Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 140.33 133.13 94.87  
1 PASCHIM BARDHAMAN RCFA Division -I Retrofitting of Churulia PWSS for providing FHTC within Jamuria Block. , SM/09064 Retrofitting Acceptance cum work order for Supply and delivery of C.I. Sluice valve and D.I Specials under Improvement of RCFA part-I Piped water Supply Scheme under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000055/2023-2024 1729/RCD-1 08/05/2023 10 SSPR VALVE MANUFACTURING PVT LTD 45.31 45.31 100 100
2 PASCHIM BARDHAMAN RCFA Division -I Retrofitting of Churulia PWSS for providing FHTC within Jamuria Block. , SM/09064 Retrofitting Acceptance cum work order for Requirement of different type water regulating apparatus including water leakage protection apparatus etc. for Kendra Khottamdihi Water Supply Scheme under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000056/2023-2024 1730/RCD-1 08/05/2023 10 MAKALI ENGINEERING CORPORATION 45.99 45.99 100 0
3 PASCHIM BARDHAMAN RCFA Division -I Retrofitting of Churulia PWSS for providing FHTC within Jamuria Block. , SM/09064 Retrofitting Acceptance cum work order Construction of stand post on emergency basis at Rupnarayanpur, Rangamati area of Rupnarayanpur Zone under 4 Nos. retrofitting PWSS under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000987/2022-2023 1266/RCD-1 27/03/2023 15 B.B. CONSTRUCTION 2.80 2.78 99.29 0
4 PASCHIM BARDHAMAN RCFA Division -I Retrofitting of Churulia PWSS for providing FHTC within Jamuria Block. , SM/09064 Retrofitting Acceptance cum work order for Additional work for laying of 450 mm dia distribution main under Lalganj Bridge by concrete conduit and allied MS work in connection to distribution network of Zone-XI (Part-1) for Improvement of RCFA Part-I Piped Water Supply Scheme under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000251/2023-2024 2237/RCD-1 17/07/2023 30 R B ENTERPRISE 16.06 13.45 83.75 100
5 PASCHIM BARDHAMAN RCFA Division -I Retrofitting of Churulia PWSS for providing FHTC within Jamuria Block. , SM/09064 Retrofitting Acceptance cum work order Additional work for laying & pushing of 600 to 1000 mm dia RCC (NP3) Hume pipe by adopting trench less technology (e.g. Jack Pushing Method etc) and MS pipe including supply of collar and allied work at Ethora Nuni more Panchgachiya and Lalganj more in connection to rising main Part-B under Improvement of RCFA Part-I (Zone-11, Part-9) PWSS under RCFA Division-I PHE Dte Assistant Engineer 2 Junior Engineer ORD/000218/2023-2024 2224/RCD-I 17/07/2023 30 M/S MONDAL ENTERPRISE 30.17 25.60 84.85 100
Total 140.33 133.14 94.87