Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
15 521.17 67.76 13  
1 SOUTH 24 PARAGANAS Bishnupur - I South 24 Pgs W/S Division I Proposed ground water based BHARU RAMKRISHNAPUR piped water supply scheme to accommodate FHTC in BISHNUPUR-I Block under South 24 pgns W/S Division-I, South 24 Parganas District. , SM/11497 New Preparation and submission of Detailed Project Report of "BHARU RAMKRISHNAPUR Ground Water Based Piped Water Supply Scheme" in BISHNUPUR-I block under Surface Water Based Water Supply Scheme in the Arsenic affected areas of South 24-Pgns. district. AE SWSD-II ORD/000402/2022-2023 463/SWD-I 24/05/2022 15 GEO SOLUTION 2.55 2.55 100 100
2 SOUTH 24 PARAGANAS Bishnupur - I South 24 Pgs W/S Division I Proposed ground water based BHARU RAMKRISHNAPUR piped water supply scheme to accommodate FHTC in BISHNUPUR-I Block under South 24 pgns W/S Division-I, South 24 Parganas District. , SM/11497 New Material Requisition To Resource Division RTOR000108/2022-2023 3249/SWD-I 01/03/2023 Resource Division 59.00 0.00 0 0
3 SOUTH 24 PARAGANAS Bishnupur - I S24 Pgns Mechanical Proposed ground water based BHARU RAMKRISHNAPUR piped water supply scheme to accommodate FHTC in BISHNUPUR-I Block under South 24 pgns W/S Division-I, South 24 Parganas District. , SM/11497 New Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 1&2, of Bharu Ramkrishnapur water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Bishnupur-I] Assistant Engineer -II Junior Engineer ORD/000541/2022-2023 472/SMD 20/02/2023 90 AHALYA ENGINEERING WORKS 26.76 0.00 0 0
4 SOUTH 24 PARAGANAS Bishnupur - I South 24 Pgs W/S Division I Proposed ground water based BHARU RAMKRISHNAPUR piped water supply scheme to accommodate FHTC in BISHNUPUR-I Block under South 24 pgns W/S Division-I, South 24 Parganas District. , SM/11497 New Sinking of Rig bored 250mm x 150mm dia. & 300 mtr. Deep Tubewell by Rotary method for BHARU RAMKRISHNAPUR PIPE WATER SUPPLY SCHEME in the Arsenic affected areas of South 24 Pgs. Dist. in BISHNUPUR-I Block under South 24 Pgs W/S Sub-Division-II, P.H.E. Dte. AE SWSD-II JE2 ORD/000034/2022-2023 918/SWD-I 19/07/2022 30 SIMPLEX DRILLING CO. 14.19 13.40 94.43 100
5 SOUTH 24 PARAGANAS Bishnupur - I South 24 Pgs W/S Division I Proposed ground water based BHARU RAMKRISHNAPUR piped water supply scheme to accommodate FHTC in BISHNUPUR-I Block under South 24 pgns W/S Division-I, South 24 Parganas District. , SM/11497 New Additional work for sinking of Rig bored 250 mm x 150 mm dia. & 300 mtr. deep Tube well to achieve 66 mtr. housing pipe by Rotary Method for BHARU RAMKRISHNAPUR PWSS of Bishnupur-I Block for Augmentation of Surface Water Based W/S Scheme in the Arsenic Affected Areas of South 24-Parganas district under South 24-Parganas W/S Division- I, P.H.E. Dte. [TSM/011211] AE SWSD-II JE2 ORD/000570/2022-2023 2974/SWD-I 17/02/2023 15 SIMPLEX DRILLING COMPANY 1.58 1.58 100 100
6 SOUTH 24 PARAGANAS Bishnupur - I S24 Pgns Mechanical Proposed ground water based BHARU RAMKRISHNAPUR piped water supply scheme to accommodate FHTC in BISHNUPUR-I Block under South 24 pgns W/S Division-I, South 24 Parganas District. , SM/11497 New Payment of electricity bill for new service connection under SMD, PHE Dte. BILL/01058/2023-2024 BP-2023-24-126 17/07/2023 WBSEDCL 7.84 0.00 0 0
7 SOUTH 24 PARAGANAS Bishnupur - I South 24 Pgs W/S Division I Proposed ground water based BHARU RAMKRISHNAPUR piped water supply scheme to accommodate FHTC in BISHNUPUR-I Block under South 24 pgns W/S Division-I, South 24 Parganas District. , SM/11497 New Material Requisition To Resource Division RTOR000017/2022-2023 1583/SWD-I 17/10/2022 Resource Division 5.25 0.00 0 0
8 SOUTH 24 PARAGANAS Bishnupur - I South 24 Pgs W/S Division I Proposed ground water based BHARU RAMKRISHNAPUR piped water supply scheme to accommodate FHTC in BISHNUPUR-I Block under South 24 pgns W/S Division-I, South 24 Parganas District. , SM/11497 New Construction of (Size 4.80mX3.66m) Pump House with water supply and sanitary arrangement (as per Deptt. drawing) of BHARU RAMKRISHNAPUR Pipe Water Supply Scheme in Bishnupur-I block under South 24-Pgns W/S Divn-I, PHE Dte. (SM/11497) AE SWSD-II JE2 ORD/000431/2022-2023 2575/SWD-I 10/01/2023 60 OHAB SK. 6.05 0.00 0 1
