Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 33,695.45 292.24 0.87  
1 JHARGRAM Gopiballavpur-I Jhargram Division SUMITRAPUR AND ADJOINING MOJAS PWSS , SM/12528 New Construction of Boundary wall & allied works at 2nd. Tube well site of Sumitrapur and its adjoining mouzas Pipe Water Supply Scheme within Gopaballavpur-I Block under Gopiballavpur Sub Division within Jhargram Division, P.H.E.Dt (Total length 50 mtr,column size 250x250mm,3.00 M c/c ht.- 2.300mtr from G.L) Assistant Engineer Junior Engineer, Gopiballavpur Sub Division ORD/000554/2023-2024 190/GPSD 11/03/2024 30 S.R. ENTERPRISE 4.25 4.10 96.47 100
2 JHARGRAM Gopiballavpur-I Jhargram Division SUMITRAPUR AND ADJOINING MOJAS PWSS , SM/12528 New Material Requisition To Resource Division RTOR000053/2023-2024 421/JHD 13/03/2024 0 Resource Division 30.74 0.00 0 0
3 JHARGRAM Gopiballavpur-I Jhargram Mechanical Division SUMITRAPUR AND ADJOINING MOJAS PWSS , SM/12528 New New Service Connection charges for Sumitrapur tw-II pwss BILL/01197/2023-2024 38/JMD 01/02/2024 0 WBSEDCL 3.83 0.00 0 0
4 JHARGRAM Gopiballavpur-I Jhargram Mechanical Division SUMITRAPUR AND ADJOINING MOJAS PWSS , SM/12528 New New Service Connection charges for Sumitrapur, Tw-I pwss BILL/01198/2023-2024 39/JMD 01/02/2024 0 WBSEDCL 4.28 0.00 0 0
5 JHARGRAM Gopiballavpur-I Central Drilling SUMITRAPUR AND ADJOINING MOJAS PWSS , SM/12528 New Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 304 JHARGRAM SPV PRIVATE LIMITED 21,339.76 22.73 0.11 11
6 JHARGRAM Gopiballavpur-I Jhargram Division SUMITRAPUR AND ADJOINING MOJAS PWSS , SM/12528 New Sinking of Tube Well ,Construction of Different Capacity R.C.C Over Head Reservoir Over Pile / Raft Foundation including sub soil investigation works with laying distribution system , Pump House & Providing Functional Household Tap Connection (41827 Nos), etc. For 32 nos Pipe water supply Scheme within Gopiballavpur-I, Gopiballavpur-II and JHARGRAM Block Under Jhargram Division PHE Dte. Under Jhargram District. Assistant Engineer,Assistant Engineer Headquarter Junior Engineer, Gopiballavpur Sub Division,Junior Engineer-II ORD/000298/2023-2024 1727/JHD 30/09/2023 459 ADITYA ARAV DEV CONS CO. PVT. LTD. 12,284.77 265.41 2.16 25
7 JHARGRAM Gopiballavpur-I Jhargram Division SUMITRAPUR AND ADJOINING MOJAS PWSS , SM/12528 New Field Level data validation of FHTC executed by various Agencies on the basis of pictorial data ith the objective of controlling multiple entry, improving data quality in terms of absolute household by erification through electric connection any other unique documents and making error free in Afferent Pipe Water Supply Scheme In different Block in the District of Jhargram under Jhargram Division. PHE Dte.(130-Sumitrapur PWSS within Gopiballavpur-I Block) Assistant Engineer Junior Engineer, Gopiballavpur Sub Division ORD/000268/2024-2025 363/GPSD 08/04/2024 150 TECHVISION 0.67 0.00 0 0
8 JHARGRAM Gopiballavpur-I Jhargram Division SUMITRAPUR AND ADJOINING MOJAS PWSS , SM/12528 New Construction of Boundary wall and allied works at 1st. Tube well site cum Head Work Site for Proposed Pipe Water Supply Scheme of Sumitrapur and Amarda and its adjoining Mouzas , Block Gopiballavpur-I, District Jhargram {TYPE - B} te. (Total length 125 mtr,column size 250x250mm,3.00 M c/c ht.- 2.300mtr from G.L) Assistant Engineer Junior Engineer-II ORD/000326/2024-2025 468/JHD 04/03/2025 60 RITESH AGARWALL 27.15 0.00 0 0
Total 33,695.45 292.25 0.87