISE. Acceptance cum work order for Collection of Water Sample in uninterrupted manner and submit the same to the respective PHED laboratory by engagement of agency where ever facilitator are not available, unwilling or inactive in North 24 Pargaanas District u 000009ORD/001755/2023-202 ORD/001755/2023-2024 444/BD 12/02/2024 1 3.98 Collection, testing and uploading charges of drinking water sample (Phase-II) through Field Test Kits (FTK) (Phase-II) (SM/18143) 3.98 3.98
110 Barasat Division H.I.ENTERPRISE. Formal work order for Withdrawing and relaying of existing D.I. Rising main and restoration of damaged UPVC pipe line of distribution system along the PW(R)D, PWD, ZP, PMGSY & other Black Top and WBM Road due to laying of different dia. Secondary Rising M 000009ORD/001769/2023-202 ORD/001769/2023-2024 574/BD 22/02/2024 1 36.54 Surface Water Based PWSS for Arsenic Affected Areas of Bagda and Bongaon Blocks (Including Ranaghat-I, Ranaghat-II Blocks and Bongaon Municipality) (SM/06364) 36.54 36.54
111 Barasat Division SHYAM SUNDAR DAS. Acceptance cum work order for Dismantling & Re-construction of boundary wall for movement of rig & other machineries for sinking of big dia TW at PH no-1 in connection with Augmentation of Barunhat Patlikhanpur w/s scheme (Z-I), Hasnabad block under Has 000009ORD/001859/2023-202 ORD/001859/2023-2024 38/HSD 09/01/2024 1 0.88 Augmentation of Ground Water Based Piped Water Supply Scheme for Barunhat Patlikhanpur to accommodate FHTC. (SM/11987) 0.88 0.88
112 Barasat Division CHAKRABORTY SUPPLIERS & CONSTR Construction of Service Road (10 Mtr. Length & 2 Mtr. Wide while 1.00 Mtr existing Road ) for Pump House No:2 of Maslandapur II Piped Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Divisio 000009ORD/001886/2023-202 ORD/001886/2023-2024 134/HAB 05/02/2024 1 0.73 Augmentation of Ground water based piped water supply scheme for Maslandapur Zone-II to accommodate (SM/10533) 0.73 0.73
113 Barasat Division ATINDRA CONSTRUCTION PRIVATE L Formal work order for Laying of 800 mm dia HDPE pipe by Horizontal Directional Drilling (HDD) method from Ashoknagar Building More to Ashoknagar 3 No Rail Gate along the National Highway - 35 in connection with Surface Water Based Water Supply Scheme for 000009ORD/001923/2023-202 ORD/001923/2023-2024 750/BD 07/03/2024 1 47.5 Surface Water Based Water Supply Scheme for Arsenic Affected Areas of Habra-Gaighata & Adjoining Mouzas (SM/04457) 47.5 47.5
114 Barasat Division ATINDRA CONSTRUCTION PRIVATE L Formal work order for Laying of HDPE pipe of different diameter by Horizontal Directional Drilling (HDD) method for crossing canal, river along busy road etc. different places along the stretches for (North-East Part) of Secondary Rising Main to connect a 000009ORD/001930/2023-202 ORD/001930/2023-2024 806/BD 12/03/2024 1 167.54 Surface Water Based PWSS for Arsenic Affected Areas of Bagda and Bongaon Blocks (Including Ranaghat-I, Ranaghat-II Blocks and Bongaon Municipality) (SM/06364) 167.54 167.54
115 Barasat Division M/S K.P.PAL. Acceptance cum work order for Sinking of 3 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tube well by D.R. Rig method at PH No.-1, 2 & 3 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of 000009ORD/001933/2023-202 ORD/001933/2023-2024 916/BD 15/03/2024 1 59.32 Augmentation of ground water based piped water supply scheme for Bhawanipur to accommodate FHTC (SM/12126) 59.32 59.32
