Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
15 357.65 56.25 15.73  
1 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Proposed Ground water based DUDHNAI piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, South 24 Parganas District for AUGMENTATION of surface water based Water Supply scheme in the Arsenic Affected Area , SM/16118 Augmentation Material Requisition To Resource Division RTOR000123/2023-2024 295/SWD-I 25/04/2023 Resource Division 25.32 0.00 0 0
2 SOUTH 24 PARAGANAS S24 Pgns Mechanical Proposed Ground water based DUDHNAI piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, South 24 Parganas District for AUGMENTATION of surface water based Water Supply scheme in the Arsenic Affected Area , SM/16118 Augmentation Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 1 & 2 of Dudhnai water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Baruipur] Assistant Engineer Junior Engineer ORD/000086/2023-2024 1066/SMD 18/04/2023 90 B.T.PROJECTS PVT.LTD. 22.37 0.00 0 0
3 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Proposed Ground water based DUDHNAI piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, South 24 Parganas District for AUGMENTATION of surface water based Water Supply scheme in the Arsenic Affected Area , SM/16118 Augmentation Sinking of 02 (Two) nos. Rig bored 250mm x 150mm dia. & 300 mtr. deep Tubewell having 66 mtr. housing pipe by Rotary method for DUDHNAI PWSS of BARUIPUR Block for Augmentation of Surface Water Based W/S Scheme in the Arsenic Affected Areas of South 24 Pgs district under South 24- Parganas W/S Division-I, P.H.E. Dte. [TSM/017763] AE BSD JE RWS ORD/000650/2022-2023 3322/SWD-I 06/03/2023 30 MAHI CONSTRUCTION 31.77 15.29 48.13 50
4 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Proposed Ground water based DUDHNAI piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, South 24 Parganas District for AUGMENTATION of surface water based Water Supply scheme in the Arsenic Affected Area , SM/16118 Augmentation Preparation and submission of Detailed Project Report of Ground Water Based Dudhnai Piped Water Supply Scheme to accommodate FHTC in Baruipur Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme in the Arsenic affected areas of South 24-Pgns. district. ORD/000940/2022-2023 1257/SWD-I 09/09/2022 30 GEO SOLUTION 2.50 1.23 49.2 100
5 SOUTH 24 PARAGANAS S24 Pgns Mechanical Proposed Ground water based DUDHNAI piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, South 24 Parganas District for AUGMENTATION of surface water based Water Supply scheme in the Arsenic Affected Area , SM/16118 Augmentation PAYMENT OF ELECTRICITY BILL FOR NEW SERVICE CONNECTION UNDER SMD PHE DTE. BILL/04684/2023-2024 BP-2023-24-502 12/02/2024 WBSEDCL 9.99 0.00 0 0
6 SOUTH 24 PARAGANAS S24 Pgns Mechanical Proposed Ground water based DUDHNAI piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, South 24 Parganas District for AUGMENTATION of surface water based Water Supply scheme in the Arsenic Affected Area , SM/16118 Augmentation Payment of electricity bill for new service connection under SMD, PHE Dte. BILL/00129/2024-2025 BP-2024-25-33 24/04/2024 WBSEDCL 6.66 0.00 0 0
7 SOUTH 24 PARAGANAS S24 Pgns Mechanical Proposed Ground water based DUDHNAI piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, South 24 Parganas District for AUGMENTATION of surface water based Water Supply scheme in the Arsenic Affected Area , SM/16118 Augmentation Payment of electricity bill for new service connection under SMD, PHE Dte. BILL/00129/2024-2025 BP-2024-25-33 24/04/2024 WBSEDCL 6.66 0.00 0 0
8 SOUTH 24 PARAGANAS S24 Pgns Mechanical Proposed Ground water based DUDHNAI piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, South 24 Parganas District for AUGMENTATION of surface water based Water Supply scheme in the Arsenic Affected Area , SM/16118 Augmentation Additional Charges for service connection at pump house no-I of Dudhnai.(Baruipur Block) BILL/00407/2024-2025 BP-2024-25-99 10/06/2024 WBSEDCL 2.65 0.00 0 null
