Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
32 1,194.38 384.35 32.18  
1 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SURYANAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/12572 Augmentation Conducting route survey, design distribution network and preparation & submission of DPR for each of different new water supply scheme / each Augmentation water supply scheme ( SURYANAGAR (ZONE - I & II) PWSS) including Functional Household Tap Connection (FHTC) for implementation of JJM at Kakdwip Block under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Kakdwip Sub Division Junior Engineer 4, Raidghi Sub Division ORD/000496/2022-2023 4189/AD 22/08/2022 45 LEMNISCATE 9.60 9.60 100 100
2 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SURYANAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/12572 Augmentation Sinking of 02 Nos. 250mm x 150mm dia. 360 mtr. deep Tubewell by D.R. Rig method using UPVC Pipe & Pre-packed Resin Bonded Gravel Filter for Augmentation of Suryanagar (Zone-I & II) W/S Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Kakdwip Sub Division Junior Engineer 4, Raidghi Sub Division ORD/000470/2022-2023 5089/AD 20/09/2022 45 NIRMAN CONSTRUCTION 36.67 32.97 89.91 100
3 SOUTH 24 PARAGANAS S24 Pgns Mechanical AUGMENTATION OF GROUND WATER BASED SURYANAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/12572 Augmentation Payment of electric bills for new service connection under SMD, PHE Dte. BILL/01562/2022-2023 BP-2022-23-450 20/03/2023 WBSEDCL 1.42 0.00 0 0
4 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SURYANAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/12572 Augmentation Laying distribution system for providing Functional Household Tap Connection (FHTC) to all households for Augmentation of Suryanagar (Zone-I & II) Water Supply Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. (Zone-I) (Part-C) Assistant Engineer, Kakdwip Sub Division Junior Engineer 4, Raidghi Sub Division,Juniour Engineer_1, Kakdwip Sub Division ORD/000570/2022-2023 5710/AD 13/10/2022 60 R.S.CONSTRUCTION CO. 63.91 48.16 75.36 0
5 SOUTH 24 PARAGANAS S24 Pgns Mechanical AUGMENTATION OF GROUND WATER BASED SURYANAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/12572 Augmentation Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 1&2, Zone-I&II for Augmentation of Suryanagar water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Kakdwip] Assistant Engineer -I Junior Engineer ORD/000374/2022-2023 3778/SMD 29/12/2022 90 M/S. S.S. ENTERPRISE 21.52 19.61 91.12 75
6 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SURYANAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/12572 Augmentation Laying distribution system, Functional Household Tap Connection (FHTC) to all households for Augmentation of Suryanagar (Zone-I & II) Water Supply Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. (Zone-I) (Part-B) Assistant Engineer, Kakdwip Sub Division Juniour Engineer_1, Kakdwip Sub Division ORD/000569/2022-2023 5709/AD. 13/10/2022 60 BISWANATH MALLICK 89.60 32.23 35.97 20
7 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SURYANAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/12572 Augmentation Laying distribution system for providing Functional Household Tap Connection (FHTC) to all households for Augmentation of Suryanagar (Zone-I & II) Water Supply Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. (Zone-I) (Part-D) Assistant Engineer, Kakdwip Sub Division Juniour Engineer_1, Kakdwip Sub Division ORD/000571/2022-2023 .5711/AD 13/10/2022 30 TOJO ENTERPRISE 10.65 10.53 98.87 95
8 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SURYANAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/12572 Augmentation Material Requisition To Resource Division RTOR000272/2023-2024 3071/AD 28/09/2023 Resource Division 0.30 0.00 0 0
