Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
74 3,748.85 2,174.13 57.99  
1 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Continuation work order for Laying 450 mm dia MS water pipe line with 700 mm dia MS casing pipe for Railway crossing in Salanpur at KM SLS/1136 and SLS/1138 on Bemjomary siding Railway line in Asansol Division under JJM under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000604/2023-2024 3297/RCD-I 10/11/2023 15 MD AAMIR KHAN 24.44 23.98 98.12 100
2 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Acceptance cum work order for Emergency repairing of 50 sqmm x 4 core Al Armoured damaged cable line and other allied Electrical works at Executive Engineer office building, SE office building, rest room & B type quarter under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000722/2023-2024 3573_RCD/1 12/12/2023 15 T R ENTERPRISE 6.82 6.80 99.71 100
3 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Continuation order for Hiring of Diesel driven Maxi cabs for official use of the Assistant Engineer-I under Asansol Mechanical Division, P.H Engineering. Dte. Assistant Engineer-I Junior Engineer-3 ORD/000087/2023-2024 1091/AMD 25/04/2023 365 EASTERN INDIA SALES AND SERVICE 1.79 0.84 46.93 83
4 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Continuation order for Hiring of Diesel driven Maxi cabs for official use of the Assistant Engineer-II under Asansol Mechanical Division, P.H Engineering. Dte. Assistant Engineer-II Junior Engineer-3 ORD/000088/2023-2024 1092/AMD 25/04/2023 365 EASTERN INDIA SALES AND SERVICE 1.79 0.88 49.16 83
5 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Continuation order for Hiring of Diesel driven Maxi cabs for official use of the Executive Engineer under Asansol Mechanical Division, P.H Engineering. Dte. Assistant Engineer-I Junior Engineer-3 ORD/000089/2023-2024 1099/AMD 26/04/2023 365 SUNRISE ENGINEERING CORPORATION 1.79 0.87 48.6 67
6 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Providing & Installation of Electrical Equipments For Sub-Station at Mohishila Boosting Station (GLR-I & II), Searsole Boosting Station (GLR-I & II), Sankarpur Clear Water Boosting Station and Banshra Clear Water Boosting Station and Gaseous Chlorination system at different OHR sites with illumination under Augmentation of RCFA Part-II Piped Water Supply Scheme. Assistant Engineer-I Junior Engineer-3 ORD/000203/2023-2024 1492/AMD 04/08/2023 366 ORIENTAL ENGINEERING CO. 1,965.22 1,393.70 70.92 71
7 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Acceptance cum work order for Laying of pipe line from Domhani Asansol main Road near BDO Office to Domohani PHC and construction of stand post at different places at Domohani Bazar under Barabani Development Block under RCFA Part-I W/S Scheme under RCFA Division-I PHE Dte. Assistant Engineer 2 ORD/000966/2023-2024 458/RCD-1 12/02/2024 20 UNITED CONSTRUCTION 6.71 4.03 60.06 62
8 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Acceptance cum work order for Emergency repairing work of CI rising main (500 mm dia, 200 mm dia & 150 mm dia ) at Chotdola more, Dhasal more and new Kenda and Searsole H/W site near Pump House under RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte. Assistant Engineer 2 ORD/000958/2023-2024 504/RCD-I 12/02/2024 30 DAWN CONSTRUCTION 8.84 0.00 0 0
9 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Acceptance cum Work Order for Additional for Distribution Network for Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Part-4) Block-Andal, Dist-Paschim Bardhaman under RCFA Div-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000051/2024-2025 1741/RCD-I 18/07/2024 45 UNITED CONSTRUCTION 30.14 29.22 96.95 85
10 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Acceptance cum work order for Supply of GI pipes to Searsole Store under Augmentation of RCFA Part-II (Zone-17) PWSS under RCFA Division-I PHE Dte. Junior Engineer ORD/000914/2023-2024 217/RCD-I 29/01/2024 20 MAKALI ENGINEERING CORPORATION 90.40 90.40 100 100
