Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
14 1,526.07 926.73 60.73  
1 PURBA MEDINIPUR Tamluk Division Different works for Providing Functional Household TAP Connection (FHTC) by Augmentation of Erasole Water Supply Scheme. , SM/10396 Augmentation Preparation of D.P.R. for different works for providing Functional Household Tap Connection (FHTC) by Augmentation of Erasole Water Supply Scheme under Tamluk Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000369/2021-2022 1646/TD 19/01/2022 20 HORIZEN 5.37 5.37 100 100
2 PURBA MEDINIPUR Tamluk Division Different works for Providing Functional Household TAP Connection (FHTC) by Augmentation of Erasole Water Supply Scheme. , SM/10396 Augmentation Sinking of 4 (four) nos. Tube Well at different sites. Name of Sites: i) Sinking of 300mm. x 200mm. dia. x 240 mtr. Deep Additional Tube well by direct rotary rig method at 3rd Tube well Site of Erasol Water Supply Scheme within Chandipur Block under Tamluk Sub-Division, of Tamluk Division P.H.E.Dte. Purba Medinipur. ii) Sinking of 300mm. x 200mm. dia. x 240 mtr. Deep Additional Tube well by direct rotary rig method at 4th Tube well Site of Erasol Water Supply Scheme within Chandipur Block under Tamluk Sub-Division, of Tamluk Division P.H.E.Dte. Purba Medinipur. iii) Sinking of 300mm. x 200mm. dia. x 230 mtr. Deep Additional Tube well by direct rotary rig method at 3rd Tube well Site of Kanktia Water Supply Scheme within Matangini Dev. Block under Tamluk Sub-Division, of Tamluk Division P.H.E. Dte. Purba Medinipur. iv) Sinking of 300mm. x 200mm. dia. x 250 mtr. Deep Additional Tube well by direct rotary rig method at 3rd Tube well Site(Boosting T/W) of Bagmari Water Supply Scheme under Contai Sub-Division, of Tamluk Division P.H.E. Dte. Purba Medinipur. Assistant Engineer Junior Engineer ORD/000264/2022-2023 1094/TD 25/08/2022 40 AQUATECH ENGINEERS 70.49 33.70 47.81 100
3 PURBA MEDINIPUR Tamluk Division Different works for Providing Functional Household TAP Connection (FHTC) by Augmentation of Erasole Water Supply Scheme. , SM/10396 Augmentation Material Requisition To Resource Division RTOR000021/2022-2023 409/TD 25/05/2022 0 Resource Division 114.93 0.00 0 0
4 PURBA MEDINIPUR Tamluk Division Different works for Providing Functional Household TAP Connection (FHTC) by Augmentation of Erasole Water Supply Scheme. , SM/10396 Augmentation Material Requisition To Resource Division RTOR000086/2022-2023 1263/TD 12/09/2022 0 Resource Division 44.05 0.00 0 0
5 PURBA MEDINIPUR Midnapore Mechanical Different works for Providing Functional Household TAP Connection (FHTC) by Augmentation of Erasole Water Supply Scheme. , SM/10396 Augmentation Electric Quotiaton for Erashal Water Supply Scheme TW-IV (Ref. ID-203949710) BILL/00109/2023-2024 BP-2023-24-36 04/05/2023 0 WBSEDCL 0.50 0.00 0 0
6 PURBA MEDINIPUR Tamluk Division Different works for Providing Functional Household TAP Connection (FHTC) by Augmentation of Erasole Water Supply Scheme. , SM/10396 Augmentation Way leave charges of South Eastern Railway Track for Application ID SER-KGP-2023-WL-58 under Tamluk Division, PHE Dte. BILL/01676/2023-2024 BP-2023-24-737 29/12/2023 0 FA & CAO, S.E. RAILWAY, GRC. 0.07 0.00 0 0
7 PURBA MEDINIPUR Midnapore Mechanical Different works for Providing Functional Household TAP Connection (FHTC) by Augmentation of Erasole Water Supply Scheme. , SM/10396 Augmentation Electric Quotiaton for Erashal Water Supply Scheme TW-III (Ref. ID-203949718) BILL/00110/2023-2024 BP-2023-24-37 04/05/2023 0 WBSEDCL 0.50 0.00 0 0