9 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SURYANAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/12572 Augmentation Preparation of design (Pile and Pile Cap) drawing for foundation of different capacity OHR of Suryanagar (Zone-I & II) PWSS under JJM at Kakdwip Block under Kakdwip Sub-Division of Alipore Division P.H.E. Dte. (Zone-II) Assistant Engineer, Kakdwip Sub Division Juniour Engineer_3, Kakdwip Sub Division ORD/000908/2023-2024 267(I)/KSD 10/07/2023 4 GEOTECHNICAL ENGINEERS CONSORTIUM 0.49 0.24 48.98 100
10 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SURYANAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/12572 Augmentation Material Requisition To Resource Division RTOR000460/2023-2024 4723/AD 18/12/2023 Resource Division 30.66 0.00 0 0
11 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SURYANAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/12572 Augmentation Material Requisition To Resource Division RTOR000591/2023-2024 90/AD 03/01/2024 Resource Division 5.94 0.00 0 0
12 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SURYANAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/12572 Augmentation aying distribution system, Functional Household Tap Connection (FHTC) to all households for Augmentation of Suryanagar (Zone-I & II) Water Supply Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. (Zone-II) (Part-D) Assistant Engineer, Kakdwip Sub Division Junior Engineer 4, Raidghi Sub Division,Juniour Engineer_1, Kakdwip Sub Division ORD/000576/2022-2023 5714/AD 13/10/2022 30 M/S. L.P. CONSTRUCTION 16.87 7.86 46.59 80
13 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SURYANAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/12572 Augmentation Material Requisition To Resource Division RTOR000810/2023-2024 655/AD 30/01/2024 Resource Division 17.57 0.00 0 0
14 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SURYANAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/12572 Augmentation Laying distribution system for providing Functional Household Tap Connection (FHTC) to all households for Augmentation of Suryanagar (Zone-I & II) Water Supply Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. (Zone-I) (Part-E) Assistant Engineer, Kakdwip Sub Division Junior Engineer 4, Raidghi Sub Division,Juniour Engineer_1, Kakdwip Sub Division ORD/000572/2022-2023 5712/AD 13/10/2022 21 THE TOWER CONSTRUCTION 7.90 3.94 49.87 100
15 SOUTH 24 PARAGANAS S24 Pgns Mechanical AUGMENTATION OF GROUND WATER BASED SURYANAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/12572 Augmentation Supply & installation of LED board at Zone-I & II PH-1&2 of Suryanagar Aug. W/S Scheme under South 24-Pgs Mechanical Division PHE Dte.(Block-Kakdwip) ORD/001655/2023-2024 .1031/AE-I/SMD 20/09/2023 15 MAA SUSOMA & COMPANY 0.78 0.39 50 100
16 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SURYANAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/12572 Augmentation Support services for preparation of documentation in relating to submission to other Department i.e. PWD (NH) for approval of laying rising main and distribution main along / across NH 117 from Nischintapur to Bakkhali for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. Assistant Engineer, Kakdwip Sub Division Juniour Engineer_3, Kakdwip Sub Division ORD/001997/2023-2024 470/KSD 22/09/2023 30 ROY CHOWDHURY ASSOCIATES 3.14 0.00 0 100
17 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SURYANAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/12572 Augmentation Material Requisition To Resource Division RTOR000997/2023-2024 1790/AD 27/03/2024 Resource Division 25.73 0.00 0 0
18 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SURYANAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/12572 Augmentation Making and fixing of permanent display board at headwork site of Ramratanpur, Suryanagar Zone - I & II, Ganeshpur Left Out area PWSS under JJM at Kakdwip Block under Kakdwip Sub-Division of Alipore Division P.H.E.D. Assistant Engineer, Kakdwip Sub Division Juniour Engineer_2, Kakdwip Sub Division ORD/002147/2023-2024 946/KSD 19/12/2023 5 ANANTA KUMAR GIRI 0.63 0.00 0 100