11 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Acceptance cum work order for Supply of GI pipes to Searsole Store under Augmentation of RCFA Part-II (Zone-15) PWSS under RCFA Division-I PHE Dte. Junior Engineer ORD/000912/2023-2024 216/RCD-I 29/01/2024 20 INDIA PIPE FITTING CO 89.25 89.23 99.98 100
12 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Laying of 110 mm dia HDPE pipeline including pushing of 600 mm dia RCC (NP3) hume pipe by adopting trench less technology at Health World Hospital, Asansol Paschim Bardhaman under RCFA Division-I PHE Dte. Extension work. Assistant Engineer 2 Junior Engineer ORD/001020/2023-2024 Camp-02_Health_World_AE-I 21/02/2024 20 M/S CHANDI CHARAN ROY 18.54 18.06 97.41 100
13 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Balance work in connection with Improvement of RCFA Part-I Water Supply Scheme within command area of Zone-V with LDS and FHTC work under RCFA Division-I PHE Dte. Assistant Engineer 2 ORD/000950/2023-2024 455/RCD-1 12/02/2024 45 MRITYUNJOY MUKHERJEE & CO. 21.29 19.26 90.47 100
14 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Laying 300 mm dia MS water pipe line with 600 mm dia MS cashing pipe for Railway crossing in Salanpur in between KM 231/16-18 and Salanpur (SLS) Rupnarayanpur (RNPR) Station in Asansol Diviion under JJM under RCFA Division-I PHE Dte. Assistant Engineer 2 ORD/000956/2023-2024 456/RCD-1 12/02/2024 45 MRITYUNJOY MUKHERJEE & CO. 37.06 36.88 99.51 100
15 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Acceptance cum work order for Adopting trench less technology (e.g. Jack Pushing Method etc.) at 3 (Three) nos location within laying distribution system of Amritnagar (Part-B) under Augmentation of Amritnagar Zone-I PWSS under RCFA Division-I PHE Dte. Assistant Engineer 2 ORD/000963/2023-2024 457/RCD-1 12/02/2024 45 M/S SINGH & KONAR CONSTRUCTION 23.02 23.02 100 100
16 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Allied work Balance Work of Road restoration in connection with formal work order Distribution network including FHTC and allied work at Ondal Block of Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II under RCFA Division-I PHE Dte. Assistant Engineer 1,Assistant Engineer 2 Junior Engineer ORD/000938/2023-2024 452/RCD-1 12/02/2024 45 MRITYUNJOY MUKHERJEE & CO. 43.94 38.19 86.91 100
17 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Acceptance cum Work Order for Supply and erection of Information Boards (31 nos) having M.S Channel/Angle posts and 1.5 mm thick M.S synthetic enamel paint over a coat of red oxide primer including lettering complete at different places under Salanpur ,Barabani, Andal ,Pandabeswar ,Raniganj and Durgapur Faridpur Block Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II under RCFA Division-I PHE Dte. Assistant Engineer 2,Assistant Engineer 4 Junior Engineer ORD/000056/2024-2025 1746/RCD-I 18/07/2024 15 UTTAR DINAJPUR ANKUR GRAM UNNAYAN SOCIETY 6.10 5.12 83.93 100
18 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Acceptance cum Work Order for Supply and erection of Information Boards(43 nos)having M.S Channel/Angle posts and 1.5 mm thick M.S synthetic enamel paint over a coat of red oxide primer including lettering complete at different places under Jamuria Block Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II under RCFA Division-I PHE Dte. Assistant Engineer 2,Assistant Engineer 4 Junior Engineer ORD/000058/2024-2025 1748/RCD-I 18/07/2024 15 UNITED CONSTRUCTION 8.48 7.78 91.75 100
19 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Acceptance cum work order for construction work and Interior Decoration of Office Building in Asansol under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II under RCFA Division-I PHE Dte. Assistant Engineer 2,Assistant Engineer 4 Junior Engineer,Junior Engineer 10 ORD/000209/2024-2025 2513/RCD-I 04/10/2024 45 M/S KALYANI ENTERPRISE 41.78 5.37 12.85 100