8 PURBA MEDINIPUR Tamluk Division Different works for Providing Functional Household TAP Connection (FHTC) by Augmentation of Erasole Water Supply Scheme. , SM/10396 Augmentation Repairing & Renovation of Construction of switch Room cum Chlorine Room at OHR site and 2 nd.Tube Well site and Renovation of existing Boundary Wall at OHR site and 2 nd.Tube Well site and New construction of Boundary Wall at 3rd.& 4 th Tube Well site for Erasal Water Supply Scheme under Tamluk Sub Division,PHE Dte.. Assistant Engineer Junior Engineer ORD/000783/2022-2023 3019/TD 27/02/2023 60 LITTLE ENGINEERS CO-OPERATIVE SOCIETY LTD. 40.17 39.66 98.73 100
9 PURBA MEDINIPUR Midnapore Mechanical Different works for Providing Functional Household TAP Connection (FHTC) by Augmentation of Erasole Water Supply Scheme. , SM/10396 Augmentation Providing and Installation of Submersible pumping machineries and other electromechanical equipments for Different works for Providing Functional Household TAP Connection (FHTC) by Augmentation of Erasole Water Supply Scheme. in Purba Medinipur District, under JJM Program under MMD PHE Dte. Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Divi Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. ORD/000061/2023-2024 1226/W/MMD 25/04/2023 180 SOUMEN ELECTRIC 26.95 26.58 98.63 100
10 PURBA MEDINIPUR Tamluk Division Different works for Providing Functional Household TAP Connection (FHTC) by Augmentation of Erasole Water Supply Scheme. , SM/10396 Augmentation Jack Pushing of Railway Track Between NANDAKUMAR P.H. & LAVAN SATYAGARH SMARAK P.H. Railway Station on Tamluk-Digha Section of Kharagpur S.E. Railway Division of Purba Medinipur for Augmentation of ERASOLE Piped Water Supply Scheme of 600 mm Dia MS Casing Pipe and 250 mm Dia DI (K7) Carrier Pipe within Tamluk Sub-Division under Tamluk Division, P.H.E DTE. (Total Length =48 Mtr) Nodal Point J393 to J338. Assistant Engineer Junior Engineer ORD/000720/2023-2024 2942/TD 23/11/2023 20 ALPHA ENGINEERS CO-OPERATIVE SOCIETY LTD. 68.57 53.19 77.57 100
11 PURBA MEDINIPUR Tamluk Division Different works for Providing Functional Household TAP Connection (FHTC) by Augmentation of Erasole Water Supply Scheme. , SM/10396 Augmentation Way leave charges of South Eastern Railway Track for Application ID SER-KGP-2023-WL-58 of Erashole PWSS under Tamluk Division, PHE Dte. BILL/01896/2023-2024 BP-2023-24-853 08/02/2024 0 FA & CAO, S.E. RAILWAY, GRC. 5.38 0.00 0 0
12 PURBA MEDINIPUR Tamluk Division Different works for Providing Functional Household TAP Connection (FHTC) by Augmentation of Erasole Water Supply Scheme. , SM/10396 Augmentation Augmentation of ground water based Erasol Water Supply Scheme by providing Laying of Distribution pipe line and FHTC work and Construction of R.C.C. Over Head Reservoir of capacity 1000 cum and staging height 20.00 mtr. with allied work including Sub Soil Investigation within Chandipur Dev. Block under Tamluk Sub Division of Tamluk Division, PHE Dte. Purba Medinipur. Assistant Engineer Junior Engineer ORD/000479/2022-2023 1888/TD 24/11/2022 1038 TARUN KOLEY 1,110.82 768.23 69.16 80
13 PURBA MEDINIPUR Tamluk Division Different works for Providing Functional Household TAP Connection (FHTC) by Augmentation of Erasole Water Supply Scheme. , SM/10396 Augmentation Interconnection with laying of 150 mm dia,200 mm dia & 250 mm dia DI(K-9) rising main from 3rd & 4th. T/W to OHR at Erasole PWSS under Tamluk Sub-Division of Tamluk Division PHE Dte. Assistant Engineer Junior Engineer ORD/000452/2023-2024 1476/TD 14/07/2023 843 SAYAN MAITY 10.15 0.00 0 100
14 PURBA MEDINIPUR Tamluk Division Different works for Providing Functional Household TAP Connection (FHTC) by Augmentation of Erasole Water Supply Scheme. , SM/10396 Augmentation MS structure for canel crossing, NH road boring with casing and concrete piller for Laying distribution system and rising main pipe line at Erasole Water Supply Scheme under Tamluk Sub-Division of Tamluk Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000305/2024-2025 3105/TD 23/09/2024 407 TARUN KOLEY 28.12 0.00 0 100
Total 1,526.07 926.73 60.73