19 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SURYANAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/12572 Augmentation Route Survey for fixing up alignment of pipe line throughout NH-117 in different water supply scheme & it's adjacent areas under JJM of Kakdwip Sub - Division under Alipore Division, P.H.E.D. Assistant Engineer, Kakdwip Sub Division Juniour Engineer_3, Kakdwip Sub Division ORD/002572/2023-2024 515/KSD 15/03/2024 7 ROY CHOWDHURY ASSOCIATES 3.85 0.00 0 100
20 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SURYANAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/12572 Augmentation Laying distribution system, Functional Household Tap Connection (FHTC) to all households for Augmentation of Suryanagar (Zone-I & II) Water Supply Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. (Zone-II) (Part-C) Assistant Engineer, Kakdwip Sub Division Junior Engineer 4, Raidghi Sub Division,Juniour Engineer_1, Kakdwip Sub Division ORD/000578/2022-2023 5716/AD 13/10/2022 30 M/S BANERJEE ENGINEERING SYSTEM 16.66 7.56 45.38 100
21 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SURYANAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/12572 Augmentation Allied works for pile and pile cap portion regarding the construction of 600 cum. capacity 20 mtr. staging height R.C.C. Over Head Reservoir as per departmental design, drawing & specification including R.C.C. Bored pile & pile cap upto pedestal at Suryanagar Zone - I & II W/S Scheme, South 24 Parganas, Kakdwip Block under Kakdwip Sub-Division of Alipore Division P.H.E. Dte. (Zone-II) Assistant Engineer, Kakdwip Sub Division Junior Engineer 4, Raidghi Sub Division,Juniour Engineer_1, Kakdwip Sub Division ORD/000590/2023-2024 2347/AD 18/08/2023 45 KAMIRUL SK AND CO. 60.02 28.94 48.22 100
22 SOUTH 24 PARAGANAS S24 Pgns Mechanical AUGMENTATION OF GROUND WATER BASED SURYANAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/12572 Augmentation Improvement of outdoor illumination arrangement with allied works at Zone-I & II PH No-1 of Suryanagar Augmentation W/S Scheme under JJM south 24 Pgs Mechanical Division PHE Dte [Block - Kakdwip] Assistant Engineer -I Junior Engineer ORD/002271/2023-2024 841-AE-I-SMD 31/07/2023 15 M/S. S.S. ENTERPRISE 0.89 0.00 0 0
23 SOUTH 24 PARAGANAS S24 Pgns Mechanical AUGMENTATION OF GROUND WATER BASED SURYANAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/12572 Augmentation Improvement of outdoor illumination arrangement with allied works at Zone-I & II PH No-2 of Suryanagar Augmentation W/S Scheme under JJM south 24 Pgs Mechanical Division PHE Dte [Block - Kakdwip] Assistant Engineer -I Junior Engineer ORD/002392/2023-2024 842-AE-I-SMD 31/07/2023 15 M/S. S.S. ENTERPRISE 0.89 0.00 0 0
24 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SURYANAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/12572 Augmentation Construction, placing and fixing of FHTC platform at every individual beneficiary, pump connection etc. for Augmentation of Suryanagar Zone - II W/S Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E.D. (Part-B) (SM/12572) Assistant Engineer, Kakdwip Sub Division Juniour Engineer_1, Kakdwip Sub Division,Juniour Engineer_4, Raidighi Sub Division ORD/000209/2024-2025 2592/AD 19/06/2024 45 MAA BHABANI CONSTRUCTION (DUM DUM) 42.65 0.00 0 0
25 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SURYANAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/12572 Augmentation Construction of boundary wall along with Land Development, Plinth Protection and Approach Road for Pump House at 2nd Tubewell Site for Augmentation of Suryanagar (Zone - I & II) W/S scheme, Block : Kakdwip under JJM of Kakdwip Sub-Division under Alipore Division, P.H.E. Dte. (Zone-II) (SM/12572) Assistant Engineer, Kakdwip Sub Division Juniour Engineer_1, Kakdwip Sub Division,Juniour Engineer_4, Raidighi Sub Division ORD/000214/2024-2025 2597/AD 19/06/2024 30 JOY ENGINEERING & CONSTRUCTION 9.66 0.00 0 0
26 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SURYANAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/12572 Augmentation Construction, placing and fixing of FHTC platform at every individual beneficiary, pump connection etc. for Augmentation of Suryanagar Zone - II W/S Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E.D. (Part-A) (SM/12572) Assistant Engineer, Kakdwip Sub Division Juniour Engineer_1, Kakdwip Sub Division,Juniour Engineer_4, Raidighi Sub Division ORD/000208/2024-2025 2591/AD 19/06/2024 60 SARADA CONSTRUCTION 52.80 0.00 0 0
