Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 382.45 83.86 21.93  
1 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I JAGULGACHHI piped water supply scheme to accommodate FHTC in BHANGAR-I block under South 24 Parganas W/S Division-I for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 Parganas District Under JJM , SM/15754 Augmentation Material Requisition To Resource Division RTOR000046/2023-2024 287/SWD-I 24/04/2023 Resource Division 24.11 0.00 0 0
2 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I JAGULGACHHI piped water supply scheme to accommodate FHTC in BHANGAR-I block under South 24 Parganas W/S Division-I for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 Parganas District Under JJM , SM/15754 Augmentation Material Requisition To Resource Division RTOR000216/2023-2024 1007/SWD- I 09/06/2023 Resource Division 12.87 0.00 0 0
3 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I JAGULGACHHI piped water supply scheme to accommodate FHTC in BHANGAR-I block under South 24 Parganas W/S Division-I for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 Parganas District Under JJM , SM/15754 Augmentation Sinking of 02 (Two) nos. Rig bored 250mm x 150mm dia. & 300 mtr. deepTubewell having 66 mtr. housing pipe by Rotary method for JAGULGACHI PWSS of BHANGAR-I block for Augmentation of Surface Water Based W/S Scheme in the Arsenic Affected Areas of South 24 Pgs district under South 24-Parganas W/S Division-I, P.H.E. Dte. [TSM/018474] AE HQ-I JE RWS, Bhangar-II Block ORD/000639/2022-2023 3287/SWD-I 03/03/2023 30 M/S MONDAL ENTERPRISE 31.76 7.26 22.86 50
4 SOUTH 24 PARAGANAS S24 Pgns Mechanical JAGULGACHHI piped water supply scheme to accommodate FHTC in BHANGAR-I block under South 24 Parganas W/S Division-I for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 Parganas District Under JJM , SM/15754 Augmentation Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 1 & 2 of Jagulgachhi water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Bhangar-I] Assistant Engineer Junior Engineer ORD/001516/2022-2023 896/SMD 27/03/2023 90 GLACIER ENGINEERING CO. 23.44 0.00 0 0
5 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I JAGULGACHHI piped water supply scheme to accommodate FHTC in BHANGAR-I block under South 24 Parganas W/S Division-I for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 Parganas District Under JJM , SM/15754 Augmentation Laying Distribution System, Rising Main, Functional Household Tap Connection (FHTC) and construction of Pump House cum Chlorine Room (2 Nos.) for JAGULGACHI Piped Water Supply Scheme to accommodate FHTC in Bhangar-I Block for Augmentation of Surface Water Based W/S Scheme in the Arsenic Affected Areas of South 24-Parganas District under Jal Jeevan Mission. (No of FHTC = 2089) (TSM/018474) AE HQ-I,AE HQ-II JE RWS, Bhangar-II Block,JE-4 ORD/000035/2023-2024 125/SWD-I 12/04/2023 90 A P POWER AND CONCRETE 279.50 76.60 27.41 10
6 SOUTH 24 PARAGANAS S24 Pgns Mechanical JAGULGACHHI piped water supply scheme to accommodate FHTC in BHANGAR-I block under South 24 Parganas W/S Division-I for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 Parganas District Under JJM , SM/15754 Augmentation Quotation for new service(power) connection at Jagulgachi PH-1 water supply scheme under bhangar-I block Reference ID- 106492239, Application No-1007561863 BILL/00566/2024-2025 BP-2024-25-139 03/07/2024 WBSEDCL 0.71 0.00 0 null
7 SOUTH 24 PARAGANAS S24 Pgns Mechanical JAGULGACHHI piped water supply scheme to accommodate FHTC in BHANGAR-I block under South 24 Parganas W/S Division-I for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 Parganas District Under JJM , SM/15754 Augmentation Quotation for new service(power) connection at Jagulgachi PH-1 water supply scheme under bhangar-I block Reference ID- 106492239, Application No-1007561863 BILL/00566/2024-2025 BP-2024-25-139 03/07/2024 WBSEDCL 0.71 0.00 0 null
8 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I JAGULGACHHI piped water supply scheme to accommodate FHTC in BHANGAR-I block under South 24 Parganas W/S Division-I for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 Parganas District Under JJM , SM/15754 Augmentation Upgradation of Pumphouse, Cholorine room, Pathway & other allied works at Head work site of "JAGULGACHHI Piped Water Supply Scheme to accommodate FHTC in Bhangar-I Block under South 24-Parganas, W/S Division-I, PHE Dte. for Augmentation of Surface Water Based W/S Scheme in the Arsenic Affected Areas of South 24-Parganas District under Jal Jeevan Mission". (SM/15754) ORD/000430/2024-2025 3872/SWD-I 03/09/2024 30 TOJO ENTERPRISE 9.35 0.00 0 0
Total 382.45 83.86 21.93