Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 27.68 16.27 58.78  
1 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Construction and installation of MANIFOLD and allied works at OHR site of Zone-9, Bishnupur-II Block, under of Surface Water Based Water Supply Scheme in the arsenic affected areas of south 24 parganas district. , SM/13370 Augmentation Laying of 300 mm dia MS & DI distribution pipe line from proposed Manifold to existing distribution pipeline with interconnection at zone 9 Head Works Site under Surface Water Based Water Supply scheme in the Arsenic affected areas of South 24-pgs. Dist. AE SWSD-II JE2 ORD/000247/2022-2023 1733/SWD-I 03/11/2022 15 SRIJON ENTERPRISE 4.09 1.74 42.54 20
2 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Construction and installation of MANIFOLD and allied works at OHR site of Zone-9, Bishnupur-II Block, under of Surface Water Based Water Supply Scheme in the arsenic affected areas of south 24 parganas district. , SM/13370 Augmentation Supplying and laying of 450 mm dia 8 mm thickness MS Casing pipe by open cutting method at two (2) places including supplying and laying of 300 mm and 250 mm dia MS Water Distribution pipeline across the PWD road (Bakrahat-Thakurpukur) near zone 9 Head Work Site under SWBWSS in the Arsenic affected areas of South 24-pgs. Dist. AE SWSD-II JE2 ORD/000249/2022-2023 1735/SWD-I 03/11/2022 15 SRIJON ENTERPRISE 6.05 1.11 18.35 20
3 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Construction and installation of MANIFOLD and allied works at OHR site of Zone-9, Bishnupur-II Block, under of Surface Water Based Water Supply Scheme in the arsenic affected areas of south 24 parganas district. , SM/13370 Augmentation Laying of 250 mm dia MS & DI distribution pipe line from proposed Manifold to existing distribution pipeline with interconnection at zone 9 Head Work Site under Surface Water Based Water Supply scheme in the Arsenic affected areas of South 24-pgs. Dist. AE SWSD-II JE2 ORD/000248/2022-2023 1734/SWD-I 03/11/2022 15 SRIJON ENTERPRISE 3.24 1.14 35.19 20
4 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Construction and installation of MANIFOLD and allied works at OHR site of Zone-9, Bishnupur-II Block, under of Surface Water Based Water Supply Scheme in the arsenic affected areas of south 24 parganas district. , SM/13370 Augmentation Construction of M.S. Manifold of 1000 mm dia 10 mm thickness for Improvement of Water Supply at Zone 9 Head Work Site under Surface Water Based Water Supply scheme in the Arsenic affected areas of South 24-pgs. Dist. AE SWSD-II JE2 ORD/000245/2022-2023 1731/SWD-I 03/11/2022 15 SRIJON ENTERPRISE 4.38 3.03 69.18 20
5 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Construction and installation of MANIFOLD and allied works at OHR site of Zone-9, Bishnupur-II Block, under of Surface Water Based Water Supply Scheme in the arsenic affected areas of south 24 parganas district. , SM/13370 Augmentation Laying a rising main from existing pump house to nearer distribution line of Zone- 8 and Zone - 9 for boosting existing scheme which arise after successfully installation of manifold in connection with Construction and installation of Manifold and allied works at OHR site of Zone-9, Bishnupur-II Block, under surface water based water supply scheme in the arsenic affected areas of South 24 Pgs. district. (TSM/014338) AE SWSD-II ORD/000249/2023-2024 1491/SWD-I 19/07/2023 30 SRIJON ENTERPRISE 6.56 6.45 98.32 100
6 SOUTH 24 PARAGANAS South 24 Pgs W/S Division I Construction and installation of MANIFOLD and allied works at OHR site of Zone-9, Bishnupur-II Block, under of Surface Water Based Water Supply Scheme in the arsenic affected areas of south 24 parganas district. , SM/13370 Augmentation Construction of foundation with supporting arrangement including erection of M.S. Manifold and distribution pipeline & some allied works at zone 9 Head Works Site under SWBWSS in the Arsenic affected areas of South 24-pgs. Dist. AE SWSD-II ORD/000246/2022-2023 1732/SWD-I 03/11/2022 15 SRIJON ENTERPRISE 3.36 2.80 83.33 100
Total 27.68 16.26 58.75