27 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SURYANAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/12572 Augmentation Construction of boundary wall along with Land Development and Plinth Protection and Approach Road for Pump House at Head Work Site for Augmentation of Suryanagar (Zone - I & II) W/S scheme, Block : Kakdwip under JJM of Kakdwip Sub-Division under Alipore Division, P.H.E. Dte. (Zone-II) (SM/12572) Assistant Engineer, Kakdwip Sub Division Juniour Engineer_1, Kakdwip Sub Division,Juniour Engineer_4, Raidighi Sub Division ORD/000213/2024-2025 2596/AD 19/06/2024 45 M/S. SUNITY ENTERPRISE 28.44 0.00 0 0
28 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SURYANAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/12572 Augmentation Construction, placing and fixing of FHTC Platform at every individual beneficiary, pump connection etc. for Augmentation of Suryanagar Zone- I W/S Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E.D. (Part- B) (SM/12572) Assistant Engineer, Kakdwip Sub Division Juniour Engineer_1, Kakdwip Sub Division,Juniour Engineer_4, Raidighi Sub Division ORD/000207/2024-2025 2590/AD 19/06/2024 45 ANANTA KUMAR GIRI 25.16 0.00 0 0
29 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SURYANAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/12572 Augmentation Laying distribution system, Functional Household Tap Connection (FHTC) to all households for Augmentation of Suryanagar (Zone-I & II) Water Supply Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. (Zone-II) (Part-B) Assistant Engineer, Kakdwip Sub Division Junior Engineer 4, Raidghi Sub Division,Juniour Engineer_1, Kakdwip Sub Division ORD/000577/2022-2023 5715/AD 13/10/2022 60 SARADA CONSTRUCTION 89.01 52.15 58.59 60
30 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SURYANAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/12572 Augmentation Laying distribution system, Functional Household Tap Connection (FHTC) to all households for Augmentation of Suryanagar (Zone-I & II) Water Supply Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. (Zone-I) (Part-A) [No. of FHTC = 100] Assistant Engineer, Kakdwip Sub Division Junior Engineer 4, Raidghi Sub Division,Juniour Engineer_1, Kakdwip Sub Division ORD/000913/2022-2023 7412/AD 25/11/2022 90 M/S RAJKUMAR KHAN 119.67 55.73 46.57 80
31 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SURYANAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/12572 Augmentation Construction of 1 no. 550 cum. Over Head Reservoir (OHR), (20 mtr. Staging Height) along with Laying distribution system, Rising Main, Functional Household Tap Connection (FHTC) to all households including design & drawing of pile foundation & pile cap after soil investigation including O & M of distribution system, rising main, FHTC for 1 year after completion of FHTC works for Augmentation of Suryanagar (Zone-I & II) Water Supply Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. (Zone-II) (Part-A) Assistant Engineer, Kakdwip Sub Division Juniour Engineer_1, Kakdwip Sub Division,Juniour Engineer_4, Raidighi Sub Division ORD/001319/2022-2023 9884/AD 10/01/2023 300 KAMIRUL SK AND CO. 319.24 74.44 23.32 40
32 SOUTH 24 PARAGANAS Alipore Division AUGMENTATION OF GROUND WATER BASED SURYANAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS , SM/12572 Augmentation Construction, placing and fixing of FHTC Platform at every individual beneficiary, pump connection etc. for Augmentation of Suryanagar Zone- I W/S Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E.D. (Part-A) (SM/12572) Assistant Engineer, Kakdwip Sub Division Juniour Engineer_1, Kakdwip Sub Division,Juniour Engineer_4, Raidighi Sub Division ORD/000496/2024-2025 3580/AD 05/09/2024 60 M/S RAJKUMAR KHAN 82.06 0.00 0 0
Total 1,194.36 384.36 32.18