9 SOUTH 24 PARAGANAS Bishnupur - I South 24 Pgs W/S Division I Proposed ground water based BHARU RAMKRISHNAPUR piped water supply scheme to accommodate FHTC in BISHNUPUR-I Block under South 24 pgns W/S Division-I, South 24 Parganas District. , SM/11497 New Sinking of Rig bored 250mm x 150mm dia. & 300 mtr. deepTubewell having 66 mtr. housing pipe by Rotary method at Second Tubewell site for BHARU RAMKRISHNAPUR PWSS of BISHNUPUR-I block for Augmentaion of Surface Water Based W/S Scheme in the Arsenic Affected Areas of South 24 Pgs district under South 24-Parganas W/S Division-I, P.H.E. Dte. [TSM/011211] AE SWSD-II JE2 ORD/000585/2022-2023 3106/SWD-I 24/02/2023 30 MOULI CONSTRUCTION 15.89 0.00 0 0
10 SOUTH 24 PARAGANAS Bishnupur - I South 24 Pgs W/S Division I Proposed ground water based BHARU RAMKRISHNAPUR piped water supply scheme to accommodate FHTC in BISHNUPUR-I Block under South 24 pgns W/S Division-I, South 24 Parganas District. , SM/11497 New Development of low land and temporary aproach road for entering Tubewell site for proposed BHARU RAMKRISHNAPUR Piped Water Supply Scheme in Bishnupur-I Block for Augmentation of Surface Water Based Water Supply Scheme in the Arsenic Affected Areas of South 24 Pgs. Dist. under South 24 Pgs. Water Supply Division-I, PHE Dte. [TSM/011211] AE SWSD-II JE2 ORD/000812/2022-2023 3704/SWD-I 30/03/2023 15 SIMPLEX DRILLING COMPANY 0.60 0.60 100 100
11 SOUTH 24 PARAGANAS Bishnupur - I S24 Pgns Mechanical Proposed ground water based BHARU RAMKRISHNAPUR piped water supply scheme to accommodate FHTC in BISHNUPUR-I Block under South 24 pgns W/S Division-I, South 24 Parganas District. , SM/11497 New Payment of electricity bill for new service connection under SMD, PHE Dte. BILL/04458/2023-2024 BP-2023-24-452 09/01/2024 WBSEDCL 2.36 0.00 0 0
12 SOUTH 24 PARAGANAS Bishnupur - I South 24 Pgs W/S Division I Proposed ground water based BHARU RAMKRISHNAPUR piped water supply scheme to accommodate FHTC in BISHNUPUR-I Block under South 24 pgns W/S Division-I, South 24 Parganas District. , SM/11497 New Land Development at 1st Tubewell site including development of approach road under Bharu Ramkrishnapur Piped Water Supply Scheme to accommodate FHTC in Bishnupur-I Block under South 24-Pgns Water Supply Division-I, PHE Dte. (TSM/011211) AE SWSD-II JE2 ORD/000730/2023-2024 435/SWD-I 22/01/2024 15 ROYAL CONSTRUCTION 8.92 3.25 36.43 50
13 SOUTH 24 PARAGANAS Bishnupur - I South 24 Pgs W/S Division I Proposed ground water based BHARU RAMKRISHNAPUR piped water supply scheme to accommodate FHTC in BISHNUPUR-I Block under South 24 pgns W/S Division-I, South 24 Parganas District. , SM/11497 New Laying Distribution System with providing Functional Household Tap Connection (FHTC) for Proposed BHARU RAMKRISHNAPUR PIPE WATER SUPPLY SCHEME for Augmentation of Surface Water Supply Scheme in the Arsenic affected areas of South 24-Pgs. Dist. in BISHNUPUR-I Block under South 24 Pgs W/S Sub-Division -II, P.H.E. Dte. [No. of FHTC = 853] AE SWSD-II JE2 ORD/000151/2022-2023 1391/SWD-I 21/09/2022 90 ODISSI INNOVATIONS ENGINEERS PVT. LTD. 132.60 46.38 34.98 30
14 SOUTH 24 PARAGANAS Bishnupur - I South 24 Pgs W/S Division I Proposed ground water based BHARU RAMKRISHNAPUR piped water supply scheme to accommodate FHTC in BISHNUPUR-I Block under South 24 pgns W/S Division-I, South 24 Parganas District. , SM/11497 New Construction of Boundary Wall & other allied works at 12 (twelve) nos. Head Work Sites of different PWSS within Bishnupur-I Block, Dist.-South 24-Parganas for Augmentation of Surface Water based Water Supply Scheme in the Arsenic Affected areas of South 24-Parganas District. AE SWSD-II JE1,JE2,JE4 ORD/000209/2023-2024 1377/SWD-I 12/07/2023 150 CONCORD PROJECTS PVT. LTD. 105.47 0.00 0 15
15 SOUTH 24 PARAGANAS Bishnupur - I South 24 Pgs W/S Division I Proposed ground water based BHARU RAMKRISHNAPUR piped water supply scheme to accommodate FHTC in BISHNUPUR-I Block under South 24 pgns W/S Division-I, South 24 Parganas District. , SM/11497 New Laying rising main and additional pipeline for distribution system, construction of boundary wall, pump house, approach road and land development for BHARU RAMKRISHNAPUR PWSS of Bishnupur -I Block under South 24-Pgns W/S Divn-I, PHE Dte. Dist. South 24 Paraganas (SM/11497) ORD/000351/2024-2025 3363/SWD-I 26/07/2024 60 ODISSI INNOVATIONS 132.11 0.00 0 0
Total 521.18 67.75 13