Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
13 733.82 77.2 10.52  
1 SOUTH 24 PARAGANAS Baruipur South 24 Pgs W/S Division I Ground water based piped water supply scheme for Champahati (Zone-II) PWSS, Under South 24-Pgns W/S Division-I, Block: Baruipur District South 24-Pgns. , SM/12873 New Material Requisition To Resource Division RTOR000087/2023-2024 294/SWD-I 25/04/2023 Resource Division 18.42 0.00 0 0
2 SOUTH 24 PARAGANAS Baruipur South 24 Pgs W/S Division I Ground water based piped water supply scheme for Champahati (Zone-II) PWSS, Under South 24-Pgns W/S Division-I, Block: Baruipur District South 24-Pgns. , SM/12873 New Construction of 02 (Two) nos. chlorination rooms at Champahati (Zone-II) at Baruipur Block under Surface Water Based Water Supply Scheme in the Arsenic affected areas under South 24-Pgns Water Supply Divn-I, PHE Dte. AE BSD ORD/000358/2022-2023 2201/SWD-I 13/12/2022 60 THE DESIGN IN 10.72 0.00 0 0
3 SOUTH 24 PARAGANAS Baruipur S24 Pgns Mechanical Ground water based piped water supply scheme for Champahati (Zone-II) PWSS, Under South 24-Pgns W/S Division-I, Block: Baruipur District South 24-Pgns. , SM/12873 New Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 1&2, Zone-II of Champahati water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Baruipur] Assistant Engineer Junior Engineer ORD/000534/2022-2023 461/SMD 17/02/2023 90 NUPUR CHANDRA HALDER 19.65 4.42 22.49 0
4 SOUTH 24 PARAGANAS Baruipur South 24 Pgs W/S Division I Ground water based piped water supply scheme for Champahati (Zone-II) PWSS, Under South 24-Pgns W/S Division-I, Block: Baruipur District South 24-Pgns. , SM/12873 New Preparation and submission of Detailed Project Report of CHAMPAHATI(II) Ground Water Based Piped Water Supply Scheme in BARUIPUR PURBA Assembly Constituency of BARUIPUR Block under Surface Water Based Water Supply Scheme in the Arsenic affected areas of South 24-Pgns. district. AE BSD ORD/000446/2021-2022 1954/SWD-I 27/01/2022 30 MS R. DUTTA AND CO 2.76 2.76 100 100
5 SOUTH 24 PARAGANAS Baruipur S24 Pgns Mechanical Ground water based piped water supply scheme for Champahati (Zone-II) PWSS, Under South 24-Pgns W/S Division-I, Block: Baruipur District South 24-Pgns. , SM/12873 New Payment of electricity bill for new service connection under SMD, PHE Dte. BILL/01726/2023-2024 BP-2023-24-198 09/08/2023 WBSEDCL 7.37 0.00 0 0
6 SOUTH 24 PARAGANAS Baruipur South 24 Pgs W/S Division I Ground water based piped water supply scheme for Champahati (Zone-II) PWSS, Under South 24-Pgns W/S Division-I, Block: Baruipur District South 24-Pgns. , SM/12873 New Material Requisition To Resource Division RTOR000302/2023-2024 2440/SWD-I 30/09/2023 Resource Division 48.26 0.00 0 0
7 SOUTH 24 PARAGANAS Baruipur South 24 Pgs W/S Division I Ground water based piped water supply scheme for Champahati (Zone-II) PWSS, Under South 24-Pgns W/S Division-I, Block: Baruipur District South 24-Pgns. , SM/12873 New Sinking of Rig bored 02 (Two) nos. 300mm X 200mm dia & 300 mtr. deep Tubewell by Rotary method for CHAMPAHATI (ZONE-II) PWSS of Baruipur Block Under South 24 Paraganas W/S Division-I, PHE Dte. [TSM/010745] AE BSD JE-2 ORD/000214/2022-2023 1586/SWD-I 17/10/2022 30 TAPAS KUMAR GIRI 40.13 17.36 43.26 100
