Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 784.57 555.93 70.86  
1 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-16) UNDER RCFA DIVISION-I PHE DTE. , SM/12042 Augmentation Acceptance cum work order for Construction of Chlorine Room of size (4.50 x 3.50 M) at (Zone-16) of Raniganj Block for Augmentation of RCFA Part-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman (Sl No. 31) Assistant Engineer 2 Junior Engineer ORD/000911/2022-2023 1175/RCD I 24/03/2023 90 N.R. CONSTRUCTION 4.61 0.00 0 0
2 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-16) UNDER RCFA DIVISION-I PHE DTE. , SM/12042 Augmentation Acceptance cum Work Order for Distribution Network for Improvement RCFA Part-II Water Supply Scheme within command area of Zone-16 including FHTC work (Part-A) under RCFA Div-I PHE Dte. (Mouza-Sahebganj) Assistant Engineer 2 Junior Engineer ORD/000532/2022-2023 3160/RCD-I 13/12/2022 30 KRISHNA KUMAR TODI HUF 88.68 79.11 89.21 100
3 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-16) UNDER RCFA DIVISION-I PHE DTE. , SM/12042 Augmentation Formal work word for Distribution Network for RCFA Part-II Pipe Water Supply Scheme including FHTC & allied work under RCFA Division-I PHE Dte. (Zone-16). Assistant Engineer 2 Junior Engineer ORD/000039/2023-2024 1606/RCD I 25/04/2023 90 JOY HIND TUBEWELLS 488.35 417.76 85.55 72
4 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-16) UNDER RCFA DIVISION-I PHE DTE. , SM/12042 Augmentation Material Requisition To Resource Division RTOR000035/2023-2024 2939/RCD-I 11/10/2023 Resource Division 6.78 0.00 0 0
5 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-16) UNDER RCFA DIVISION-I PHE DTE. , SM/12042 Augmentation Acceptance cum work order for Balance work for laying of HDPE pipeline and PVC pipeline and allied works at Nabagram, Ukhra (Sansad-VI) Chatterjee para and Bahula Colony under RCFA Part-II Water Supply Scheme under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000660/2023-2024 3453/RCD-I 24/11/2023 15 MD AAMIR KHAN 4.36 2.12 48.62 100
6 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-16) UNDER RCFA DIVISION-I PHE DTE. , SM/12042 Augmentation Sub Soil Investigation for 600 cum capacity RCC Over Head Reservoir at (Zone-16) of Raniganj Block for Augmentation of RCFA Part-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman Assistant Engineer 2 Junior Engineer ORD/000559/2022-2023 3353/RCDI 23/12/2022 7 MOYTEC 0.49 0.00 0 100
7 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-16) UNDER RCFA DIVISION-I PHE DTE. , SM/12042 Augmentation Acceptance cum work order for Additional Supplying aligning laying HDPE pipe Mechanical fitting supplying sluice valve and other allied works at (Mouza-Sahenganj) under Zone-16 Part-II W/S Scheme under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/001019/2023-2024 572/RCD-I 23/02/2024 30 KRISHNA KUMAR TODI HUF 36.45 18.23 50.01 100
8 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-16) UNDER RCFA DIVISION-I PHE DTE. , SM/12042 Augmentation Formal work order for Construction of 600 cum capacity 20 mtr. Staging height RCC Over head Reservoir (pipe connection and cost of pipes, special at Raniganj Block (Zone-16) for Augmentation of RCFA Division-II piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman. Ref Drawing No. PC-I/OHR/2012 (Sheet No. 1 & 2) Assistant Engineer 2 Junior Engineer ORD/000156/2023-2024 1899/RCD-I 09/06/2023 360 ASHA CONSTRUCTION 154.85 38.71 25 45
Total 784.56 555.94 70.86