Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
13 546.47 319.24 58.42  
1 PURBA MEDINIPUR Tamluk Division Augmentation of Ground Water Based Piped Water Supply Scheme for Amarshi Kasba Zone-II , SM/12488 Augmentation Preparation of D.P.R. for different works for providing Functional Household Tap Connection (FHTC) by Augmentation of Amarshikashba Water Supply Scheme (Zone-II) under Tamluk Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000322/2022-2023 617/TD 21/06/2022 20 GEOTECHNICAL ENGINEERS CONSORTIUM 4.25 3.32 78.12 100
2 PURBA MEDINIPUR Central Drilling Augmentation of Ground Water Based Piped Water Supply Scheme for Amarshi Kasba Zone-II , SM/12488 Augmentation Providing drilling crew and other allied works for construction of Tube Well (300 mm X 200mm X 190mm Depth) by utilising Departmental Machineries for Amarshi Kasba W/S Scheme(Z-II,TW-I), Patashpur -I Block under Purba Medinipur District, CDD,P.H.E.Dte. Driller In Charge Junior Engineer ORD/000483/2022-2023 2122/CDD 02/03/2023 30 MENAKA ENTERPRISE 15.74 12.47 79.22 100
3 PURBA MEDINIPUR Tamluk Division Augmentation of Ground Water Based Piped Water Supply Scheme for Amarshi Kasba Zone-II , SM/12488 Augmentation Material Requisition To Resource Division RTOR000118/2022-2023 1669/TD 03/11/2022 0 Resource Division 57.23 0.00 0 0
4 PURBA MEDINIPUR Tamluk Division Augmentation of Ground Water Based Piped Water Supply Scheme for Amarshi Kasba Zone-II , SM/12488 Augmentation Material Requisition To Resource Division RTOR000069/2023-2024 2645/TD 13/10/2023 0 Resource Division 14.40 0.00 0 0
5 PURBA MEDINIPUR Midnapore Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme for Amarshi Kasba Zone-II , SM/12488 Augmentation Electric Quotation for AMARSIKASBA Water Supply Scheme T/W-I, Zone -II, (Ref. ID-204098661) BILL/02897/2023-2024 BP-2023-24-311 01/11/2023 0 WBSEDCL 3.28 0.00 0 0
6 PURBA MEDINIPUR Tamluk Division Augmentation of Ground Water Based Piped Water Supply Scheme for Amarshi Kasba Zone-II , SM/12488 Augmentation Rising main and other allied works Augmentation of Amarshikasba Zone-II W/S Scheme within Patashpur-I Block under Contai Sub-Division of Tamluk Division, PHE Dte. Purba Medinipur. Assistant Engineer Junior Engineer ORD/000198/2023-2024 399/TD 27/04/2023 25 AURGHA BHATTACHARYA 7.68 2.41 31.38 80
7 PURBA MEDINIPUR Tamluk Division Augmentation of Ground Water Based Piped Water Supply Scheme for Amarshi Kasba Zone-II , SM/12488 Augmentation Construction of Boundary Wall (as per Departmental Design & Drawing) at Head works site for Augmentation of Amarshikasba Zone-II PWSS within Patashpur-I Block under Contai Sub-Division of Tamluk Division, P.H.E.Dte.Purba Medinipur.(Length-136.00 mtr.) Assistant Engineer Junior Engineer ORD/000290/2023-2024 592/TD 17/05/2023 45 ANUSKA ENTERPRISE 21.29 7.74 36.36 40
8 PURBA MEDINIPUR Tamluk Division Augmentation of Ground Water Based Piped Water Supply Scheme for Amarshi Kasba Zone-II , SM/12488 Augmentation Construction of 5.40 mtr x3.60mtr. Size Switch Room cum Chlorin Room (as per Departmental Design & Drawing) with sanitary & water supply arrangements including Plinth Protection at 1st TW(Head Work) site for Augmentation of Amarshikasba Zone-II & its adjoining moujas PWSS in Patashpur-I Block under Contai Sub-Division of Tamluk Division, P.H.E.Dte.Purba Medinipur.(For Low Land) Assistant Engineer Junior Engineer ORD/000291/2023-2024 593/TD 17/05/2023 60 M/S SOURAV MAHAPATRA 7.26 5.78 79.61 100
9 PURBA MEDINIPUR Central Drilling Augmentation of Ground Water Based Piped Water Supply Scheme for Amarshi Kasba Zone-II , SM/12488 Augmentation Providing drilling crew and other allied works for construction of Tube Well ( 300mm X200mm X 190 Mtrs. Depth) by utilising Departmental Machineries for Amarshi Kasba W/S Scheme (Zone-I,T/W-III) , Patashpur-I Block under Purba Medinipur District, Central Drilling Division, P.H.E. Dte. Driller In Charge Junior Engineer ORD/000515/2022-2023 2123/CDD 02/03/2023 300 MENAKA ENTERPRISE 15.74 12.78 81.19 100
10 PURBA MEDINIPUR Midnapore Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme for Amarshi Kasba Zone-II , SM/12488 Augmentation Quotation Bill for New Service connection at T/W NO-II, ZONE-II Of AMARSI KASBA W/S Scheme under MMD, PHE, Dte. Block- Potashpur-I, AMARSI C.C.C. Ref. Memo No- 2004607907/QUOT/03 DT. 21-02-2024 Application NO- 2004607907 Application type-New connection Reference Id- 204223198 BILL/04384/2023-2024 BP-2023-24-822 13/03/2024 0 WBSEDCL 3.18 0.00 0 0
11 PURBA MEDINIPUR Midnapore Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme for Amarshi Kasba Zone-II , SM/12488 Augmentation Providing and Installation of Submersible pumping machineries and other electromechanical equipments for Augmentation of Ground Water Based Piped Water Supply Scheme for Amarshi Kasba Zone-II, Block Potashpur I, District - Purba Medinipur under JJM Program under MMD PHE Dte. Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Divi Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. ORD/001971/2022-2023 814/W/MMD 24/03/2023 180 S.K.ENTERPRISE 22.80 19.87 87.15 10
12 PURBA MEDINIPUR Tamluk Division Augmentation of Ground Water Based Piped Water Supply Scheme for Amarshi Kasba Zone-II , SM/12488 Augmentation Laying of distribution pipe line to accommodate FHTC (2238 Nos) with construction of R.C.C. Elevated Reservoir of capacity 300cum and staging height 20.00 mtr. as per Departmental Drawing with allied works including supply of all labour & materials for Augmentation of Amarshikasba Zone-II water Supply Scheme within Patashpur-I Block under Contai Sub-Division of Tamluk Division, P.H.E.Dte, Purba Medinipur. Assistant Engineer Junior Engineer ORD/000750/2022-2023 2593/TD 30/01/2023 878 DAS ENTERPRISE 372.65 254.87 68.39 100
13 PURBA MEDINIPUR Tamluk Division Augmentation of Ground Water Based Piped Water Supply Scheme for Amarshi Kasba Zone-II , SM/12488 Augmentation Drum Sheet walling 1.40m. (av.) high on sal-bullah / Eucalyptus bullah pilling with allied works of Amarshi Kasba Zone-II & its adjoining moujas PWSS within Patashpur-I Block under Contai-Sub-Division of Tamluk Division, PHE Dte. Purba Medinipur District. Assistant Engineer Junior Engineer ORD/001257/2024-2025 130/CSD 16/01/2025 7 GHOSH CONSTRUCTION (GST : 19AXMPG8403A1ZO) 0.97 0.00 0 100
Total 546.46 319.24 58.42