20 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Acceptance cum Work Order for Protecting apparatus of collecting main including other allied works under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000059/2024-2025 1751/RCD-I 18/07/2024 20 INDIA PIPE FITTING CO 93.63 93.56 99.93 100
21 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Acceptance cum work order for Providing of different dia of water regulating apparatus and other allied works (Part-A) under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II under RCFA Division-I PHE Dte. Assistant Engineer 3 Junior Engineer 7 ORD/000196/2024-2025 2451/RCD-I 30/09/2024 15 MAKALI ENGINEERING CORPORATION 78.04 78.04 100 100
22 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Acceptance cum work order for Construction of Visiter room and driver rest room at office premises Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer 12 ORD/000120/2024-2025 2155/RCD-I 29/08/2024 90 G. CONSTRUCTION 18.48 15.51 83.93 100
23 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Acceptance cum work order for Protecting apparatus of collecting main including other allied works under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000050/2024-2025 1750/RCD-I 18/07/2024 20 MAKALI ENGINEERING CORPORATION 94.91 94.91 100 100
24 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Material Requisition To Resource Division RTOR000001/2024-2025 1178/RCD-I 03/04/2024 0 Resource Division 337.92 0.00 0 0
25 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Quotation for Earnest Money Deposit at Sankarpur Boosting Station, Chhora under Augmentation of RCFA II WS Scheme. BILL/00694/2023-2024 BP-2023-24-63 28/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.05 0.00 0 0
26 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Way leave / Track crossing proposal with Application ID : ER-ASN-2023-WL-67 dt 09.02.2024 under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) under RCFA Division-I PHE Dte. BILL/01361/2023-2024 560/23-24 20/02/2024 0 EASTERN RAILWAY 10.41 0.00 0 0
27 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Way leave / Track crossing proposal with Application ID : ER-ASN-2023-WL-71 dt 09.02.2024 under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) under RCFA Division-I PHE Dte. BILL/01363/2023-2024 562/23-24 20/02/2024 0 EASTERN RAILWAY 7.84 0.00 0 0
28 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Way leave / Track crossing proposal with Application ID : ER-ASN-2023-WL-65 dt 09.02.2024 under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) under RCFA Division-I PHE Dte. BILL/01364/2023-2024 563/23-24 20/02/2024 0 EASTERN RAILWAY 17.21 0.00 0 0
29 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Fuel Bill for Diesel Driven Maxi Cab for Official Use of The AE-II, under AMD, PHE Dte for the month of April, 2024. BILL/00461/2024-2025 BP-2024-25-33/3 23/08/2024 0 RANAJIT AUTO 0.15 0.00 0 0
30 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Earnest Money Deposit for Bulk Power Supply at Intake sub-station Sarkuri Salanpur under Augmentation of RCFA Part II WS Scheme. BILL/00697/2023-2024 BP-2023-24-66 02/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.05 0.00 0 0
31 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Quotation for Earnest Money Deposit at Bansra Boosting Station, Kunustoria under Augmentation of RCFA II WS Scheme. BILL/00692/2023-2024 BP-2023-24-61 28/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.05 0.00 0 0
32 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Way leave / Track crossing proposal with Application ID : ER-ASN-2023-WL-69 dt 09.02.2024 under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) under RCFA Division-I PHE Dte. BILL/01362/2023-2024 561/23-24 20/02/2024 0 EASTERN RAILWAY 6.97 0.00 0 0
