Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
14 1,092.2 402.15 36.82  
1 HOWRAH Howrah Division DEULPUR & GANGADHARPUR ZONE-I PIPED WATER SUPPLY SCHEME. , SM/18560 Augmentation Material Requisition To Resource Division RTOR000065/2022-2023 2839/HD 23/12/2022 0 Resource Division 36.76 0.00 0 0
2 HOWRAH Electrical DEULPUR & GANGADHARPUR ZONE-I PIPED WATER SUPPLY SCHEME. , SM/18560 Augmentation Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Deulpur & Gangadharpur water supply scheme, Zone-I, T.W. No. I & II and Zone-II, T.W. No. I & II Block: Panchla, District- Howrah under Electrical Division, PHE Dte. ORD/000921/2023-2024 3592/ED 28/08/2023 90 R.N.S. TRADING 43.65 0.00 0 0
3 HOWRAH Electrical DEULPUR & GANGADHARPUR ZONE-I PIPED WATER SUPPLY SCHEME. , SM/18560 Augmentation Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Deulpur & Gangadharpur water supply scheme, Zone-I, T.W. No. III and Zone-II, T.W. No. III Block: Panchla, District- Howrah under Electrical Division, PHE Dte. ORD/000875/2023-2024 3448/ED 11/08/2023 90 R.M.D TRADING. 21.99 0.00 0 0
4 HOWRAH Howrah Division DEULPUR & GANGADHARPUR ZONE-I PIPED WATER SUPPLY SCHEME. , SM/18560 Augmentation Material Requisition To Resource Division RTOR000086/2022-2023 446/HD 06/02/2023 0 Resource Division 86.28 0.00 0 0
5 HOWRAH Howrah Division DEULPUR & GANGADHARPUR ZONE-I PIPED WATER SUPPLY SCHEME. , SM/18560 Augmentation Laying Distribution Pipeline work with Providing FHTC (Functional Household Tap Connection-1818 NOS) For Augmentation of Deulpur Gangadharpur Zone-I PWSS at Panchla Block of Howrah Sadar Sub Division under Howrah Division, P. H. E. Dte. From Node Section 7-34 to Node Section 74-77, From Node Section 101-248 to Node Section 356-358, From Node Section 72-84 to Node Section 241-256, From Node Section 256-257 to Node Section 449-450 (P-5,6,7 & 8) AE/SADAR je_how_rws_jagat ORD/000151/2023-2024 2956/HD 16/08/2023 900 M/S ASHIRBAD (INDIA) 179.05 159.15 88.89 85
6 HOWRAH Howrah Division DEULPUR & GANGADHARPUR ZONE-I PIPED WATER SUPPLY SCHEME. , SM/18560 Augmentation Sinking of 3 (Three) Nos. 300 X 200 mm Dia and 230m deep tubewell Drilling by Direct Rotary method with UPVC Pipes all complete at Deulpur Gangadharpur (Zone-I) PWSS of Panchla Block Howrah Sadar Sub-Division under Howrah Division, P.H.E. Dte. AE/SADAR je_how_rws_jagat ORD/000340/2023-2024 4597/HD 20/12/2023 45 WATER TECH 50.26 48.20 95.9 100
7 HOWRAH Electrical DEULPUR & GANGADHARPUR ZONE-I PIPED WATER SUPPLY SCHEME. , SM/18560 Augmentation Quotation App. No.-1007748306 SM/18560 BILL/00467/2024-2025 118 17/05/2024 0 WBSEDCL 6.52 0.00 0 0
8 HOWRAH Howrah Division DEULPUR & GANGADHARPUR ZONE-I PIPED WATER SUPPLY SCHEME. , SM/18560 Augmentation Construction of 700 cum Capacity, 20mtr. Staging Height RCC Elevated Reservoir As Per Departmental Type Design (Ref : Dept. Super Struc. DRG. No. PC-I/OHR/8/2012) including Soil Investigation, Foundation Design & All pipe Connection, Laying Rising Main Pipeline Work, Laying Distribution Pipeline work with Providing FHTC (Functional Household Tap Connection)For Deulpur Gangadharpur Zone-I PWSS at Panchla Block of Howrah District under Howrah Division, P.H.E. Dte.,Part 1 From Node Section R1-1 to Node Section 21-22 to Section 202-204 AE/SADAR je_how_rws_jagat ORD/000144/2023-2024 2838/HD 07/08/2023 600 SUJATA CONSTRUCTION 373.91 99.12 26.51 24
