Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 216.78 54.24 25.02  
1 BANKURA Bankura Mechanical Augmentation works for chiltore and its Adjoining mouza water supply scheme under jal jeevan mission programme , SM/17725 Augmentation Augmentation works for chiltore and its Adjoining mouza water supply scheme under jal jeevan mission programme BILL/00207/2023-2024 28/06/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 1.00 0.00 0 0
2 BANKURA Bankura Mechanical Augmentation works for chiltore and its Adjoining mouza water supply scheme under jal jeevan mission programme , SM/17725 Augmentation Acceptance cum Formal work order for the work of Providing and installation of High lift and Low lift pumping machineries and other electromechanical accessories for Augmentation works for Chiltore and its Adjoining mouzas water supply scheme under Jal Jeevan Mission programe under Bankura Mechanical Division PHE Dte, Dist Bankura. Driller-in-Charge Junior Engineer ORD/000717/2023-2024 2174/BMD 30/10/2023 120 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 62.99 54.24 86.11 80
3 BANKURA Bankura Division Augmentation works for chiltore and its Adjoining mouza water supply scheme under jal jeevan mission programme , SM/17725 Augmentation Material Requisition To Resource Division RTOR000179/2023-2024 116/BQA 10/01/2024 0 Resource Division 1.85 0.00 0 0
4 BANKURA Bankura Mechanical Augmentation works for chiltore and its Adjoining mouza water supply scheme under jal jeevan mission programme , SM/17725 Augmentation Acceptance cum Formal work order for the work of Supply and installation of submersible pumping machinery and Voltage Stabilizer with allied items for Augmentation for Chiltore water supply scheme under Sarenga water supply scheme under Jal Jeevan Mission progremme under Bankura Mechanical Division PHE Dte, Dist :Bankura. Driller-in-Charge Junior Engineer ORD/000173/2024-2025 515/BMD 09/07/2024 530 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 15.77 0.00 0 60
5 BANKURA Bankura Division Augmentation works for chiltore and its Adjoining mouza water supply scheme under jal jeevan mission programme , SM/17725 Augmentation Repairing and painting of Over Head Reservoir (Capacity 200 Cum., staging height 20 Mtr.), CWR, Pump House cum Chlorine Room and Construction of Boundary Wall and Guard Room with all allied works of Augmentation of Chiltore water Supply Scheme under Jal Jeevan Mission Programme under Khatra Sub-Division of Bankura Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001979/2024-2025 672/BQA 12/03/2025 275 SUBHADIP KOLE 49.61 0.00 0 0
6 BANKURA Bankura Division Augmentation works for chiltore and its Adjoining mouza water supply scheme under jal jeevan mission programme , SM/17725 Augmentation Sinking of 2 (Two) Nos. 200 mm dia. X 4.50 Mtr. depth horizontal river bed tube well, using MS "T" and Laying, Fitting & fixing 100 mm MS collecting line from river bed tube well to CWR with allied works for Augmentation works for Chiltore and Its Adjoining mouzas Water Supply Scheme under Jal Jeevan Mission under Khatra Sub-Division of Bankura Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000193/2025-2026 1328/BQA 17/06/2025 137 UTTAM KUMAR SINHAMAHAPATRA 21.78 0.00 0 0
7 BANKURA Bankura Mechanical Augmentation works for chiltore and its Adjoining mouza water supply scheme under jal jeevan mission programme , SM/17725 Augmentation Acceptance cum Formal work order for the work of Providing and installation of submersible pumping machineries and allied works for Augmentation of Chiltore water supply scheme under Bankura Mechanical Division PHE Dte, Dist :Bankura. Driller-in-Charge Junior Engineer ORD/000019/2025-2026 154/BMD 30/04/2025 90 DEBJYOTI BASU 10.26 0.00 0 0
8 BANKURA Bankura Division Augmentation works for chiltore and its Adjoining mouza water supply scheme under jal jeevan mission programme , SM/17725 Augmentation Laying additional HDPE pipeline, supply of sluice valve and construction of valve chamber with all allied works under Augmentation works for Chiltore and Its Adjoining mouzas Water Supply Scheme under Jal Jeevan Mission Programme under Khatra Sub-Division of Bankura Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000172/2025-2026 1308/BQA 17/06/2025 123 SUBHAJIT BANERJEE 20.49 0.00 0 0
9 BANKURA Bankura Mechanical Augmentation works for chiltore and its Adjoining mouza water supply scheme under jal jeevan mission programme , SM/17725 Augmentation Acceptance cum Formal work order for the work of Construction of one no RBTW with providing and installation of Neutralization System , installation of 1 no Submersible Pump Motor set other work at Chiltore water supply scheme under Sarenga Block under BMD PHE Dte Assistant Engineer Junior Engineer ORD/000193/2025-2026 638/BMD 11/07/2025 90 GOENKA ENTERPRISE 33.03 0.00 0 0
Total 216.78 54.24 25.02