Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
11 3,250.32 102.3 3.15  
1 S24 Pgns Mechanical AUGMENTATION OF SONAKHALI (ZONE-III) PIPED WATER SUPPLY SCHEME, BLOCK-BASANTI,DISTRICT-SOUTH 24 PARGANAS , Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 1, Zone-III for Augmentation of Sonakhali water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Basanti] Assistant Engineer Junior Engineer ORD/001512/2022-2023 888/SMD 24/03/2023 90 MAA TARA ENTERPRISE 10.41 0.00 0 0
2 Alipore Division AUGMENTATION OF SONAKHALI (ZONE-III) PIPED WATER SUPPLY SCHEME, BLOCK-BASANTI,DISTRICT-SOUTH 24 PARGANAS , Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Sonakhali W/S Scheme (Zone-III) , Block - Basanti under Canning Sub-Division of Alipore Division, PHE Dte. Assistant Engineer, Canning sub division Junior Engineer, 2 CSD ORD/000502/2023-2024 2060/AD 07/08/2023 45 MAA SOLAR ENTERPRISE 7.11 0.00 0 0
3 Alipore Division AUGMENTATION OF SONAKHALI (ZONE-III) PIPED WATER SUPPLY SCHEME, BLOCK-BASANTI,DISTRICT-SOUTH 24 PARGANAS , Sinking of 250mm x 150mm dia. 360 mtr. deep Tubewell by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter of Sonakhali (Zone - III) W/S Scheme, Block - Basanti under Canning Sub Division of Alipore Division, PHE Dte. Assistant Engineer, Canning sub division Junior Engineer, 2 CSD ORD/000559/2023-2024 2246/AD 11/08/2023 30 SAMIR GIRI 19.56 0.00 0 0
4 Alipore Division AUGMENTATION OF SONAKHALI (ZONE-III) PIPED WATER SUPPLY SCHEME, BLOCK-BASANTI,DISTRICT-SOUTH 24 PARGANAS , Inter connection and rising main with supply of specials of Augmentation of Sonakhali (Zone-III) W/S Scheme, Block-Basanti under Canning Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Canning sub division ORD/001081/2023-2024 3540/AD 17/10/2023 15 ARBINA ENTERPRISE 27.69 0.00 0 0
5 Alipore Division AUGMENTATION OF SONAKHALI (ZONE-III) PIPED WATER SUPPLY SCHEME, BLOCK-BASANTI,DISTRICT-SOUTH 24 PARGANAS , Conducting route survey, design distribution network and preparation & submission of DPR for Sonakhali (Zone-III) Augmentation Water Supply Scheme including Functional Household Tap Connection (FHTC) for implementation of JJM at Basanti Block under Canning Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Canning sub division Junior Engineer, 2 CSD ORD/000606/2023-2024 2269/AD 14/08/2023 45 TECH VISION 6.39 6.39 100 99
6 Alipore Division AUGMENTATION OF SONAKHALI (ZONE-III) PIPED WATER SUPPLY SCHEME, BLOCK-BASANTI,DISTRICT-SOUTH 24 PARGANAS , Material Requisition To Resource Division RTOR000037/2023-2024 243/AD 24/04/2023 0 Resource Division 82.44 0.00 0 0
7 Alipore Division AUGMENTATION OF SONAKHALI (ZONE-III) PIPED WATER SUPPLY SCHEME, BLOCK-BASANTI,DISTRICT-SOUTH 24 PARGANAS , Laying Distribution System, Providing Functional Household Tap Connection for Ground Water Based Augmentation Piped Water Supply Scheme for the Sonakhali (Zone-III), Block-Basanti under Canning Sub-Division of Alipore Division, PHE Dte. [No. of FHTC = 1981] Assistant Engineer, Canning sub division Junior Engineer, 2 CSD ORD/000632/2023-2024 2156/AD 09/08/2023 90 M/S SHIBAM ENTERPRISE 450.06 95.91 21.31 65
8 Alipore Division AUGMENTATION OF SONAKHALI (ZONE-III) PIPED WATER SUPPLY SCHEME, BLOCK-BASANTI,DISTRICT-SOUTH 24 PARGANAS , Construction of 1 (one) no. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Sonakhali W/S Scheme (Zone-III), Block - Basanti under Canning Sub-Division of Alipore Division, PHE Dte. [Pump House No. III] Assistant Engineer, Canning sub division Junior Engineer, 2 CSD ORD/000314/2024-2025 2695/AD 24/06/2024 45 GANGA TUBEWELL AND HARDWARE 7.05 0.00 0 0
9 Alipore Division AUGMENTATION OF SONAKHALI (ZONE-III) PIPED WATER SUPPLY SCHEME, BLOCK-BASANTI,DISTRICT-SOUTH 24 PARGANAS , Material Requisition To Resource Division RTOR000394/2023-2024 335/AD 19/01/2024 0 Resource Division 12.20 0.00 0 0
10 Alipore Division AUGMENTATION OF SONAKHALI (ZONE-III) PIPED WATER SUPPLY SCHEME, BLOCK-BASANTI,DISTRICT-SOUTH 24 PARGANAS , Construction of 23 Nos. different capacity R.C.C OHR (based on Departmental Design & Drawing ) with 20 mtr. staging height including Geo-Technical investigation, foundation, pipeline connection and cost of pipes , specials etc. for augmentation of different piped water supply scheme of Canning-I, Canning-II & Basanti Block under Canning Sub-Division of Alipore Division, PHE Dte. Assistant Engineer, Canning sub division Junior Engineer, 3 CSD,Junior Engineer,1 CSD ORD/002461/2023-2024 1512/AD 13/03/2024 600 NATIONAL PROJECTS CONSTRUCTION CORPORATION LTD 2,624.49 0.00 0 30
11 Alipore Division AUGMENTATION OF SONAKHALI (ZONE-III) PIPED WATER SUPPLY SCHEME, BLOCK-BASANTI,DISTRICT-SOUTH 24 PARGANAS , Repairing & renovation of Pump House no. - 1 of Sonakhali (Zone-III) W/S Scheme Block - Basanti under Canning Sub- Division of Alipore Division, PHE Dte. Assistant Engineer, Canning sub division Junior Engineer, 2 CSD ORD/000287/2025-2026 690/CSD 26/05/2025 30 ARANYA ENTERPRISE 2.92 0.00 0 0
Total 3,250.31 102.30 3.15