116 Barasat Division M/S B.K.ENTERPRISE. Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.-1 & 2 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Sult 000009ORD/001980/2023-202 ORD/001980/2023-2024 917/BD 15/03/2024 1 45.65 Augmentation of Sultanpur Piped water supply scheme (SM/14510) 45.65 45.65
117 Barasat Division MONDAL PRECISION PVT.LTD Acceptance cum work order for Renovation of Arsenic cum Iron Removal Plant at Nalkora W/S Scheme including increasing the height of back wash tank at Basirhat - I Block under Basirhat Sub Division, PHE Dte. Capacity - 10.81 Cum/hr. 000009ORD/002026/2023-202 ORD/002026/2023-2024 920/BD 15/03/2024 1 16.77 Augmentation of ground water based piped water supply scheme for Nalkora to accommodate FHTC (SM/11524) 16.77 16.77
118 Barasat Division EFFLUENT & WATERTREATMENT ENGI Acceptance cum work order for Renovation of Arsenic cum Iron Removal Plant at Goknasree Gobindapur W/S Scheme including increasing the height of back wash tank at Basirhat - I Block under Basirhat Sub Division, PHE Dte. Capacity- 60.00 Cum/hr. 000009ORD/002029/2023-202 ORD/002029/2023-2024 923/BD 15/03/2024 1 27.58 Augmentation of ground water based piped water supply scheme for Goknashri Gobindapur to accommodate FHTC (SM/11604) 27.58 27.58
119 Barasat Division NEER UDYOG Acceptance cum work order for Renovation of Iron Elimination Plant at Shankarpur W/S Scheme at Basirhat- I Block under Basirhat Sub division, PHE Dte. Capacity- 93.0625 m3/hr. 000009ORD/002036/2023-202 ORD/002036/2023-2024 922/BD 15/03/2024 1 16.34 Augmentation of ground water based piped water supply scheme for Shankarpur to accommodate FHTC (SM/11607) 16.34 16.34
120 Barasat Division GOPAL SINGHA. Continuation Work Order for Hiring of 1(one) number vehicle of Category Motor Cab/Maruti Omni(standard)(Non Air-Conditioned)/LPG/CNG Engine including Driver for performing the inspection works and official duties for the office of the Assistant Engineer, 000009ORD/002038/2023-202 ORD/002038/2023-2024 107/BKP 06/03/2024 1 0.34 Providing Functional Household Tap Connection (FHTC) in connection with Jal Jivan Mission (JJM and Jal Swapna) under command area of Dangatangatangi, Bodai, Sonadanga, Kamdebpur, Mirhati, Mathura, Durlavpur & Belu mouzas within Bodai Zone-I Piped Water Su (SM/08773) 0.34 0.34
121 Barasat Division M/S B.K.ENTERPRISE. Formal work order for Additional Laying of DI/UPVC distribution pipe line and Providing Functional Household Tap Connection for the leftout portion in connection with Augmentation of Chaital water supply scheme, Minakhan Block under Hasnabad Sub-Divisio 000009ORD/002054/2023-202 ORD/002054/2023-2024 881/BD 14/03/2024 1 63.01 Augmentation of ground water based piped water supply scheme for Chaital to accommodate FHTC (SM/11669) 63.01 63.01
122 Barasat Division ROMI TREDERS. Construction of Pump House with latrine at Berachampa Zone-I water Supply Scheme under Deganga Block size of 5.40m x 3.60m within Barasat Sub Division, P.H.E.Dte. 000009ORD/002151/2023-202 ORD/002151/2023-2024 1242/BSD 15/03/2024 1 4.86 Augmentation of Berachampa Zone-1 Piped Water Supply Scheme (SM/14490) 4.86 4.86
123 Barasat Division D.K.CONSTRUCTION Construction of Pump House with latrine at Berachampa Zone-III water Supply Scheme under Deganga Block size of 5.40m x 3.60m within Barasat Sub Division, P.H.E.Dte. 000009ORD/002152/2023-202 ORD/002152/2023-2024 1243/BSD 15/03/2024 1 3.62 Augmentation of Berachampa Zone-3 Piped Water Supply Scheme (SM/13894) 3.62 3.62