33 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Way leave / Track crossing proposal with Application ID : ER-ASN-2023-WL-68 dt 09.02.2024 under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) under RCFA Division-I PHE Dte. BILL/01366/2023-2024 565/23-24 20/02/2024 0 EASTERN RAILWAY 6.97 0.00 0 0
34 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Way leave / Track crossing proposal with Application ID : ER-ASN-2023-WL-66 dt 09.02.2024 under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) under RCFA Division-I PHE Dte. BILL/01359/2023-2024 559/23-24 20/02/2024 0 EASTERN RAILWAY 16.52 0.00 0 0
35 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Shifting of overhead line inside the premises of benali boosting station BILL/00075/2024-2025 BP-2024-25-14 17/05/2024 0 INDIA POWER CORPN. LTD. 2.84 0.00 0 0
36 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Way leave / Track crossing proposal with Application ID : ER-ASN-2023-WL-91 dt 07.03.2024 under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) under RCFA Division-I PHE Dte. BILL/01539/2023-2024 624/23-24 14/03/2024 0 EASTERN RAILWAY 0.09 0.00 0 0
37 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Fuel Charges for the Cab of AE-I under AMD, PHE Dte. for the month of JANUARY, 2024 BILL/00310/2024-2025 BP-2024-25-30 06/08/2024 0 RANAJIT AUTO 0.26 0.00 0 0
38 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Fuel Bill for the Cab of The Executive Engineer, under AMD, PHE Dte., for the month of March,2024. BILL/00471/2024-2025 BP-2024-25-34/5 23/08/2024 0 RANAJIT AUTO 0.25 0.00 0 0
39 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Fuel Charges for the Cab of AE-II under AMD, PHE Dte. for the month of NOVEMBER, 2023. BILL/00313/2024-2025 BP-2024-25-27 30/07/2024 0 RANAJIT AUTO 0.20 0.00 0 0
40 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Fuel Charges for the Cab of AE-II under AMD, PHE Dte. for the month of FEBRUARY, 2024 BILL/00319/2024-2025 BP-2024-25-30/3 06/08/2024 0 RANAJIT AUTO 0.23 0.00 0 0
41 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Fuel Charges for the Cab of AE-II under AMD, PHE Dte. for the month of JANUARY, 2024 BILL/00317/2024-2025 BP-2024-25-30/2 06/08/2024 0 RANAJIT AUTO 0.25 0.00 0 0
42 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Earnest Money Deposit for Bulk Power Supply at Mohishila Boosting Station under Augmentation of RCFA Part II WS Scheme. BILL/00696/2023-2024 BP-2023-24-65 02/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.05 0.00 0 0
43 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Way leave / Track crossing proposal with Application ID : ER-ASN-2023-WL-90 dt 07.03.2024 under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) under RCFA Division-I PHE Dte. BILL/01541/2023-2024 626/23-24 14/03/2024 0 EASTERN RAILWAY 0.09 0.00 0 0
44 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation DIVERSION OF 33KV S/C PHE FEEDER INSIDE THE PREMISES OF THE PHE DUE TO PROPOSED WTP,KALYNESWARI FOR M/S PHE DIRECTORATE,ASANSOL BILL/00022/2024-2025 BP-2024-25-4 23/04/2024 0 CHIEF ACCOUNTS OFFICER, DAMODAR VALLEY CORPORATION 2.80 0.00 0 0
45 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Fuel Bill for Diesel Driven Maxi Cab for Official Use of The AE-I, under AMD, PHE Dte for the month of April, 2024. BILL/00465/2024-2025 BP-2024-25-33/7 23/08/2024 0 RANAJIT AUTO 0.22 0.00 0 0
46 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Fuel Bill for the Cab of The Executive Engineer, under AMD, PHE Dte., for the month of Jan, 2024. BILL/00467/2024-2025 BP-2024-25-34/1 23/08/2024 0 RANAJIT AUTO 0.25 0.00 0 0
47 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Fuel Charges for the Cab of AE - I under AMD, PHE Dte. for the month of DECEMBER, 2023 BILL/00320/2024-2025 BP-2024-25-27/3 30/07/2024 0 RANAJIT AUTO 0.26 0.00 0 0
48 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Way leave / Track crossing proposal with Application ID : ER-ASN-2023-WL-70 dt 09.02.2024 under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) under RCFA Division-I PHE Dte. BILL/01365/2023-2024 564/23-24 20/02/2024 0 EASTERN RAILWAY 7.84 0.00 0 0
