Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
11 645.45 314.34 48.7  
1 PURBA MEDINIPUR Tamluk Division Augmentation of Ground Water Based Piped Water Supply Scheme for Bajkul Zone-II , SM/12490 Augmentation Preparation of D.P.R. for different works for providing Functional Household Tap Connection (FHTC) by Augmentation of Bajkul Water Supply Scheme (Zone-II) under Tamluk Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000889/2021-2022 1803/TD 08/02/2022 20 GEOTECHNICAL ENGINEERS CONSORTIUM 4.79 3.32 69.31 100
2 PURBA MEDINIPUR Tamluk Division Augmentation of Ground Water Based Piped Water Supply Scheme for Bajkul Zone-II , SM/12490 Augmentation Material Requisition To Resource Division RTOR000116/2022-2023 1671/TD 03/11/2022 0 Resource Division 39.54 0.00 0 0
3 PURBA MEDINIPUR Tamluk Division Augmentation of Ground Water Based Piped Water Supply Scheme for Bajkul Zone-II , SM/12490 Augmentation Material Requisition To Resource Division RTOR000024/2023-2024 608/TD 17/05/2023 0 Resource Division 13.82 0.00 0 0
4 PURBA MEDINIPUR Tamluk Division Augmentation of Ground Water Based Piped Water Supply Scheme for Bajkul Zone-II , SM/12490 Augmentation Name of Work: Sinking of 4 (Four) nos. Tube Well at different sites. Name of Sites: i) Sinking of 250mm. x 150mm. dia. x 225 mtr. Deep Tube well by direct rotary rig method for 1st Tube Well (Mouza- Pora Chingra, JL No. 155) of Augmentation of Bajkul Zone-II Water Supply Scheme within Bhagwanpur- II Block under Contai Sub-Division, of Tamluk Division P.H.E. Dte. Purba Medinipur. ii) Sinking of 250mm. x 150mm. dia. x 225 mtr. Deep Tube well by direct rotary rig method for 2nd Tube Well (Mouza- Kismat Bajkul, JL No. 156) of Augmentation of Bajkul Zone-II Water Supply Scheme within Bhagwanpur- II Block under Contai Sub-Division, of Tamluk Division P.H.E. Dte. Purba Medinipur. iii) Sinking of 300mm. x 200mm. dia. x 225 mtr. Deep Tube well by direct rotary rig method for 3rd Tube Well (Mouza- Kismat Bajkul, JL No. 156) of Augmentation of Bajkul Zone-III Water Supply Scheme under Bhagwanpur- II Block of Contai Sub-Division, of Tamluk Division P.H.E. Dte. Purba Medinipur. iv) Sinking of 300mm. x 200mm. dia. x 225 mtr. Deep Tube well by direct rotary rig method for Additional Tube Well (Mouza- Kismat Bajkul, JL No. 156) of Augmentation of Bajkul Zone-III Water Supply Scheme under Bhagwanpur- II Block of Contai Sub-Division, of Tamluk Division P.H.E. Dte. Purba Medinipur. Assistant Engineer Junior Engineer ORD/000561/2022-2023 2244/TD 29/12/2022 40 PRANTIK DRILLING AGENCY 61.68 23.98 38.88 90
5 PURBA MEDINIPUR Midnapore Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme for Bajkul Zone-II , SM/12490 Augmentation Electric Quotation for BAJKUL Water Supply Scheme T/W-I, Zone- II, (Ref. ID-204114262) BILL/03058/2023-2024 BP-2023-24-374 01/12/2023 0 WBSEDCL 3.48 0.00 0 0
6 PURBA MEDINIPUR Midnapore Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme for Bajkul Zone-II , SM/12490 Augmentation Electric Quotation for BAJKUL Water Supply Scheme T/W-II, Zone- II, (Ref. ID-204114267) BILL/03059/2023-2024 BP-2023-24-375 02/12/2023 0 WBSEDCL 4.77 0.00 0 0
7 PURBA MEDINIPUR Midnapore Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme for Bajkul Zone-II , SM/12490 Augmentation Additional Quotation Bill for the Service connection at T/W NO-I , ZONE-II Of BAJKUL W/S Scheme Under Jal Jeevan Mission under MMD, PHE, Dte. Block- BHAGWANPUR-II, WBSEDCL SUPPLY OFFICE: KHEJURI C.C.C. Ref. Memo No-KJR/QTN/200 DT. 25-06-2024 Application NO- 100000111551 DT. 25-06-2024 Application type-ADDITIONAL QUOTATION FOR SERVICE CONNECTION REF. Id- 860303091 BILL/01400/2024-2025 BP-2024-25-379 08/07/2024 0 WBSEDCL 0.53 0.00 0 0
8 PURBA MEDINIPUR Tamluk Division Augmentation of Ground Water Based Piped Water Supply Scheme for Bajkul Zone-II , SM/12490 Augmentation Laying of Distribution pipe line to accommodate FHTC (2244 Nos) with construction of R.C.C. Elevated Reservoir of capacity 300 cum and staging height 20.00 mtr. as per Departmental Drawing with allied works for Augmentation of Bajkul Zone - II Water Supply Scheme within Bhagabanpur- II Block under Contai Sub-Division of Tamluk Division P.H.E.DTE. Purba Medinipur. Assistant Engineer Junior Engineer ORD/000494/2022-2023 1891/TD 24/11/2022 1103 MAA ANANDAMAYEE 407.46 227.81 55.91 50
9 PURBA MEDINIPUR Midnapore Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme for Bajkul Zone-II , SM/12490 Augmentation Providing and Installation of Submersible pumping machineries and other electromechanical equipments for Augmentation of Ground Water Based Piped Water Supply Scheme for Bajkul Zone-II, Block Bhagawanpur II, District - Purba Medinipur under JJM Program under MMD PHE Dte. Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Divi Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. ORD/001980/2022-2023 819/W/MMD 24/03/2023 180 S.K.ENTERPRISE 23.70 21.81 92.03 85
10 PURBA MEDINIPUR Tamluk Division Augmentation of Ground Water Based Piped Water Supply Scheme for Bajkul Zone-II , SM/12490 Augmentation Laying of Left-Out portion uPVC Pipe line, Construction of New Pump House, Boundary Wall and others allied works for 3rd Tube well site and Repair & renovation and others allied works of Pump House, Boundary Wall for head works (1st. Tube well) site and 2nd Tube well site at mouza- Kismat Bajkul,J.L- No -156, under Bajkul Zone-II Water Supply scheme. ( Augmentation) in Bhagabanpur-II Block within Contai Sub-Division under Tamluk Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000577/2023-2024 2185/TD 01/09/2023 770 MAA ANANDAMAYEE 84.88 37.42 44.09 60
11 PURBA MEDINIPUR Tamluk Division Augmentation of Ground Water Based Piped Water Supply Scheme for Bajkul Zone-II , SM/12490 Augmentation Brick bats road due to smoothly carring Rig Machine and soil testing equipment for Head Works site at Mouza-Pora Chingra, J.L. NO.-155, under Bajkul Zone-II W/S Scheme (Augmentation) within Bhagwanpur-II Block under Contai Sub-Division of Tamluk Division, P.H.E.Dte.Purba Medinipur. Assistant Engineer Junior Engineer ORD/000841/2023-2024 1705/CSD 31/08/2023 15 M/S MONDAL CONSTRUCTION & CO. 0.80 0.00 0 0
Total 645.47 314.35 48.7