9 HOWRAH Howrah Division DEULPUR & GANGADHARPUR ZONE-I PIPED WATER SUPPLY SCHEME. , SM/18560 Augmentation Laying Distribution Pipeline work with Providing FHTC (Functional Household Tap Connection) For Augmentation of Deulpur Gangadharpur Zone-I PWSS at Panchla Block of Howrah Sadar Sub Division under Howrah Division, P. H. E. Dte. From Node Section 174-242 to Node Section 411-414, Part 4 AE/SADAR je_how_rws_jagat ORD/000215/2023-2024 3279/HD 13/09/2023 120 MAA TARA CONSTRUCTION 98.18 78.13 79.58 70
10 HOWRAH Howrah Division DEULPUR & GANGADHARPUR ZONE-I PIPED WATER SUPPLY SCHEME. , SM/18560 Augmentation Laying of additional distribution pipe line and allied works in Kusadanga mouza at Deulpur Gangadharpur Zone-I PWSS at Panchla Block under Howrah Sadar Sub-Division of Howrah Division, PHE Dte. AE/SADAR je_how_rws_jagat ORD/000161/2024-2025 4187/HD 26/09/2024 240 MAA TARA CONSTRUCTION 53.88 8.13 15.09 80
11 HOWRAH Howrah Division DEULPUR & GANGADHARPUR ZONE-I PIPED WATER SUPPLY SCHEME. , SM/18560 Augmentation Field level data validation of FHTC for error free database in different Pipe Water Supply Scheme under Panchla and Uluberia-II Block in the District of Howrah under the jurisdiction of Howrah Division, PHE Dte. AE HQ je_blk_ballyjag_how ORD/000287/2024-2025 4816/HD 19/11/2024 120 TECH VISION 12.48 9.42 75.48 62
12 HOWRAH Howrah Division DEULPUR & GANGADHARPUR ZONE-I PIPED WATER SUPPLY SCHEME. , SM/18560 Augmentation Special repairing work for restoration of damage pavement caused by laying of pipe line from start Node point 36 to End Node point 256 of existing LDS at Deulpur Board Girls primary School to Deulpur Bandher Bazar for the 2.0 km (PMGSY/PWD) road at Deulpur Gangadharpur Zone-I PWSS Under Panchla Block under Howrah Sadar Sub Division of Howrah Howrah Division, P.H.E. Dte. AE/SADAR je_how_rws_jagat ORD/000710/2024-2025 1313/HD 10/03/2025 120 ASSOCIATE CONSTRUCTION 28.90 0.00 0 0
13 HOWRAH Howrah Division DEULPUR & GANGADHARPUR ZONE-I PIPED WATER SUPPLY SCHEME. , SM/18560 Augmentation Laying of additional distribution pipe line & allied works at Deulpur Gangadharpur Zone-I PWSS at Panchla Block under Howrah Sadar Sub-Division of Howrah Division PHE Dte. AE/SADAR je_how_rws_jagat ORD/000399/2024-2025 859/HD 07/02/2025 300 M/S ASHIRBAD (INDIA) 87.30 0.00 0 40
14 HOWRAH Howrah Division DEULPUR & GANGADHARPUR ZONE-I PIPED WATER SUPPLY SCHEME. , SM/18560 Augmentation Construction of approach road and land Development at 3rd tubewell site, Construction of 1(One) no. boundary wall, Construction of 3rd Pump House (5.40m x 3.60m) at Deulpur Gangadharpur Zone-I PWSS under Howrah Sadar Sub-Division of Howrah Division, P.H.E. Dte. AE/SADAR je_how_rws_jagat ORD/000477/2024-2025 1015/HD 21/02/2025 45 GRAVITA ENTERPRISE 13.04 0.00 0 100
Total 1,092.23 402.15 36.82