Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
14 466.38 250.07 53.62  
1 PURBA MEDINIPUR Tamluk Division Augmentation of Ground Water Based Piped Supply Scheme for Majna , SM/09335 Augmentation Preparation of D.P.R. for different works for providing Functional Household Tap Connection (FHTC) by Augmentation of Majna Water Supply Scheme under Tamluk Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000166/2021-2022 1170/TD 01/12/2021 7 GEOTECHNICAL ENGINEERS CONSORTIUM 10.34 4.04 39.07 100
2 PURBA MEDINIPUR Tamluk Division Augmentation of Ground Water Based Piped Supply Scheme for Majna , SM/09335 Augmentation Supply & Delivery of different dia Sluice Valve for Augmentation of Majna Water Supply Scheme under Contai Sub- Division, of Tamluk Division, PHE Dte, Purba Medinipur. Assistant Engineer Junior Engineer ORD/000661/2021-2022 2216/TD 22/03/2022 15 BIBEKANANDA DAS 4.06 4.06 100 100
3 PURBA MEDINIPUR Tamluk Division Augmentation of Ground Water Based Piped Supply Scheme for Majna , SM/09335 Augmentation Construction of Boundary Wall (as per Departmental Design & Drawing) for OHR site at Majna BPHC Premises for Majna W/S Scheme under Contai Sub-Division of Tamluk Division, P.H.E.Dte.Purba Medinipur. (for East side & South Side) Assistant Engineer Junior Engineer ORD/000415/2022-2023 373/TD 17/05/2022 28 BIBEKANANDA DAS 3.85 3.50 90.91 100
4 PURBA MEDINIPUR Tamluk Division Augmentation of Ground Water Based Piped Supply Scheme for Majna , SM/09335 Augmentation Construction of Boundary Wall (as per Departmental Design & Drawing) at OHR site( Mouza- Nayabasan ,J.L. No-294, Plot No- 319), for Majna W/S Scheme under Contai Sub-Division of Tamluk Division, P.H.E.Dte.Purba Medinipur. (for West side & North Side) Assistant Engineer Junior Engineer ORD/000412/2022-2023 344/TD 13/05/2022 28 PARTHA CONSTRUCTION 4.84 3.82 78.93 100
5 PURBA MEDINIPUR Midnapore Mechanical Augmentation of Ground Water Based Piped Supply Scheme for Majna , SM/09335 Augmentation Electric Quotation for MAJNA Water Supply Scheme T/W-III, (Ref. ID-204068438) BILL/01930/2023-2024 BP-2023-24-235 08/09/2023 WBSEDCL 3.52 0.00 0 0
6 PURBA MEDINIPUR Tamluk Division Augmentation of Ground Water Based Piped Supply Scheme for Majna , SM/09335 Augmentation Material Requisition To Resource Division RTOR000022/2021-2022 1264/TD 13/12/2021 Resource Division 13.16 0.00 0 0
7 PURBA MEDINIPUR Tamluk Division Augmentation of Ground Water Based Piped Supply Scheme for Majna , SM/09335 Augmentation Material Requisition To Resource Division RTOR000057/2021-2022 1902/TD 23/02/2022 Resource Division 13.73 0.00 0 0
8 PURBA MEDINIPUR Tamluk Division Augmentation of Ground Water Based Piped Supply Scheme for Majna , SM/09335 Augmentation Material Requisition To Resource Division RTOR000086/2021-2022 2217/TD 24/03/2022 Resource Division 20.19 0.00 0 0
9 PURBA MEDINIPUR Tamluk Division Augmentation of Ground Water Based Piped Supply Scheme for Majna , SM/09335 Augmentation Material Requisition To Resource Division RTOR000002/2022-2023 82/TD 08/04/2022 Resource Division 20.19 0.00 0 0
10 PURBA MEDINIPUR Central Drilling Augmentation of Ground Water Based Piped Supply Scheme for Majna , SM/09335 Augmentation Providing drilling crew and other allied works for construction of Tube Well (250mm X150mm X 250 Mtrs. Depth) by utilising Departmental Machineries for Majna W/S Scheme (T/W-III) , Contai-I Block under Purba Medinipur District, Central Drilling Division, P.H.E. Dte. Driller In Charge Junior Engineer ORD/000106/2023-2024 855/CDD 10/07/2023 30 MENAKA ENTERPRISE 14.61 0.00 0 0
11 PURBA MEDINIPUR Midnapore Mechanical Augmentation of Ground Water Based Piped Supply Scheme for Majna , SM/09335 Augmentation Providing and Installation of Submersible pumping machineries and other electromechanical equipments for Augmentation of Ground Water Based Piped Supply Scheme for Majna, Block Contai I, District - Purba Medinipur under JJM Program under MMD PHE Dte. Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Divi Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division ORD/001912/2022-2023 813/W/MMD 24/03/2023 180 MEGA SOLAR ENERGY 11.34 0.00 0 0
12 PURBA MEDINIPUR Tamluk Division Augmentation of Ground Water Based Piped Supply Scheme for Majna , SM/09335 Augmentation Augmentation of ground water based Majna Water Supply Scheme by providing Laying of Distribution pipe line and FHTC work and Construction of RCC Over Head Reservoir of Capacity 250 cum. And staging height 20.00 mtr. With allied work including Sub Soil Investigation within Contai-I Dev. Block under Contai Sub-Division of Tamluk Division, PHE Dte. Purba Medinipur. Assistant Engineer Junior Engineer ORD/000403/2021-2022 1845/TD 15/02/2022 180 DAS ENTERPRISE 324.35 234.65 72.34 100
13 PURBA MEDINIPUR Tamluk Division Augmentation of Ground Water Based Piped Supply Scheme for Majna , SM/09335 Augmentation Name of Work: i) Construction of 3.60 mtr x3.00mtr. Size Switch Room cum Chlorin Room (as per Departmental Design & Drawing) without sanitary & water supply arrangements including Plinth Protection at 3rd TW site for Majna W/S Scheme within Contai-I Block under Contai Sub-Division of Tamluk Division, P.H.E.Dte.Purba Medinipur. (For Normal Land) ii) Construction of Boundary Wall (as per Departmental Design & Drawing) at 3rd TW site for Augmentation of Majna PWSS within Contai -I Block under Contai Sub-Division of Tamluk Division, P.H.E.Dte.Purba Medinipur.(Length-60.00 mtr.) iii) Laying rising main and other allied works Augmentation of Majna W/S Scheme within Contai-I Block under Contai Sub-Division of Tamluk Division, PHE Dte. Purba Medinipur. Assistant Engineer Junior Engineer ORD/000861/2022-2023 3217/TD 14/03/2023 40 SUBRATA KUMAR BERA 19.54 0.00 0 0
14 PURBA MEDINIPUR Tamluk Division Augmentation of Ground Water Based Piped Supply Scheme for Majna , SM/09335 Augmentation Laying of Distribution pipe line by UPVC pipes with allied works due to Construction of drain by Local Panchayet of Majna and its adjoining mouzas Water Supply Scheme within Contai-I Block under Contai Sub-Division of Tamluk Division, PHE Dte. Purba Medinipur district. Assistant Engineer Junior Engineer ORD/000748/2023-2024 1714/CSD 31/08/2023 30 SUBRATA KUMAR BERA 2.66 0.00 0 100
Total 466.36 250.06 53.62