Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 294.58 226.54 76.9  
1 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Shyambazar Piped water Supply Scheme , SM/11228 New Acceptance cum formal order for the work of Sinking of 2 Nos tube well 250 mm X 150 mm tube well 120 mtr depth by Direct rotary Rig method using PVC pipe and prepacked resin bonded gravel filter for Shyambazar piped W/s Scheme under DWSD ,PHE Dte (SL-01) ORD/000222/2022-2023 1233/DWSD 17/08/2022 15 M/S. D. PALIT & CO. 14.76 13.63 92.34 0
2 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Shyambazar Piped water Supply Scheme , SM/11228 New Quotation for Shyambazar W/S Scheme, P.H. No - 02, Panagarh CCC BILL/00179/2022-2023 BP-2022-23-331 15/03/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 2.36 0.00 0 0
3 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Shyambazar Piped water Supply Scheme , SM/11228 New Quotation for Shyambazar W/S Scheme , Pump House No- 01 , Panagarh CCC BILL/00208/2022-2023 BP-2022-23-340 17/03/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 3.65 0.00 0 0
4 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Shyambazar Piped water Supply Scheme , SM/11228 New Acceptance cum formal order for the work of Route survey and preparation of DPR for Augmentation of Shyambazar ,Telipara piped W/s Scheme under DWSD, PHE Dte ORD/000564/2022-2023 527/DWSD 29/03/2023 15 MEASURE LAND 5.00 5.00 100 0
5 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Shyambazar Piped water Supply Scheme , SM/11228 New Formal order for the work of laying distribution system ,rising main construction of 150 M3 with 20 mtr staging height including soil investigation construction of Pump house (5.4X3.6 m) with sanitary and Water supply arrangement and construction of pump house (3.6X3.00 mtr) for Shyambazar W/s Scheme under DWSD ,PHE Dte (New Scheme) ORD/000267/2022-2023 1648/DWSD 02/12/2022 360 DUTTA ENTERPRISE 213.72 194.67 91.09 85
6 PASCHIM BARDHAMAN Kanksa Central Mechanical Shyambazar Piped water Supply Scheme , SM/11228 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 2 at Shambazar Water Supply Scheme under CMD, PHE Dte., Dist.- Paschim-Bardhaman. ORD/000006/2023-2024 1580/CMD 04/04/2023 30 A.S. ENTERPRISE 9.30 8.81 94.73 100
7 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Shyambazar Piped water Supply Scheme , SM/11228 New Material Requisition To Resource Division RTOR000004/2022-2023 1231/DWSD 17/08/2022 Resource Division 31.17 0.00 0 0
8 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division Shyambazar Piped water Supply Scheme , SM/11228 New Material Requisition To Resource Division RTOR000007/2022-2023 255/C/DWSD 15/02/2023 Resource Division 5.32 0.00 0 0
9 PASCHIM BARDHAMAN Kanksa Central Mechanical Shyambazar Piped water Supply Scheme , SM/11228 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Shambazar Water Supply Scheme under CMD, PHE Dte., Dist.- Paschim-Bardhaman. ORD/000005/2023-2024 1579/CMD 04/04/2023 30 MS DAS ELECTRIC CO 9.30 4.43 47.63 100
Total 294.58 226.54 76.9