Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
36 902.98 661.37 73.24  
1 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Formal order for the work of Supplying ,laying and aligning of HDPE distribution pipe line and allied works at Railpar Saradapally Mouza under command area of Augmentation of Kanksa (Zone-II/D) under DWSD ,PHE Dte (Part-D) (SL-02) ORD/000389/2021-2022 187/DWSD 15/02/2022 30 SAIKAT RAY 85.77 87.48 101.99 0
2 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Formal order for the work of Supplying, laying and aligning of HDPE distribution pipe line and allied works at Rail par Sarada Pally of Prayagpur Mouza under command area of Augmentation of Kanksa (Zone-II/D) W/S Scheme under DWSD ,PHE Dte (Part-C)(SL-01) ORD/000388/2021-2022 185/DWSD 11/02/2022 30 MD AAMIR KHAN 80.93 77.31 95.53 0
3 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Acceptance cum formal order for the work of Construction of pump house cum chlorine room at Railpar Sarada Pally H/W site pump house No-3 tube well No-03(for Augmentation of Kanksa (Zone-II/D) pipe W/s Scheme under DWSD ,PHE Dte (SL-03) ORD/000402/2021-2022 242/DWSD 25/02/2022 45 CHATTERJEE CONSTRUCTION 4.89 3.76 76.89 0
4 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Formal order for the work Sinking of 1No(300X200 mm) dia tube well 210 mtr deep by direct rotary method using PVC pipe and fibber glass reinforced epoxy resin slotted at Tube well No-03 site at Railpar Saradapally near DVC branch canal for Augmentation of ground water base Kanksa (Zone-II/D) piped W/s Scheme under DWSD ,PHE Dte. ORD/000399/2021-2022 188/DWSD 15/02/2022 30 AHS R INFRA PRIVATE LIMITED 10.30 10.26 99.61 0
5 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Formal order for the work of Sinking of 1No(300X200 mm) dia tube well 210 mtr deep by direct rotary method using PVC pipe and fibber glass reinforced epoxy resin slotted at Tube well No-01 site at Railpar Saradapally near DVC branch canal for Augmentation of ground water base Kanksa (Zone-II/D) piped W/s Scheme under DWSD ,PHE Dte. ORD/000397/2021-2022 202/DWSD 17/02/2022 30 JOY GURU ENTERPRISE 10.30 10.26 99.61 0
6 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Acceptance cum formal order for the work of Additional bore for sinking of 01 Nos (300X200 mm dia) tube well of 210 mtr deep by DR drilling method using PVC pipe and fiber glass reinforced epoxy resin slotted at Tube well No-I at Railpar Sarod Pally near DVC branch canal under Augmentation of Kanksa (Zone-II/Part-D) piped W/s Scheme under DWSD ,PHE Dte.(SL-01) ORD/000455/2021-2022 376/DWSD 24/03/2022 7 JOY GURU ENTERPRISE 4.40 2.92 66.36 0
7 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Acceptance cum formal order for the work of Additional bore for sinking of 01 Nos (300X200 mm dia) tube well of 210 mtr deep by DR drilling method using PVC pipe and fiber glass reinforced epoxy resin slotted at Tube well No-III at Railpar Sarada Pally near DVC branch canal under Augmentation of Kanksa (Zone-II/Part-D) piped W/s Scheme under DWSD ,PHE Dte.(SL-03) ORD/000457/2021-2022 378/DWSD 24/03/2022 7 AHS R INFRA PRIVATE LIMITED 4.40 3.29 74.77 0
8 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Formal order for the work of Sinking of 1No(300X200 mm) dia tube well 210 mtr deep by direct rotary method using PVC pipe and fibber glass reinforced epoxy resin slotted at Tube well No-02 site at Railpar Saradapally near DVC branch canal for Augmentation of ground water base Kanksa (Zone-II/D) piped W/s Scheme under DWSD ,PHE Dte. ORD/000398/2021-2022 198/DWSD 16/02/2022 30 RANJIB GHATAK 10.30 10.26 99.61 0
9 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Acceptance cum formal order for the work of Additional bore for sinking of 01 Nos (300X200 mm dia) tube well of 210 mtr deep by DR drilling method using PVC pipe and fiber glass reinforced epoxy resin slotted at Tube well No-II at Railpar Sarada Pally near DVC branch canal under Augmentation of Kanksa (Zone-II/Part-D) piped W/s Scheme under DWSD ,PHE Dte. (SL-02) ORD/000456/2021-2022 377/DWSD 24/03/2022 7 RANJIB GHATAK 4.39 3.78 86.1 0
10 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Formal order for the work of Supplying, laying and aligning of 160 mm dia HDPE distribution pipe line and allied works at Railpar Saradapally of Prayagpur mouza under command areas under Augmentation of Kanksa (Zone-II/Part-D) piped W/s Scheme under DWSD, PHE Dte (SL-05) ORD/000102/2022-2023 752/DWSD 11/05/2022 15 SAIKAT RAY 16.19 16.06 99.2 0
