Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 197.34 0 0  
1 SOUTH 24 PARGANAS Alipore Division AUGMENTATION IN DISTRIBUTION SYSTEM DUE TO IMPROVEMENT OF WATER BY INTER CONNECTION FROM EXISTING TUBEWELLS WITH ALLIED WORKS TO EXTEND THE BENEFIT OF 100% HOUSEHOLD BY PROVIDING FHTC UNDER ZONE-IV OF DIAMOND HARBOUR-II BLOCK WITHIN ' MEGA SURFACE WATER B , SM/13914 Augmentation Material Requisition To Resource Division RTOR000142/2022-2023 15/AD 05/04/2023 0 Resource Division 15.11 0.00 0 0
2 SOUTH 24 PARGANAS Alipore Division AUGMENTATION IN DISTRIBUTION SYSTEM DUE TO IMPROVEMENT OF WATER BY INTER CONNECTION FROM EXISTING TUBEWELLS WITH ALLIED WORKS TO EXTEND THE BENEFIT OF 100% HOUSEHOLD BY PROVIDING FHTC UNDER ZONE-IV OF DIAMOND HARBOUR-II BLOCK WITHIN ' MEGA SURFACE WATER B , SM/13914 Augmentation Material Requisition To Resource Division RTOR000182/2023-2024 1273/AD 05/07/2023 0 Resource Division 15.11 0.00 0 0
3 SOUTH 24 PARGANAS Alipore Division AUGMENTATION IN DISTRIBUTION SYSTEM DUE TO IMPROVEMENT OF WATER BY INTER CONNECTION FROM EXISTING TUBEWELLS WITH ALLIED WORKS TO EXTEND THE BENEFIT OF 100% HOUSEHOLD BY PROVIDING FHTC UNDER ZONE-IV OF DIAMOND HARBOUR-II BLOCK WITHIN ' MEGA SURFACE WATER B , SM/13914 Augmentation Material Requisition To Resource Division RTOR000353/2023-2024 3217/AD 04/10/2023 0 Resource Division 0.21 0.00 0 0
4 SOUTH 24 PARGANAS Alipore Division AUGMENTATION IN DISTRIBUTION SYSTEM DUE TO IMPROVEMENT OF WATER BY INTER CONNECTION FROM EXISTING TUBEWELLS WITH ALLIED WORKS TO EXTEND THE BENEFIT OF 100% HOUSEHOLD BY PROVIDING FHTC UNDER ZONE-IV OF DIAMOND HARBOUR-II BLOCK WITHIN ' MEGA SURFACE WATER B , SM/13914 Augmentation Repairing and Renovation of existing 100 Cum. capacity Over Head Reservoir of Zone-IV, Diamond Harbour -II Block (At Sarisha Ramkrishna Mission) Water Supply Scheme under Diamond Harbour Sub-Division of Alipore Division of PHE Dte. (2nd call) Assistant Engineer, Diamond Harbour sub division Junior Engineer ORD/000131/2023-2024 490/AD 10/05/2023 60 NIVA CONSTRUCTION 20.82 0.00 0 100
5 SOUTH 24 PARGANAS Alipore Division AUGMENTATION IN DISTRIBUTION SYSTEM DUE TO IMPROVEMENT OF WATER BY INTER CONNECTION FROM EXISTING TUBEWELLS WITH ALLIED WORKS TO EXTEND THE BENEFIT OF 100% HOUSEHOLD BY PROVIDING FHTC UNDER ZONE-IV OF DIAMOND HARBOUR-II BLOCK WITHIN ' MEGA SURFACE WATER B , SM/13914 Augmentation Interconnection from secondary grid to OHR and laying in the left-out portion of distribution system of different dia. DI pipes i.e. 200mm, 300mm, 450mm along with 63mm to 280mm UPVC pipes with allied road restoration work under augmentation scheme of Zone-IV of Diamond Harbour-II Block under Diamond Harbour sub- Division of Alipore Division P.H.E Dte. [SM/09508, SM/13912, SM/13914] Assistant Engineer, Diamond Harbour sub division Junior Engineer 3 DHSD ORD/002529/2024-2025 814/AD 27/02/2025 60 K.P. CONSTRUCTION 146.09 0.00 0 52
Total 197.34 0.00 0