Sl. No. | Division
Working Divisions
|
System Order No
System generated Order No. for the Work Order as per PHED-MIS
|
Order Date
Date of Issuance of the Work Order as per PHED-MIS
|
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
|
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
|
Work Name
Name of the Work as per the Issued Work Order
|
Order Value
Value of Work as mentioned in the Work Order
|
---|---|---|---|---|---|---|---|
9 | 374.6 | ||||||
1 | Bankura Mechanical Division | ORD/000141/2022-2023 | 05/07/2022 | 851/BMD | M/S NABIN GOPAL SENGUPTA | Acceptance cum Formal work order for the work of Supply and delivery of different types of Drilling Materials for sinking of 200mm x165mm DTH type RBTW by Departmental Rig of B.M.S.D (D) in Balarampur Block in the Distric of Purulia in connection to JJ | 36.79 |
2 | Bankura Mechanical Division | ORD/000213/2022-2023 | 28/04/2022 | 639/ BMD | PRADIP KUMAR DHABAL | Acceptance cum Formal work order for the work of Additional works in connection with Providing submersible river bed pumping machineries (For T/W No-7 to 12) along with other allied electromechanical works at Motgoda under Raipur Left Out mouza water supp | 25.65 |
3 | Bankura Mechanical Division | ORD/000073/2021-2022 | 27/07/2021 | 895/BMD | M/S P.P ELECTRICALS | Acceptance cum Formal work order for the work of Providing And Installation Of Pumping Machineries And Other Electro-Mechanical Accessories for Improvement of Hirbandh And Adjoining Mouzas Water supply Scheme. Block- Hirbandh, Dist- Bankura. | 36.91 |
4 | Bankura Mechanical Division | ORD/000169/2023-2024 | 04/05/2023 | 881/BMD | TAPAN KUMAR SARKAR | Acceptance cum Formal work order for the work of Providing, installation of Pumping machineries with other electro-mechanical accessories for newly sunk TW No-I, TW No-II of Bagdoba Piped water supply scheme Block : Kotulpur under Bankura Mechanical D | 47.08 |
5 | Bankura Mechanical Division | ORD/000617/2023-2024 | 12/09/2023 | 2089/BMD | M/S S.S. ENTERPRISE(MURSHIDABAD) | Acceptance cum Formal work order for the work of Providing and installation of pumping machineries and other electromechanical accessories for proposed Sub surface water based Tilabani piped water supply scheme Block Simlapal under under Bankura Mechani | 38.30 |
6 | Bankura Mechanical Division | ORD/000612/2023-2024 | 12/09/2023 | 2086/BMD | DAS ENTERPRISE | Acceptance cum Formal work order for the work of Replacement of Valves on delivery line at Intermediate Boosting pumping station(IBS) at Upargora under Chhatna, Saltora Block Sub-Surface Water Based Piped Water Supply Scheme (BRGF Phase-I) under | 17.65 |
7 | Bankura Mechanical Division | ORD/000618/2023-2024 | 12/09/2023 | 2090/BMD | MAHADEV ENTERPRISE | Acceptance cum Formal work order for the work of Providing and installation of pumping machineries and other electromechanical accessories for Augmentation works for Augmentation of piped water supply scheme for Lakshmisagar and its adjoining mouzas under | 86.97 |
8 | Bankura Mechanical Division | ORD/000615/2023-2024 | 12/09/2023 | 2087/BMD | SUDIP ENGINEERING CO | Acceptance cum Formal work order for the work of Supply and delivery of Cutting tools, Lubricants etc for KLR Rig machine in connection with Jal Jeevan Mission programme at Jhargram under Bankura Mechanical Division ,PHE Dte. | 23.85 |
9 | Bankura Mechanical Division | ORD/000608/2023-2024 | 12/09/2023 | 2082/BMD | RABINDRA NATH KHAN | Acceptance cum Formal work order for the work of Providing and installation of pumping machineries and other electro mechanical accessories for Augmentation of Lachiapur (Zone-D) under Khatra-Hirbandh-Ranibandh water supply scheme (BRGF-Ph-I) under und | 61.40 |
Total | 374.6 |