Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
17 843.11 229.3 27.2  
1 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SRINAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/13811 Augmentation Providing Functional Household Tap Connection (FHTC) to all the households in Srinagar Water Supply Scheme, Block - Kakdwip South 24 Pgs. District under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. including Operation & Maintenance of scheme for 1 (one) year. Assistant Engineer, Kakdwip Sub Division ORD/000497/2020-2021 5312/AD 18/02/2021 365 MONDAL PRECISION PRIVATE LIMITED 105.31 23.64 22.45 90
2 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SRINAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/13811 Augmentation Conducting route survey, design distribution network and preparation & submission of DPR for each of different new water supply scheme / each Augmentation water supply scheme (SRINAGAR (ZONE - I & II) PWSS) including Functional Household Tap Connection (FHTC) for implementation of JJM at Kakdwip Block under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Kakdwip Sub Division ORD/001061/2022-2023 4650/AD 06/09/2022 45 LEMNISCATE 6.13 6.13 100 100
3 SOUTH 24 PARAGANAS S24 Pgns Mechanical AUGMENTATION OF GROUND WATER BASED SRINAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/13811 Augmentation Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 1&2, for Augmentation of Srinagar water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Kakdwip] Assistant Engineer -I Junior Engineer ORD/000436/2022-2023 3832/SMD 29/12/2022 90 KARTICK BAL 21.78 0.00 0 0
4 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SRINAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/13811 Augmentation Material Requisition To Resource Division RTOR000274/2023-2024 3073/AD 28/09/2023 Resource Division 0.30 0.00 0 0
5 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SRINAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/13811 Augmentation Preparation of design (Pile and Pile Cap) drawing for foundation of different capacity OHR of Srinagar (Zone-I & II) PWSS under JJM at Kakdwip Block under Kakdwip Sub-Division of Alipore Division P.H.E. Dte. (Zone-II) Assistant Engineer, Kakdwip Sub Division Juniour Engineer_3, Kakdwip Sub Division ORD/000909/2023-2024 268(I)/KSD 10/07/2023 4 GEOTECHNICAL ENGINEERS CONSORTIUM 0.49 0.24 48.98 100
6 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SRINAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/13811 Augmentation Material Requisition To Resource Division RTOR000465/2023-2024 4725/AD 18/12/2023 Resource Division 24.69 0.00 0 0
7 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SRINAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/13811 Augmentation Material Requisition To Resource Division RTOR000594/2023-2024 93/AD 03/01/2024 Resource Division 0.83 0.00 0 0
8 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SRINAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/13811 Augmentation Material Requisition To Resource Division RTOR000812/2023-2024 657/AD 30/01/2024 Resource Division 12.80 0.00 0 0
9 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SRINAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/13811 Augmentation Laying distribution system, Functional Household Tap Connection (FHTC) to all households for Augmentation of Srinagar Zone - I & II Water Supply Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. (Zone-I) (Part-A) Assistant Engineer, Kakdwip Sub Division Juniour Engineer_4, Kakdwip Sub Division ORD/000426/2023-2024 1914/AD 01/08/2023 30 HYDROTECH ASSOCIATES 12.04 4.97 41.28 90
10 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SRINAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/13811 Augmentation Making and fixing of permanent display board at headwork site of Hardwood Point, Ganeshpur Kalinagar Zone - I & II, Kashinagar, Srinagar Zone - I & II PWSS under JJM at Kakdwip Block under Kakdwip Sub-Division of Alipore Division P.H.E.D. Assistant Engineer, Kakdwip Sub Division Juniour Engineer_2, Kakdwip Sub Division ORD/002145/2023-2024 945/KSD 19/12/2023 5 BIMALENDU GIRI 0.94 0.00 0 100