124 Barasat Division M/S S.HAQUE & CO. Construction of Pump House with latrine at Berachampa Zone-IV water Supply Scheme under Deganga Block size of 5.40m x 3.60m within Barasat Sub Division, P.H.E.Dte. 000009ORD/002153/2023-202 ORD/002153/2023-2024 1244/BSD 15/03/2024 1 4.87 Augmentation of Berachampa Zone-4 Piped Water Supply Scheme (SM/15323) 4.87 4.87
125 Barasat Division SUBHASH BOSE Acceptance cum work order for Emergent resting of newly laid UPVC distribution pipeline by bamboo pilling at Mistri para near Pump House No.-1 of Jeliakhali Purbakhanda w/s scheme, Sandeshkhali-II Block under Hasnabad Sub-Division, PHE Dte. 000009ORD/002242/2023-202 ORD/002242/2023-2024 791-HSD. 13/07/2023 1 0.99 Jeliakhali Purba Khanda Piped Water Supply Scheme (SM/06322) 0.99 0.99
126 Barasat Division KRISHNA SAHA. Acceptance cum work order for Hiring diesel luxury car daily basis (From 01.06.2024 to 30.11.2024) for the Office uses of the Assistant Engineer (HQ) Barasat Division, P.H.Dte. 000009ORD/002257/2023-202 ORD/002257/2023-2024 845/BD 13/03/2024 1 0.15 Augmentation of Ground water based Kashimpur PWSS to accommodate FHTC (SM/14733) 0.15 0.15
127 Barasat Division ONKAR ENTERPRISE. Construction of 3.60 mtr. X 3.00mtr. size Switch room with sanitary and water supply arrangement incl. plinth protection at 2nd Tube Well site at Gadpukuria w/s scheme (Zone-II), Bagdah block within the jurisdiction of Bongaon Sub-Division, under Barasat 000009ORD/002273/2023-202 ORD/002273/2023-2024 210/Bon 27/02/2024 1 4.35 Augmentation of Ground Water Based Piped Water supply Scheme for Gadpukuria Zone-II to Accommodate FHTC (SM/11762) 4.35 4.35
128 Barasat Division SUSMITA MANDAL. Work order for Supply of one motor launch on daily hire basis for use of Hasnabad Sub-Division, P.H.E. Dte. Period :01.04.24 to 31.08.24. 000009ORD/002396/2023-202 ORD/002396/2023-2024 424/HSD 28/03/2024 1 6.59 Surface Water Based Piped Water Supply Scheme for Hasnabad (SM/06472) 6.59 6.59
129 Barasat Division WAPCOS LIMITED. Acceptance cum work order for providing Engineering Consultancy Services and Supervision of Turnkey works including Project Monitoring in connection with surface water based Water Supply Scheme for Arsenic affected areas of Habra-Gaighata & adjoining mouz 000009ORD/002523/2023-202 ORD/002523/2023-2024 70/BD 05/01/2024 1 7.62 Surface Water Based Water Supply Scheme for Arsenic Affected Areas of Habra-Gaighata & Adjoining Mouzas (SM/04457) 7.62 7.62
130 Barasat Division VAI ENTERPRISE. Hiring of an Additional Vehicle (Diesel) for the site inspection of different ongoing schemes under JJM Program at Bongaon Sub-Division, P.H.E.Dte. 000009ORD/002530/2023-202 ORD/002530/2023-2024 484/Bon 30/06/2023 6 1.78 Additional detail project report for augmentation of Ground water based PWSS for Gangrapota (SM/13984) 1.78 1.78
131 Barasat Division SUBHASH BOSE Acceptance cum work order for 1 no. pump connection at PH No.-1 for Jeliakhali Purbakhanda water supply scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. 000009ORD/002532/2023-202 ORD/002532/2023-2024 797-HSD.. 13/07/2023 1 0.8 Jeliakhali Purba Khanda Piped Water Supply Scheme (SM/06322) 0.8 0.8
Total 155 9,030.09 # 8,441.41 8,441.41