Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
13 1,098.92 534.6 48.65  
1 HOWRAH Domjur Howrah Division Bhandardah PWSS with provision of FHTC connection , SM/14197 New Material Requisition To Resource Division RTOR000056/2022-2023 2839/HD 23/12/2022 0 Resource Division 21.73 0.00 0 0
2 HOWRAH Domjur Howrah Division Bhandardah PWSS with provision of FHTC connection , SM/14197 New Material Requisition To Resource Division RTOR000088/2022-2023 593/HD 13/02/2023 0 Resource Division 88.98 0.00 0 0
3 HOWRAH Domjur Electrical Bhandardah PWSS with provision of FHTC connection , SM/14197 New new service connection BILL/02065/2023-2024 127 20/07/2023 0 WBSEDCL 2.85 0.00 0 0
4 HOWRAH Domjur Electrical Bhandardah PWSS with provision of FHTC connection , SM/14197 New Quotation money deposition for new service connection at P.H No.-III of Bhandardah Pwss , Dist- howrah under ED PHED. App. No.-1007763810 SM/14197 BILL/00468/2024-2025 120 17/05/2024 0 WBSEDCL 6.68 0.00 0 0
5 HOWRAH Domjur Howrah Division Bhandardah PWSS with provision of FHTC connection , SM/14197 New Restoration Work of Bituminous Road and Shoulder with allied work of Makardah Bazar to Begri Road from 0.00 Kmp to 1.90 Kmp (Due to Cutting for PHE water line) under Howrah Division in th e dist of Howrah during the year 2024-25. BILL/00829/2024-2025 BP-2024-25-496 27/11/2024 0 EXECUTIVE ENGINEER HOWRAH DIVISION, PWD. 9.52 0.00 0 0
6 HOWRAH Domjur Howrah Division Bhandardah PWSS with provision of FHTC connection , SM/14197 New Work Order for Laying distribution pipe line, Providing FHTC , Repairing of RCC Over Head Reservoir of capacity 350cum with allied work including supply of all labour & materials for Augmentation Of BHANDARDAH Water Supply Scheme at Domjur Block under Howrah Sadar Sub-Division under Howrah Division, P. H. E. Dte. AE/SADAR je6/maad,JE Sadar ORD/000798/2022-2023 998/HD 13/03/2023 1110 P B ENTERPRISE 754.40 487.37 64.6 80
7 HOWRAH Domjur Howrah Division Bhandardah PWSS with provision of FHTC connection , SM/14197 New Work Order for Sinking of 3 (Three) Nos. 250 X 150 mm Dia and 230 m deep tubewell Drilling by Direct Rotary method with UPVC Pipes all complete at Bhandardaha PWSS of Domjur Block of Howrah Sadar Sub-Division under Howrah Division, P. H. E. Dte. AE/SADAR je6/maad,JE Sadar ORD/000741/2022-2023 603/HD 16/02/2023 45 M DHARA AND BROTHERS 38.37 25.02 65.21 100
8 HOWRAH Domjur Howrah Division Bhandardah PWSS with provision of FHTC connection , SM/14197 New Permanent restoration of damaged pavement caused by laying of Public Health Engineering Directorate's pipe line for the PMGSY road "Ankurhati-Purba Noapara Mukherjeepara" of Domjur Block, Howrah under W.B.S.R.D.A. Howrah Division-I. (Package No WB/09/52). BILL/00091/2025-2026 28/04/2025 0 WBSRDA 22.46 0.00 0 0
9 HOWRAH Domjur Howrah Division Bhandardah PWSS with provision of FHTC connection , SM/14197 New Domjur - Andul Road from 0.00 Km to 4.129 Km, Restoration work of PHE Cutting for laying pipe line under Howrah Highway Division in the district of Howrah (Dakshin Jhapardaha PWSS Zone-II, Dakshin Jhapardaha PWSS Zone-I, Bhandardaha PWSS, Bipranoapara PWSS). BILL/01249/2024-2025 28/03/2025 0 EXECUTIVE ENGINEER HIGHWAY DIVISION P W ROADS HOWRAH 101.31 0.00 0 0
10 HOWRAH Domjur Howrah Division Bhandardah PWSS with provision of FHTC connection , SM/14197 New Restoration work of Bituminous Road and Shoulder with allied work of Makardah Bazar to Begri Road from 0.00 Kmp to 0.53 Kmp (Due to cutting for PHE water line - 2nd Phase) under Howrah Division in the District of Howrah during the year 2025-26. BILL/00244/2025-2026 12/06/2025 0 EXECUTIVE ENGINEER HOWRAH DIVISION, PWD. 8.01 0.00 0 0
11 HOWRAH Domjur Howrah Division Bhandardah PWSS with provision of FHTC connection , SM/14197 New Supplying,fitting,fixing and erecting of Display Board at Domjur Zone -VIII PWSS [SM/14155], Rudrapur PWSS [SM/14515], Bhandardaha PWSS [SM/14197] of Domjur Block under Howrah Sadar Sub-Division ,under Howrah Division, P.H.E Dte. AE/SADAR JE Sadar ORD/000992/2024-2025 224/HSSD 27/02/2025 15 ABONTICA ENTERPRISE 0.86 0.00 0 100
12 HOWRAH Domjur Electrical Bhandardah PWSS with provision of FHTC connection , SM/14197 New Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Bhandardah water supply scheme, T.W. No.- I, II & III, Block: Domjur, District- Howrah under Electrical Division, PHE Dte. Assistant Engineer Howrah mechanical Sub Division Junior Engineer5 ORD/000259/2022-2023 926/ED 22/02/2023 900 S.P. CONSTRUCTION 34.30 22.21 64.75 30
13 HOWRAH Domjur Howrah Division Bhandardah PWSS with provision of FHTC connection , SM/14197 New Restoration Work of Bituminous Road and Shoulder with allied work of Makardah Bazar to Begri Road from 0.00 Kmp to 1.90 Kmp (Due to Cutting for PHE water line) under Howrah Division in the dist of Howrah during the year 2024-25. BILL/01156/2025-2026 06/01/2026 0 EXECUTIVE ENGINEER HOWRAH DIVISION, PWD. 9.45 0.00 0 0
Total 1,098.91 534.60 48.65