Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 439.79 155.32 35.32  
1 HOWRAH Udaynarayanpur Howrah Division Bedhi Chandrapur Piped Water Supply Scheme , SM/18490 New Preparation of DPR for new piped water supply scheme of Bedhichandrapur PWSS, Udaynarayanpur Block under Uluberia Sub-Division of Howrah Division PHE Dte. AE/Ulu ORD/000254/2022-2023 328/AE/USD 16/08/2022 45 APEX ENGINEERING 2.81 2.80 99.64 100
2 HOWRAH Udaynarayanpur Howrah Division Bedhi Chandrapur Piped Water Supply Scheme , SM/18490 New Material Requisition To Resource Division RTOR000049/2023-2024 3217/HD 05/09/2023 0 Resource Division 16.59 0.00 0 0
3 HOWRAH Udaynarayanpur Electrical Bedhi Chandrapur Piped Water Supply Scheme , SM/18490 New Quotation bill for new service connection charge for Bedhi Chandrapur PWSS TW - I BILL/04434/2023-2024 498 07/12/2023 0 WBSEDCL 3.40 0.00 0 0
4 HOWRAH Udaynarayanpur Howrah Division Bedhi Chandrapur Piped Water Supply Scheme , SM/18490 New Sinking of 2nos 250 X 150mm dia Tube Well 230 mtr,Construction of 2nos Pump House cum switch room with sanitary arrangement, Laying Distribution system (LDS) with necessary inter-connections with OHR and bypass arrangement etc. all complete, Functional Household Tap Connection (FHTC) works, Construction of 300 cum capacity 20 Mtr. staging height RCC Over Head Reservoir (Drawing No- PC-I/O.H.R/7/2012)with necessary soil investigation with foundation design as per soil test report for BEDHI CHANDRAPUR PWSS at Udaynarayanpur Block under Uluberia Sub-Division under, Howrah Division, P. H. E. Dte. AE/RWS JE/RWS/Amta II,JE/RWS/Udaynaryanpur,JE Sadar ORD/000137/2023-2024 2758/HD 31/07/2023 365 JAHANGIR ALAM 335.32 152.52 45.48 42
5 HOWRAH Udaynarayanpur Electrical Bedhi Chandrapur Piped Water Supply Scheme , SM/18490 New Quotation bill for new service connection charge for Bedhi Chandrapur PWSS TW - II BILL/04435/2023-2024 497 07/12/2023 0 WBSEDCL 10.33 0.00 0 0
6 HOWRAH Udaynarayanpur Howrah Division Bedhi Chandrapur Piped Water Supply Scheme , SM/18490 New Field level data validation of FHTC for error free database in different Pipe Water Supply Scheme under Udaynarayanpur Block in the District of Howrah under the jurisdiction of Howrah Division, PHE Dte. AE HQ je_blk_ballyjag_how ORD/000282/2024-2025 4813/HD 19/11/2024 120 HORIZEN 13.59 0.00 0 60
7 HOWRAH Udaynarayanpur Howrah Division Bedhi Chandrapur Piped Water Supply Scheme , SM/18490 New Construction of Boundary Wall, Construction of Approach Road and Land Development at HEAD WORK Site and 2nd Tube Well Site along with restoration work of damaged pipeline of BEDHICHANDRAPUR Piped Water Supply Scheme at Udaynarayanpur Block Under Howrah Division, P.H.E. Dte. AE/RWS ORD/000018/2025-2026 1939/HD 22/04/2025 45 JAHANGIR ALAM 47.81 0.00 0 0
8 HOWRAH Udaynarayanpur Howrah Division Bedhi Chandrapur Piped Water Supply Scheme , SM/18490 New Rising Main & Inter Connection with both tube wells of BEDHICHANDRAPUR PWSS in Udaynarayanpur Block under Howrah Division, PHE Dte. AE/RWS JE/RWS/Amta II ORD/000129/2025-2026 3224/HD 22/07/2025 15 MJ ENTERPRISE 9.94 0.00 0 100
Total 439.80 155.31 35.31