49 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Bulk Power Supply at Mohishila Boosting Station under Augmentation of RCFA Part II. BILL/00912/2023-2024 BP-2023-24-77 21/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 22.75 0.00 0 0
50 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Way leave / Track crossing proposal with Application ID : ER-ASN-2023-WL-72 dt 09.02.2024 under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) under RCFA Division-I PHE Dte. BILL/01367/2023-2024 566/23-24 20/02/2024 0 EASTERN RAILWAY 6.97 0.00 0 0
51 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Fuel Charges for the Cab of AE-I under AMD, PHE Dte. for the month of FEBRUARY, 2024. BILL/00312/2024-2025 BP-2024-25-30/1 06/08/2024 0 RANAJIT AUTO 0.27 0.00 0 0
52 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Fuel Charges for the Cab of AE-II under AMD, PHE Dte. for the month of DECEMBER, 2023 BILL/00315/2024-2025 BP-2024-25-27/1 30/07/2024 0 RANAJIT AUTO 0.24 0.00 0 0
53 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Fuel Bill for the Cab of The Executive Engineer, under AMD, PHE Dte., for the month of Feb, 2024. BILL/00469/2024-2025 BP-2024-25-34/3 23/08/2024 0 RANAJIT AUTO 0.22 0.00 0 0
54 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Way leave / Track crossing proposal with Application ID : ER-ASN-2023-WL-08 dt 07.03.2024 under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) under RCFA Division-I PHE Dte. BILL/01540/2023-2024 625/23-24 14/03/2024 0 EASTERN RAILWAY 0.08 0.00 0 0
55 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Way leave / Track crossing proposal with Application ID : ER-ASN-2023-WL-92 dt 07.03.2024 under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) under RCFA Division-I PHE Dte. BILL/01542/2023-2024 627/23-24 14/03/2024 0 EASTERN RAILWAY 0.28 0.00 0 0
56 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Installation Charge and Security Deposit for Bulk Power Supply at Intake Sub-Station Sarkuri Salanpur Under Augmentation of RCFA Part-II BILL/00003/2024-2025 BP-2024-25-2 15/04/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 54.89 0.00 0 0
57 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Fuel Charges for the Cab of AE-I under AMD, PHE Dte. for the month of NOVEMBER, 2023 BILL/00307/2024-2025 BP-2024-25-27/2 30/07/2024 0 RANAJIT AUTO 0.22 0.00 0 0
58 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation License Fees for five (05) years for 6-lanning of Barwa Adda - Panagarh section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the state of Jharkhand & West Bengal under NHDP Phase -V on BOT (Toll) on DBFOT pattern - Permission for laying of water pipeline along NH-2 from Kalla more (km 462+080) to Harishpur (km+918) and 7 nos crossing across NH-2 in the state of West Bengal under Augmentatin of RCFA Pt II Volume -II under RCFA Division-I PHE Dte. BILL/00522/2024-2025 282/24-25 09/09/2024 0 NATIONAL HIGHWAY AUTHORITY OF INDIA 164.48 0.00 0 0
59 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Quotation for Earnest Money Deposit at Searsole Boosting Station, Ranisayer under Augmentation of RCFA II WS Scheme. BILL/00693/2023-2024 BP-2023-24-62 28/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.05 0.00 0 0
60 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Bulk Power Supply at Searsole Boosting Station under Augmentation of RCFA Part II. BILL/00911/2023-2024 BP-2023-24-76 21/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 93.38 0.00 0 0
61 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Way leave / Track crossing proposal with Application ID : ER-ASN-2023-WL-93 dt 07.03.2024 under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) under RCFA Division-I PHE Dte. BILL/01538/2023-2024 623/23-24 14/03/2024 0 EASTERN RAILWAY 0.08 0.00 0 0
