Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 1,479.1 188.36 12.73  
1 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Augmentation of laying distribution system to extend the benefit of 100% Household in ZONE-IV at HIJALHAT under MOGRAHAT-I block within Mega surface water based water supply scheme of Falta-Mathurapur dist.- South 24 pgns. Under south 24 pgns water supply , SM/16187 Augmentation Material Requisition To Resource Division RTOR000063/2023-2024 284/SWD-I 24/04/2023 Resource Division 5.03 0.00 0 0
2 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Augmentation of laying distribution system to extend the benefit of 100% Household in ZONE-IV at HIJALHAT under MOGRAHAT-I block within Mega surface water based water supply scheme of Falta-Mathurapur dist.- South 24 pgns. Under south 24 pgns water supply , SM/16187 Augmentation Design of Route survey of distribution system of Mograhat Zone-IV within Mograhat-I Block for Augmentation of Laying Distribution System, to extend the benefit of 100% households in Zone-IV at HIJALHAT of Mograhat-I Block within "Mega Surface Water Based Water Supply Scheme for Falta-Mathurapur, Dist. South 24-Pgs. under South 24-Pgns W/S Divn-I, P.H.E. Dte. (Route Surveying of 60 KM) [TSM/015076] AE SWSD-II JE4 ORD/000658/2022-2023 3361/SWD-I 09/03/2023 7 GEO SOLUTION 2.38 2.37 99.58 0
3 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Augmentation of laying distribution system to extend the benefit of 100% Household in ZONE-IV at HIJALHAT under MOGRAHAT-I block within Mega surface water based water supply scheme of Falta-Mathurapur dist.- South 24 pgns. Under south 24 pgns water supply , SM/16187 Augmentation Shifting of 2 nos. LT pole for construction of OHR at Alampur under JJM project of PHED BILL/01763/2023-2024 BP-2023-24-617 22/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.32 0.00 0 0
4 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Augmentation of laying distribution system to extend the benefit of 100% Household in ZONE-IV at HIJALHAT under MOGRAHAT-I block within Mega surface water based water supply scheme of Falta-Mathurapur dist.- South 24 pgns. Under south 24 pgns water supply , SM/16187 Augmentation Shifting of 2 nos. LT pole for construction of OHR at Alampur under JJM project of PHED BILL/01763/2023-2024 BP-2023-24-617 22/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.32 0.00 0 0
5 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Augmentation of laying distribution system to extend the benefit of 100% Household in ZONE-IV at HIJALHAT under MOGRAHAT-I block within Mega surface water based water supply scheme of Falta-Mathurapur dist.- South 24 pgns. Under south 24 pgns water supply , SM/16187 Augmentation Construction of 900 Cum. capacity RCC Overhead Reservoir of 20 Mtr. Staging Height as per departmental design, drawing & specification with RCC Bored Pile & Pile Cap including Soil Investigation and foundation design, Boundary Wall and Laying Distribution System including FHTC for Augmentation of Laying Distribution System to extend benefit off 100% household in Zone-IV at HIJALHAT under Mograhat-I Block within Mega Surface Water based Water Supply Scheme of Falta-Mathurapur Dist.-South 24-Parganas under South 24-Pgns. W/S Division-I, PHE Dte. [No. of FHTC = 6310] [TSM/015076] AE SWSD-II JE4 ORD/000125/2023-2024 568/SWD-I 15/05/2023 300 M/S GHOSH AND CO. 1,160.71 185.99 16.02 15
6 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Augmentation of laying distribution system to extend the benefit of 100% Household in ZONE-IV at HIJALHAT under MOGRAHAT-I block within Mega surface water based water supply scheme of Falta-Mathurapur dist.- South 24 pgns. Under south 24 pgns water supply , SM/16187 Augmentation Construction of FHTC platform, road restoration and other allied works for Zone-IV (Hijalhat) to accommodate FHTC in Magrahat-I Block under South 24-Pgns W/S Divn-I, PHE Dte. South 24 Parganas District. ORD/000495/2024-2025 3867/SWD-I 02/09/2024 90 MILAN GHOSH 310.34 0.00 0 0
Total 1,479.10 188.36 12.73