11 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Formal order for the work of Supplying ,laying and aligning of HDPE distribution pipe line and allied works at Railpar Saradapally Mouza under command area of Augmentation of Kanksa (Zone-II/D) under DWSD ,PHE Dte (Part-B) ORD/000393/2021-2022 201/DWSD 17/02/2022 30 AMARANJALI CONSTRUCTION 94.15 75.19 79.86 0
12 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Formal order for the work of Providing functional house hold tap connection (FHTC) in connection with JJM at Railpar Nepali Para of Prayagpur Mouza(JL-89) under command area of Augmentation of Kanksa (Zone-II /P-D) piped W/s Scheme (SL-01) ORD/000108/2022-2023 747/DWSD 10/05/2022 10 MAK CONSTRUCTION CO. 37.33 25.10 67.24 0
13 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Acceptance cum formal order for the work of Additional work for supplying laying and aligning of HDPE distribution pipe line and allied works at Railpar Sarada Pally of Prayagpur Mouza under command area of Augmentation of Kanksa (Zone-II/D) piped W/S Scheme under DWSD,PHE Dte (Part-C) (SL-05) ORD/000132/2022-2023 819/DWSD 23/05/2022 30 MD AAMIR KHAN 76.63 71.97 93.92 0
14 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Quotation for Kanksa Zone-II/Part-D Pump house no -01 VCH/000229/2022-2023 BP-2022-23-100 14/06/2022 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 7.77 0.00 0 0
15 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Quotation for Kanksa Zone-II/Part-D Pump house no -01 VCH/000229/2022-2023 BP-2022-23-100 14/06/2022 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 7.77 0.00 0 0
16 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Quotation for Kanksa Zone-II/Part-D Pump house no -02 VCH/000230/2022-2023 BP-2022-23-101 14/06/2022 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.40 0.00 0 0
17 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Quotation for Kanksa Zone-II/Part-D Pump house no -03 VCH/000231/2022-2023 BP-2022-23-102 14/06/2022 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.40 0.00 0 0
18 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Acceptance cum formal order for the work of Additional FHTC work at Kanksa block and supplying laying and aligning of HDPE distribution pipe line and allied works at Railpar Sarada Pally and Prayagpur Mouza under command area of Augmentation of Kanksa (Zone-II/Part-D) Piped W/s Scheme under DWSD ,PHE Dte. (SL-04) ORD/000129/2022-2023 816/DWSD 21/05/2022 30 SAIKAT RAY 80.17 76.74 95.72 0
19 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Formal order for the work of Making of concrete RCC pier and supplying laying of MS water carrier pipe and 600 mm dia NP 3 Hume pipe with crossing of road and culvert of distribution system Kanksa (Zone--II/D) at Railpar Sarada Pally of Prayagpur mouza under command area of Augmentation of Kanksa (Zone-II/D W/s Scheme under DWSD ,PHE Dte (Part-C) ORD/000179/2022-2023 1159/DWSD 01/08/2022 30 MD AAMIR KHAN 44.11 44.28 100.39 0
20 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Acceptance cum formal order for the work of Additional work for providing FHTC tap connection with JJM at Panagarh mouza-88 and its adjoing area under command area of Augmentation of Kanksa (Zone-II/Part-D) piped W/s Scheme under DWSD, PHE Dte (SL-06) ORD/000168/2022-2023 1026/DWSD 04/07/2022 10 QUICK PAL SUPPLIERS 4.89 4.89 100 0
21 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Continuation order for the work of soil investigation for demining the safe bearing capacity and other relevant parameters of soil for the work of construction of RCC Elevated at Sarada Pally reservoir site of Augmentation of Kaksa Zone-II/D piped W/s Scheme under DWSD ,.PHE Dte ORD/000469/2021-2022 287/DWSD 08/03/2022 25 MABCO CONSULTANT 1.20 1.20 100 0
22 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Acceptance cum formal order for the work of Sinking of 1 Nos tube well 300 mm X 200 mm tube well 150 mtr depth by Direct rotary Rig method using PVC pipe and fiber galss reinforced epoxy resin slotted at existing tube well no-02 at near Railine under Augmentation of Kanksa (Z-II/Part-D) piped W/s Scheme under DWSD ,PHE Dte (SL-13) ORD/000232/2022-2023 1262/DWSD 25/08/2022 15 JOY GURU ENTERPRISE 10.99 10.48 95.36 0
23 PASCHIM BARDHAMAN Central Mechanical Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 at Augmentation of Kanksa [Zone-II / D ] Water Supply Scheme under CMD, PHE Dte., Dist.- Paschim -Bardhaman. ORD/000001/2022-2023 732/CMD 29/04/2022 30 JAGANNATH ENTERPRISE 9.67 9.44 97.62 0