62 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Fuel Bill for Diesel Driven Maxi Cab for Official Use of The AE-I, under AMD, PHE Dte for the month of March, 2024. BILL/00463/2024-2025 BP-2024-25-33/5 23/08/2024 0 RANAJIT AUTO 0.25 0.00 0 0
63 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Payment of Security Deposite & Remaining Earnest Money for Bansra Boosting Station (Consumer ID- 950085633) under Asansol Mechanical Division, P.H.E. Dte. BILL/00398/2024-2025 BP-2024-25-24 29/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 24.84 0.00 0 0
64 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Quotation Money for Earnest Money Deposition for Bulk Power supply at Kalyaneswari under Augmentation of RCFA Part II WS Scheme. BILL/00777/2023-2024 BP-2023-24-69 11/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.20 0.00 0 0
65 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Way leave / Track crossing proposal with Application ID : ER-ASN-2023-WL-95 dt 07.03.2024 under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) under RCFA Division-I PHE Dte. BILL/01543/2023-2024 628/23-24 14/03/2024 0 EASTERN RAILWAY 0.08 0.00 0 0
66 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Fuel Bill for Diesel Driven Maxi Cab for Official Use of The AE-II, under AMD, PHE Dte for the month of March, 2024. BILL/00459/2024-2025 BP-2024-25-33/1 23/08/2024 0 RANAJIT AUTO 0.23 0.00 0 0
67 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Fuel Charges for the Cab of EE under AMD, PHE Dte. for the month of NOV, 2023. BILL/00303/2024-2025 BP-2024-25-27/4 30/07/2024 0 RANAJIT AUTO 0.09 0.00 0 0
68 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Fuel Charges for the Cab of EE under AMD, PHE Dte. for the month of DECEMBER, 2023. BILL/00305/2024-2025 BP-2024-25-27/5 30/07/2024 0 RANAJIT AUTO 0.23 0.00 0 0
69 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation PAYMENT OF SECURITY DEPOSIT & EARNEST MONEY FOR BULK POWER SUPPLY AT SHANKARPUR BOOSTING STATION. BILL/00589/2024-2025 BP-2024-25-63 28/10/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 22.90 0.00 0 0
70 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Fuel Bill for the Cab of The Executive Engineer, under AMD, PHE Dte., for the month of April, 2024. BILL/00473/2024-2025 BP-2024-25-62 28/10/2024 0 RANAJIT AUTO 0.22 0.00 0 0
71 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Formal Work Order for Laying of different dia HDPE pipe line and allied works at Raghunathchak, Raniganj Chati, Baliapur and adjacent area under Zone-IX for Improvement of RCFA Part-I Water Supply Scheme under RCFA Division-I PHE Dte. Assistant Engineer 1,Assistant Engineer 2 Junior Engineer ORD/000305/2023-2024 2383/RCD-I 07/08/2023 90 DAWN CONSTRUCTION 105.48 90.97 86.24 100
72 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Acceptance cum work order for Renovation work at Kalyaneswari Inspection Bungalow & WTP under RCFA Part-I W/S Scheme under RCFA Division-I PHE Dte. Assistant Engineer 2,Assistant Engineer 4 Junior Engineer ORD/000721/2023-2024 3610/RCD-1 20/12/2023 540 M/S KALYANI ENTERPRISE 81.82 7.51 9.18 100
73 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Acceptance cum work order for Operation and regulatiing of different dia S/V of Distribution system and rising main for FHTC work for Mdira, Dighalpahari, Chotkara and Kanskuli villages under administrative contingency of JJM under RCFA Division -I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000820/2023-2024 101/RCD-1 09/01/2024 239 SRI KRISHNA ENTERPRISE 2.91 0.00 0 100
74 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. , SM/18468 Augmentation Acceptance cum Work Order for Realtime Water Quality Monitoring including 1 year maintenance for the OHR as hereunder RCFA Division-I PHE Dte. Assistant Engineer 2,Assistant Engineer 4 Junior Engineer ORD/000079/2024-2025 2033/RCD-I 21/08/2024 455 MAXBRIDGE SOLUTIONS LLP 33.46 0.00 0 55
Total 3,748.85 2,174.14 57.99