9 SOUTH 24 PARAGANAS S24 Pgns Mechanical Proposed Ground water based DUDHNAI piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, South 24 Parganas District for AUGMENTATION of surface water based Water Supply scheme in the Arsenic Affected Area , SM/16118 Augmentation Improvement of outdoor Illumination arrangement with allied works at Pump House no-1 of Dudhnai W/S scheme under SMD, P.H.E. Dte.(Block-Baruipur) (SM/16118) Assistant Engineer Junior Engineer ORD/000143/2024-2025 933/SMSD 28/06/2024 15 B.T.PROJECTS PVT.LTD. 0.91 0.00 0 0
10 SOUTH 24 PARAGANAS S24 Pgns Mechanical Proposed Ground water based DUDHNAI piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, South 24 Parganas District for AUGMENTATION of surface water based Water Supply scheme in the Arsenic Affected Area , SM/16118 Augmentation Improvement of outdoor Illumination arrangement with allied works at Pump House no-2 of Dudhnai W/S scheme under SMD, P.H.E. Dte.(Block-Baruipur) (SM/16118) Assistant Engineer Junior Engineer ORD/000142/2024-2025 934/SMSD 28/06/2024 15 B.T.PROJECTS PVT.LTD. 0.91 0.00 0 0
11 SOUTH 24 PARAGANAS S24 Pgns Mechanical Proposed Ground water based DUDHNAI piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, South 24 Parganas District for AUGMENTATION of surface water based Water Supply scheme in the Arsenic Affected Area , SM/16118 Augmentation Supply & Fixing main switch & Bus bar at Pump House no-1 & 2 of Dudhnai W/S Scheme under SMD, P.H.E. Dte.(Block-Baruipur)(SM/16118) Assistant Engineer Junior Engineer ORD/000212/2024-2025 928/SMSD 28/06/2024 15 B.T.PROJECTS PVT.LTD. 0.58 0.00 0 0
12 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Proposed Ground water based DUDHNAI piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, South 24 Parganas District for AUGMENTATION of surface water based Water Supply scheme in the Arsenic Affected Area , SM/16118 Augmentation Construction of platfrom for FHTC, restoration of road after laying of Pipeline, Land devolopment and other allied works for "Ground Water Based DUDHNAI Piped Water Supply Scheme to Accommodate FHTC in BARUIPUR Block Under South 24 Parganas W/S Division-I, PHE Dte. For Augmentation of Surface Water Based Water Supply Scheme In Arsenic Affected Areas of South 24 Parganas District." (SM/16118) ORD/000375/2024-2025 3548/SWD-I 09/08/2024 45 A.G.S. ENTERPRISE 87.42 0.00 0 0
13 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Proposed Ground water based DUDHNAI piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, South 24 Parganas District for AUGMENTATION of surface water based Water Supply scheme in the Arsenic Affected Area , SM/16118 Augmentation Construction of Pump house cum Chlorine Room, Boundary Wall along with Laying of Distribution System, Rising Main, Providing Functional Household Tap Connection (FHTC) for DUDHNAI Piped Water Supply Scheme of BARUIPUR Block for implementation of JJM under Surface Water Based Water Supply Scheme in the Arsenic affected areas of South 24-Pgns district. [No. of FHTC = 661] [TSM/017763] AE BSD JE RWS ORD/000305/2023-2024 1694/SWD-I 07/08/2023 90 A.G.S. ENTERPRISE 151.11 39.73 26.29 90
14 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Proposed Ground water based DUDHNAI piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, South 24 Parganas District for AUGMENTATION of surface water based Water Supply scheme in the Arsenic Affected Area , SM/16118 Augmentation Distressed / Affected stretches of different road under P&RD Deptt. in West Bengal due to pipeline laying work by PHED [Sl. No.32] BILL/00492/2024-2025 BP-2024-25-293 11/09/2024 WBSRDA SOUTH 24 PGS ALIPORE 4.40 0.00 0 0
15 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Proposed Ground water based DUDHNAI piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, South 24 Parganas District for AUGMENTATION of surface water based Water Supply scheme in the Arsenic Affected Area , SM/16118 Augmentation Distressed / Affected stretches of different road under P&RD Deptt. in West Bengal due to pipeline laying work by PHED [Sl. No.32] BILL/00492/2024-2025 BP-2024-25-293 11/09/2024 WBSRDA SOUTH 24 PGS ALIPORE 4.40 0.00 0 0
Total 357.67 56.25 15.73