Sl No. | District
As per Census (2011)
|
Block
As per Census (2011)
|
Division
Working Divisions
|
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
|
Scheme Category
Category of Scheme as per PHED-MIS
|
Work Name
Name of the Work as per the Issued Work Order
|
Name of AE entrusted | Name of JE entrusted | System Order No.
System Order Number
|
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
|
WO Date
Date of Issuance of Work Order
|
Days of Completion
Target Days for Work Completion as per PHED-MIS
|
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
|
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
|
Payment
Amount of Payment made for this Work Order as per PHED-MIS
|
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
|
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
|
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
10 | 244.24 | 174.14 | 71.3 | ||||||||||||||
1 | PASCHIM BARDHAMAN | Kanksa | Durgapur W/S Division | DANDESHWAR PIPED WATER SUPPLY SCHEME. , SM/11282 | New | Acceptance cum formal order for the work Sinking of 2 Nos tube well 250 mm X 150 mm tube well 120 mtr depth by Direct rotary Rig method using PVC pipe and prepacked resin bonded gravel filter for Dandeswar piped W/s Scheme under DWSD ,PHE Dte (SL-03) | ORD/000224/2022-2023 | 1240/DWSD | 18/08/2022 | 15 | M/S BADAL GHOSH | 14.75 | 13.30 | 90.17 | 0 | ||
2 | PASCHIM BARDHAMAN | Kanksa | Durgapur W/S Division | DANDESHWAR PIPED WATER SUPPLY SCHEME. , SM/11282 | New | New service connection charges for Dandeswar piped Water supply scheme TW-I | BILL/00062/2023-2024 | BP-2023-24-37 | 01/06/2023 | WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED | 0.62 | 0.00 | 0 | 0 | |||
3 | PASCHIM BARDHAMAN | Kanksa | Durgapur W/S Division | DANDESHWAR PIPED WATER SUPPLY SCHEME. , SM/11282 | New | Electricity service charges for Kanchanpur TW-III under Kanksa block of Dandeswar piped W/s Scheme | BILL/00158/2023-2024 | BP-2023-24-99 | 24/07/2023 | WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED | 2.67 | 0.00 | 0 | 0 | |||
4 | PASCHIM BARDHAMAN | Kanksa | Durgapur W/S Division | DANDESHWAR PIPED WATER SUPPLY SCHEME. , SM/11282 | New | Electricity service charges for Dandeswar TW-II under Dandeswar piped W/s Scheme | BILL/00159/2023-2024 | BP-2023-24-100 | 24/07/2023 | WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED | 2.83 | 0.00 | 0 | 0 | |||
5 | PASCHIM BARDHAMAN | Kanksa | Central Mechanical | DANDESHWAR PIPED WATER SUPPLY SCHEME. , SM/11282 | New | Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Dandeshwar Water Supply Scheme under CMD, PHE Dte., Dist.- Paschim-Bardhaman. | ASSISTANT ENGINEER | Junior Engineer | ORD/000008/2023-2024 | 1654/CMD | 06/04/2023 | 30 | P.K. ENGINEERING | 21.21 | 20.57 | 96.98 | 80 |
6 | PASCHIM BARDHAMAN | Kanksa | Durgapur W/S Division | DANDESHWAR PIPED WATER SUPPLY SCHEME. , SM/11282 | New | 1 (One) No Trial bore by DR method using rig machine at Dwandeswar ,Block-Kanksa under Augmentation of Dandeswar PWSS under DWSD,PHE Dte | ORD/000214/2023-2024 | 1446/DWSD | 25/08/2023 | 15 | M/S BADAL GHOSH | 1.00 | 1.00 | 100 | 100 | ||
7 | PASCHIM BARDHAMAN | Kanksa | Durgapur W/S Division | DANDESHWAR PIPED WATER SUPPLY SCHEME. , SM/11282 | New | Formal order for the work of laying distribution system rising main construction of 150 M3 reservoir with 20 mtrs staging height including soil investigation construction of Pump house (5.4 m X 3.60 m) with sanitary and water supply arrangement and construction of pump house(3.60 X 3.00 m) with FHTC for Dandeswar water Supply schme under DWSD ,PHE Dte (NS) | ORD/000264/2022-2023 | 1614/DWSD | 21/11/2022 | 360 | POWER TOOLS AND ENGINEERING | 164.79 | 139.27 | 84.51 | 80 | ||
8 | PASCHIM BARDHAMAN | Kanksa | Durgapur W/S Division | DANDESHWAR PIPED WATER SUPPLY SCHEME. , SM/11282 | New | Material Requisition To Resource Division | RTOR000006/2022-2023 | 255/B/DWSD | 15/02/2023 | Resource Division | 4.24 | 0.00 | 0 | 0 | |||
9 | PASCHIM BARDHAMAN | Kanksa | Durgapur W/S Division | DANDESHWAR PIPED WATER SUPPLY SCHEME. , SM/11282 | New | Material Requisition To Resource Division | RTOR000003/2022-2023 | 1229/DWSD | 17/08/2022 | Resource Division | 25.24 | 0.00 | 0 | 0 | |||
10 | PASCHIM BARDHAMAN | Kanksa | Durgapur W/S Division | DANDESHWAR PIPED WATER SUPPLY SCHEME. , SM/11282 | New | Acceptance cum formal order for the work of Construction of 5.40 X3.60 mtr switch room with plinth height (600X 2000 mm) with sanitary and water supply arrangement at PH No-2 TW No-2 site at Akandara under Jemua piped W/S Scheme under DWSD ,PHE Dte | ORD/000514/2022-2023 | 331/DWSD | 20/02/2023 | 20 | MOTIONMASS TECHNO (OPC) PVT LTD | 6.89 | 0.00 | 0 | 100 | ||
Total | 244.23 | 174.14 | 71.3 |