Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 1,159.57 7.16 0.62  
1 HOWRAH Uluberia-II Electrical Baniban Zone-III Piped water Supply Scheme , SM/18564 New Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Baniban water supply scheme, Zone-III, T.W. No. I, II, III & IV, Block: Uluberia-II, District- Howrah under Electrical Division, PHE Dte. ORD/000927/2023-2024 3598/ED 28/08/2023 90 DEY ENTERPRISE 42.99 0.00 0 0
2 HOWRAH Uluberia-II Howrah Division Baniban Zone-III Piped water Supply Scheme , SM/18564 New Preparation of DPR for new piped water supply scheme of Basudebpur PWSS, Uluberia-II Block under Uluberia Sub-Division of Howrah Division PHE Dte.( Banibon, Zone-III) AE/Ulu JE-USD ORD/000251/2022-2023 325/AE/USD 16/08/2022 45 APEX ENGINEERING 3.76 3.76 100 100
3 HOWRAH Uluberia-II Howrah Division Baniban Zone-III Piped water Supply Scheme , SM/18564 New Wall writing IEC message along with logo picture etc. of multiple colour as will be supplied by the PHE Dte. On smooth durable wall surface preferably of Govt. premises boundary wall under Uluberia - II block of Uluberia Sub Division under Howrah Division, P.H.E. Dte. AE HQ je_blk_ballyjag_how ORD/000653/2023-2024 1212/HD 11/03/2024 15 TRIMARV SOLUTIONS PRIVATE LIMITED 1.85 1.63 88.11 100
4 HOWRAH Uluberia-II Howrah Division Baniban Zone-III Piped water Supply Scheme , SM/18564 New Sinking of 3 (Three) Nos. 250 X 150 mm Dia tubewell Drilling by Direct Rotary method with UPVC Pipes all complete, Construction of 3no 5.40Mx 3.60M Swtich Room with Plinth Height (600mm to 1000mm) with Sanitary and water Supply arrangement, Constrcution of 1.5 mtrs. Height Boundary Wall along with 750 mm Height 3 layer barbed wire around head work site, Constrcution of 1.5 mtrs. Height Boundary Wall along with 750 mm Height 3 layer barbed wire around Other than head work site land development of Head work site and other Tube well sites, Laying distribution system (HDPE & DI) & Providing Household Connection (3191nos), Interconnection between Tube wells & OHR and Construction of 700 cu.m. capacity 20 mtr staging height RCC Over Head Reservoir including Pipe connection & soil investigation Baniban with foundation design Baniban Piped Water Supply Scheme (Zone-III) in Uluberia-II Block of Howrah District under Howrah Division, P. H. E. Dte. AE/Ulu JE-USD ORD/000152/2023-2024 2960/HD 16/08/2023 1026 SAMIRON GHOSH 1,022.24 0.00 0 55
5 HOWRAH Uluberia-II Howrah Division Baniban Zone-III Piped water Supply Scheme , SM/18564 New Continuation order for Hiring of 1 (One) no. Luxury Taxi/Maxi cab/Motor cab on daily basis under monthly hiring category for the Assistant Engineer, Uluberia Sub- Division , PHE Dte of the Government of West Bengal (for Twelve months) under Howrah Division, PHE dte. (Period of 365 Days) AE/Ulu JE-USD,JE/USD ORD/000390/2024-2025 1182/AE/USD 27/11/2024 365 NOBLE ENTERPRISE 4.80 1.77 36.88 30
6 HOWRAH Uluberia-II Howrah Division Baniban Zone-III Piped water Supply Scheme , SM/18564 New Restoration of Bituminous Road along with alterntive laying of DI & HDPE (PE 100, PN6) pipes from 1) Basudebpur Lalpool to Basudebpur G.P. Office via. H/W site to Jhuri Battala(PWD), 2) Basudebpur Battala to Basudebpur Shibtala, 3) Nurullapara Battala to Katra Bazar via. Katra Auto Stand, 4) Katra Auto stand to Basudebpur Lalpool, 5) Basudebpur Bazar to Tehatta Mollickpara via. Tehatta Sishu Niketan to Tehatta Balika Vidyalaya, 6) Uttar Magurkhali to Dakshin Magurkhali, 7) Adharmanik IOCL crossing to Adharmanik Pry. School via. Adharmanik HKKS Pry. School & Pramanick para under Baniban Zone-III PWSS under Uluberia Sub-Division of Howrah Division, PHE Dte. AE/Ulu ORD/000147/2025-2026 3467/HD 12/08/2025 60 INDICON ENGINEERS CO-OP SOCIETY LTD 83.93 0.00 0 0
Total 1,159.58 7.16 0.62