11 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SRINAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/13811 Augmentation Sinking of 01 no. 100mm x 50mm dia. having 4 nos. Strainer upto 360 mtr (Average) depth fitted with India Mark-II DWP Hand Pump Tubewell with supplying PVC Pipe for providing FHTC at Augmentation of Srinagar Zone-I & II W/S Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub - Division of Alipore Division, P.H.E.D. (Zone-II) Assistant Engineer, Kakdwip Sub Division Juniour Engineer_4, Kakdwip Sub Division ORD/002568/2023-2024 512/KSD 15/03/2024 10 MAA LAXMI ENTERPRISE 2.80 0.00 0 0
12 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SRINAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/13811 Augmentation Laying distribution system, Functional Household Tap Connection (FHTC) to all households for Augmentation of Srinagar Zone - I & II Water Supply Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. (Zone-I) (Part-B) Assistant Engineer, Kakdwip Sub Division Juniour Engineer_4, Kakdwip Sub Division ORD/000427/2023-2024 1915/AD 01/08/2023 30 M/S.SREEJIT ENTERPRISE 11.80 5.21 44.15 60
13 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SRINAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/13811 Augmentation Laying distribution system, Rising Main, Functional Household Tap Connection (FHTC) to all households including O & M of distribution system, rising main, FHTC for 1 year after completion of FHTC works for Augmentation of Srinagar (Zone - I & II) Water Supply Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. (Zone-I) (Part-C) [No. of FHTC = 70] Assistant Engineer, Kakdwip Sub Division Juniour Engineer_4, Kakdwip Sub Division ORD/002031/2022-2023 12998/AD 23/03/2023 90 PREMANANDA ROY BISWAS 179.16 96.23 53.71 80
14 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SRINAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/13811 Augmentation Construction of boundary wall along with Land Development and Plinth Protection and Approach Road for Pump House at Head Work Site for Augmentation of Srinagar (Zone - I & II) W/S scheme, Block - Kakdwip under JJM of Kakdwip Sub-Division under Alipore Division, P.H.E. Dte. (Zone-II) Assistant Engineer, Kakdwip Sub Division Juniour Engineer_4, Kakdwip Sub Division ORD/000212/2024-2025 2595/AD 19/06/2024 45 KHOKAN MONDAL 28.76 0.00 0 0
15 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SRINAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/13811 Augmentation Construction, placing and fixing of FHTC platform at every individual beneficiary, pump connections, Pile and Pile Cap for OHR etc at Sri Nagar PWSS, Block -Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E.D. (SM/13811) Assistant Engineer, Kakdwip Sub Division Juniour Engineer_4, Kakdwip Sub Division ORD/000378/2024-2025 3044/AD 24/07/2024 60 MAA LAXMI ENTERPRISE 120.33 0.00 0 0
16 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SRINAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/13811 Augmentation Construction of 200 cum. Over Head Reservoir (OHR), (20 mtr. Staging Height) along with Pump House, Laying distribution system, Rising Main, Functional Household Tap Connection (FHTC) to all households including design & drawing of foundation after soil investagation including O & M of Laying distribution, Rising Main & FHTC for 1 year after completion of FHTC works for Augmentation of Srinagar (Zone-I & II) Water Supply Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. (Zone-II) [No. of FHTC = 70] Assistant Engineer, Kakdwip Sub Division Juniour Engineer_4, Kakdwip Sub Division ORD/001865/2022-2023 12418/AD 09/03/2023 300 MAA LAXMI ENTERPRISE 276.43 84.40 30.53 80
17 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SRINAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/13811 Augmentation Sinking of 02 Nos. 250mm x 150mm dia. 360 mtr. deep Tubewell by D.R. Rig method using UPVC Pipe & Pre-packed Resin Bonded Gravel Filter for Augmentation of Srinagar (Zone-I & II) W/S Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. (2nd Call) Assistant Engineer, Kakdwip Sub Division Juniour Engineer_4, Kakdwip Sub Division ORD/001775/2022-2023 12057/AD 27/02/2023 45 M/S MAITY CONSTRUCTION 38.52 8.48 22.01 100
Total 843.10 229.30 27.2