8 SOUTH 24 PARAGANAS Baruipur South 24 Pgs W/S Division I Ground water based piped water supply scheme for Champahati (Zone-II) PWSS, Under South 24-Pgns W/S Division-I, Block: Baruipur District South 24-Pgns. , SM/12873 New Additional work for Sinking of 02 (Two) nos. Rig bored 300mm X 200mm dia & 300 mtr. deep Tubewell to achieve 66 mtr. housing pipe by Rotary method for Water supply arrangement for PWSS of CHAMPAHATI (Zone-II) PWSS of Baruipur Block for Augmentation of Surface Water Based W/S Scheme in the Arsenic Affected Areas of South 24-Pgns. district under South 24 Paraganas Water Supply Division-I, PHE Dte. [TSM/010745] AE BSD JE-2 ORD/000455/2023-2024 2112/SWD-I 30/08/2023 15 TAPAS KUMAR GIRI 4.41 2.11 47.85 100
9 SOUTH 24 PARAGANAS Baruipur S24 Pgns Mechanical Ground water based piped water supply scheme for Champahati (Zone-II) PWSS, Under South 24-Pgns W/S Division-I, Block: Baruipur District South 24-Pgns. , SM/12873 New Additional quotation for power connection at Champahat Zone-II P-1 BILL/00285/2024-2025 BP-2024-25-76 22/05/2024 WBSEDCL 1.04 0.00 0 null
10 SOUTH 24 PARAGANAS Baruipur S24 Pgns Mechanical Ground water based piped water supply scheme for Champahati (Zone-II) PWSS, Under South 24-Pgns W/S Division-I, Block: Baruipur District South 24-Pgns. , SM/12873 New Additional quotation for power connection at Champahat Zone-II P-1 BILL/00285/2024-2025 BP-2024-25-76 22/05/2024 WBSEDCL 1.04 0.00 0 null
11 SOUTH 24 PARAGANAS Baruipur S24 Pgns Mechanical Ground water based piped water supply scheme for Champahati (Zone-II) PWSS, Under South 24-Pgns W/S Division-I, Block: Baruipur District South 24-Pgns. , SM/12873 New Supply & Fixing main switch & Bus bar at Pump House no-1 & 2 (Zone-II) of Champahat W/S Scheme under SMD, P.H.E. Dte.(Block-Baruipur)(SM/12873) Assistant Engineer Junior Engineer ORD/000219/2024-2025 926/SMSD 28/06/2024 15 NUPUR CHANDRA HALDER 0.58 0.00 0 0
12 SOUTH 24 PARAGANAS Baruipur S24 Pgns Mechanical Ground water based piped water supply scheme for Champahati (Zone-II) PWSS, Under South 24-Pgns W/S Division-I, Block: Baruipur District South 24-Pgns. , SM/12873 New Improvement of outdoor Illumination arrangement with allied works at Pump House no-1 of Champahati (Zone-II) W/S Scheme under SMD, P.H.E. Dte. (Block-Baruipur) Assistant Engineer Junior Engineer ORD/002470/2023-2024 289/SMSD 07/03/2024 15 NUPUR CHANDRA HALDER 0.80 0.00 0 100
13 SOUTH 24 PARAGANAS Baruipur South 24 Pgs W/S Division I Ground water based piped water supply scheme for Champahati (Zone-II) PWSS, Under South 24-Pgns W/S Division-I, Block: Baruipur District South 24-Pgns. , SM/12873 New Construction of 500 m3 capacity 20 M. staging height R.C.C. Over Head Water Reservoir as per departmental design, drawing & specification including R.C.C. Bored Pile & Pile Cap after soil investigation alongwith Providing 100% FHTC & Laying distribution system from Big dia deep Tube Well at CHAMPAHATI (Zone-II) Mouza of BARUIPUR Block due to improvement of water supply in the water Scarcity area/non command area under Surface Water Based Water Supply Scheme in the Arsenic affected areas of South 24-Pgns district. (No. of FHTC = 2991) AE BSD JE RWS ORD/000570/2023-2024 2667/SWD-I 31/10/2023 300 RKS ENGINEER & CONTRACTOR 578.64 50.55 8.74 40
Total 733.82 77.20 10.52