24 PASCHIM BARDHAMAN Central Mechanical Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-2 at Augmentation of Kanksa [Zone-II / D ] Water Supply Scheme under CMD, PHE Dte., Dist.- Paschim-Bardhaman ORD/000017/2022-2023 912/CMD 31/05/2022 30 DELTA ENGINEERING ENTERPRISE 9.88 9.72 98.38 0
25 PASCHIM BARDHAMAN Central Mechanical Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-3 at Augmentation of Kanksa [Zone-II / D ] Water Supply Scheme under CMD, PHE Dte., Dist.- Paschim -Bardhaman. ORD/000668/2022-2023 733/CMD 29/04/2022 30 CHATTERJEE ENTERPRISE 9.65 9.40 97.41 0
26 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Formal for the work of Extension of pipe line from exisitng pipe line of Kanksa (Zone-II) (Ph-II) W/S scheme at Panagarh Bazar and east canal par in Kanksa block to providing FHTC at Kanksa mouza(JL-89) under DWSD PHE Dte ORD/000310/2021-2022 1773/DWSD 20/12/2021 30 M/S PIONEER CONSTRUCTION 13.23 13.02 98.41 0
27 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Acceptance cum formal work order for the work of providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JIM) for Kanksa (CT) mouza (JL-86) (Pt-B) under command area of Kanksa Zone-II (Ph-I) W/S Scheme at Kanksa Block under Durgapur W/S Division, PHE Dte (SL-03) ORD/000307/2020-2021 1433/DWSD 28/12/2020 60 SUJAY KUMAR RAY 42.78 39.52 92.38 0
28 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Acceptance cum formal work order for the work of Providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JIM) for Kanksa (CT) mouza (JL-86) (Pt-C) under command area of Kanksa Zone-II (Ph-I) W/S Scheme at Kanksa Block under Durgapur W/S Division, PHE Dte ORD/000309/2020-2021 1435/DWSD 28/12/2020 60 ASHOK KUMAR GHOSH 42.78 28.48 66.57 0
29 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Continuation order for the work of supplying fitting fixing and installation of Sluice Valve for O & Mtc of Kanksa (Zone-II/II) piped W/s Scheme of command areas of Panaghar ,Prayagpur mouza under DWSD, PHE Dte ORD/000117/2022-2023 682/DWSD 27/04/2022 15 TARA CONSTRUCTION 4.94 0.00 0 0
30 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Formal order for the work of Laying and aligning of DI K9 rising main pipe line supplying DI specials ,valves and allied work under command area of Kanksa under Augmentation of Kanksa (Zone-II/Part-D) piped W/s Scheme under DWSD, PHE Dte (SL-04) ORD/000101/2022-2023 751/DWSD 11/05/2022 7 CHATTERJEE CONSTRUCTION 9.77 1.88 19.24 0
31 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Formal order for the work of Construction of 400 M3 capacity ,20 mtr staging height of RCC OHR for Kanksa Zone-II/Part-D piped W/s Scheme under DWSD,PHE Dte(SL-03) ORD/000098/2022-2023 788/DWSD 18/05/2022 184 RANJIB GHATAK 88.59 0.00 0 0
32 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Acceptance cum formal order for the work of Construction of pump house cum chlorine room at Railpar Sarada Pally H/W site pump house No-1 tube well No-01(OHR) for Augmentation of Kanksa (Zone-II/D) pipe W/s Scheme under DWSD ,PHE Dte (SL-01) ORD/000400/2021-2022 240/DWSD 25/02/2022 45 GHOSH & ROY ENTERPRISE 4.89 4.76 97.34 100
33 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Material Requisition To Resource Division RTOR000012/2021-2022 329/DWSD 15/03/2022 Resource Division 54.59 0.00 0 0
34 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Acceptance cum formal order for the work of Construction of pump house cum chlorine room at Railpar Sarada Pally H/W site pump house No-2 tube well No-02 for Augmentation of Kanksa (Zone-II/D) pipe W/s Scheme under DWSD ,PHE Dte (SL-02) ORD/000401/2021-2022 241/DWSD 25/02/2022 45 MUKHERJEE ENTERPRISE 4.89 3.76 76.89 100
35 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Acceptance cum Formal work-Order for the work of ---Sanitary arrangement and plumbing works at Sarada Pally H/W Site Pump house No-3 for Augmentation of Kanksa (Zone-II/D) pipe W/S Scheme under DWSD,PHE Dte (SL-04) ORD/000197/2022-2023 1054/DWSD 07/07/2022 25 CHATTERJEE CONSTRUCTION 4.82 3.08 63.9 100
36 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) , SM/10210 Augmentation Acceptance cum formal order for the work of Sanitary arrangement and plumbing works plinth protection ,roof treatment ,drain and other allied works at Sarada Pally H/W Site Pump house No-1 &T.W-01(OHR site) for Augmentation of Kanksa (Zone-II/D) pipe W/S Scheme under DWSD,PHE Dte (SL-05) ORD/000198/2022-2023 1060/DWSD 08/07/2022 25 GHOSH & ROY ENTERPRISE 4.82 3.08 63.9 100
Total 902.93 661.34 73.24