Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 772.78 528.74 68.42  
1 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division BAMUNARA PIPED WATER SUPPLY SCHEME. , SM/11227 New Acceptance cum formal order for the work of Sinking of 2 Nos tube well 250 mm X 150 mm tube well 120 mtr depth by Direct rotary Rig method using PVC pipe and prepacked resin bonded gravel filter for Bamunara piped W/s Scheme under DWSD ,PHE Dte (SL-05) ORD/000226/2022-2023 1242/DWSD 18/08/2022 15 AHS R INFRA PRIVATE LIMITED 14.76 13.36 90.51 0
2 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division BAMUNARA PIPED WATER SUPPLY SCHEME. , SM/11227 New Acceptance cum formal order for the work of Route survey and preparation of DPR for Augmentation of Bistupur ,Bamunara piped W/s Scheme under DWSD, PHE Dte ORD/000563/2022-2023 526/DWSD 29/03/2023 15 MEASURE LAND 8.11 7.62 93.96 0
3 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division BAMUNARA PIPED WATER SUPPLY SCHEME. , SM/11227 New Service charges for new electricity connection at BamunnaraH/W site under Bamunara piped W/S Scheme BILL/00154/2023-2024 BP-2023-24-95 24/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 2.76 0.00 0 0
4 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division BAMUNARA PIPED WATER SUPPLY SCHEME. , SM/11227 New Electricity Service connection for Bamunnara TW-II H/W site under Bamunnara piped W/s Scheme BILL/00155/2023-2024 BP-2023-24-96 24/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 2.35 0.00 0 0
5 PASCHIM BARDHAMAN Kanksa Central Mechanical BAMUNARA PIPED WATER SUPPLY SCHEME. , SM/11227 New Supply & Installation of Submersible Pumping Machinery, Voltages Stabilizer , Chlorination system and internal House wiring for Tube well for Tube well no:- 1 & 2 at Bamunara water supply scheme under CMD PHE Dte, Dist: Paschim Bardhaman. Driller In-Charge Junior Engineer ORD/000009/2023-2024 1656/CMD 06/04/2023 30 D.K. ELECTRIC 22.77 22.04 96.79 100
6 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division BAMUNARA PIPED WATER SUPPLY SCHEME. , SM/11227 New Material Requisition To Resource Division RTOR000002/2022-2023 1230/DWSD 17/08/2022 Resource Division 46.44 0.00 0 0
7 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division BAMUNARA PIPED WATER SUPPLY SCHEME. , SM/11227 New Material Requisition To Resource Division RTOR000008/2022-2023 255/D/DWSD 15/02/2023 Resource Division 17.04 0.00 0 0
8 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division BAMUNARA PIPED WATER SUPPLY SCHEME. , SM/11227 New Formal order for the work of Supplying, laying and aligning of HDPE distribution pipe line and allied works construction 400 M3 OHR with 20 mtr staging height including soil investigation and construction of pump house (5.40 m X 3.60 m) with sanitary and water supply arrangement and construction of pump house (3.60X3.00 m) with FHTC for Bamunara piped water Supply scheme under DWSD ,PHE Dte (NS) ORD/000265/2022-2023 1438/DWSD 13/10/2022 360 HANNAN BUILDERS PVT. LTD. 658.55 485.72 73.76 85
Total 772.78 528.74 68.42