Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
12 486.89 207.34 42.58  
1 BANKURA Bankura Division Augmentation works for CHERABASTA (Zone- K) under Bankura - I, II & Barjora Block Water Supply Scheme (BRGF Ph - I Project). , SM/17697 Augmentation Creation of Balance FHTC (Functional House Hold Tap Connection) in connection with Jal Jeevan Mission (JJM) of CHERABASTA (Zone - K)) under Bankura - I, II & Barjora Block W/S Scheme (BRGF Ph - I Project) under Bankura Sadar Sub - Division of Bankura Division, PHE Dte. Block - Bankura - II, Name of OHR -Cherabasta No.of Mouza :- 01 nos. Teleghara . Total House Hold -13 nos. Assistant Engineer Junior Engineer ORD/000562/2022-2023 61/BSD 24/01/2023 7 COSMIC CONSTRUCTION 0.97 0.97 100 100
2 BANKURA Bankura Division Augmentation works for CHERABASTA (Zone- K) under Bankura - I, II & Barjora Block Water Supply Scheme (BRGF Ph - I Project). , SM/17697 Augmentation Material Requisition To Resource Division RTOR000130/2023-2024 2732/BQA 03/10/2023 0 Resource Division 1.92 0.00 0 0
3 BANKURA Bankura Mechanical Augmentation works for CHERABASTA (Zone- K) under Bankura - I, II & Barjora Block Water Supply Scheme (BRGF Ph - I Project). , SM/17697 Augmentation Augmentation works for CHERABASTA (Zone- K) under Bankura - I, II & Barjora Block Water Supply Scheme (BRGF Ph - I Project). BILL/00136/2023-2024 28/06/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 1.50 0.00 0 0
4 BANKURA Bankura Mechanical Augmentation works for CHERABASTA (Zone- K) under Bankura - I, II & Barjora Block Water Supply Scheme (BRGF Ph - I Project). , SM/17697 Augmentation Acceptance cum Formal work order for the work of Providing and installation of High lift & Low Lift pumping machineries and other electromechanical accessories for Augmentation work for Cherabasta (Zone-K) under Bankura -I ,II & Borjora Block Water Supply Scheme (BRGF Phase-I) under Bankura Mechanical Division, P.H.E. Dte Assistant Engineer Junior Engineer ORD/000312/2023-2024 1411/BMD 18/07/2023 60 DEBJYOTI BASU 81.81 65.59 80.17 80
5 BANKURA Bankura Mechanical Augmentation works for CHERABASTA (Zone- K) under Bankura - I, II & Barjora Block Water Supply Scheme (BRGF Ph - I Project). , SM/17697 Augmentation Acceptance cum Formal work order for the work of Providing and installation of Boosting pumping machineries and other electro-mechanical accessories for P/H No- I at Tail End site of Augmentation works for CHERABASTA (Zone- K) under Bankura - I, II and Barjora Block Water Supply Scheme (BRGF Ph - I Project). under Bankura Mechanical Division, P.H.E. Dte Assistant Engineer Junior Engineer ORD/000315/2024-2025 856/BMD 29/08/2024 120 CHAKRABORTY MINING & ENGINEERING. 9.23 3.87 41.93 60
6 BANKURA Bankura Division Augmentation works for CHERABASTA (Zone- K) under Bankura - I, II & Barjora Block Water Supply Scheme (BRGF Ph - I Project). , SM/17697 Augmentation Design Making & Erection of Disply board using Logo and tag line of Jal Jeevan Mission to the place at Gopinathpur (271), Teleghara (286 ), Bagneja (287), Ailtha (281) & Cherabasta (256), of Swajal Gram/Har Ghar Jal Villages for awareness generation among the pepole of Bankura Sadar Sub-Division under Bankura Division, PHE Dte. Assistant Engineer Junior Engineer ORD/001060/2023-2024 1176/BSD 22/11/2023 15 TAPAS DEY 0.69 0.68 98.55 100
7 BANKURA Bankura Division Augmentation works for CHERABASTA (Zone- K) under Bankura - I, II & Barjora Block Water Supply Scheme (BRGF Ph - I Project). , SM/17697 Augmentation Material Requisition To Resource Division RTOR000257/2023-2024 193/BQA 22/01/2024 0 Resource Division 1.92 0.00 0 0
8 BANKURA Bankura Division Augmentation works for CHERABASTA (Zone- K) under Bankura - I, II & Barjora Block Water Supply Scheme (BRGF Ph - I Project). , SM/17697 Augmentation Wayleave/Track crossing proposal with application ID:SER-ADRA-WL-12 For Cherabasta (zone-k) SM Code-SM/SM/17697 BILL/00060/2024-2025 FHTC/04 26/04/2024 0 SOUTH EASTERN RAILWAY 0.11 0.00 0 0
9 BANKURA Bankura Division Augmentation works for CHERABASTA (Zone- K) under Bankura - I, II & Barjora Block Water Supply Scheme (BRGF Ph - I Project). , SM/17697 Augmentation Payment of Wayleave facility charges of CHERABASTA (ZONE-K) W/S Scheme. Scheme Code-SM/17697. Application ID-SER-ADRA-2024-WL-12 BILL/00275/2024-2025 BP-113/2024-25 19/06/2024 0 SOUTH EASTERN RAILWAY 6.40 0.00 0 0
10 BANKURA Bankura Division Augmentation works for CHERABASTA (Zone- K) under Bankura - I, II & Barjora Block Water Supply Scheme (BRGF Ph - I Project). , SM/17697 Augmentation Augmentation works for CHERABASTA (ZONE - K) under Bankura - I, II & Barjora Block Water Supply Scheme (BRGF Phase - I Project). Assistant Engineer Junior Engineer ORD/000331/2023-2024 2001/BQA 19/07/2023 983 S.N POLYMERS PVT LTD 297.16 136.23 45.84 55
11 BANKURA Bankura Division Augmentation works for CHERABASTA (Zone- K) under Bankura - I, II & Barjora Block Water Supply Scheme (BRGF Ph - I Project). , SM/17697 Augmentation Construction of High lift Pump House, Pump House cum chlorine room & Toilet, Boundary wall of Augmentation of CHERABASTA (Zone - K) under Bankura - I, II & Barjora Block W/S Scheme (BRGF Ph - I Project) under Bankura Sadar Sub - Division of Bankura Division, PHE Dte. Assistant Engineer Junior Engineer ORD/001668/2024-2025 360/BQA 07/02/2025 328 SAIKAT CHOWDHURY 37.52 0.00 0 0
12 BANKURA Bankura Division Augmentation works for CHERABASTA (Zone- K) under Bankura - I, II & Barjora Block Water Supply Scheme (BRGF Ph - I Project). , SM/17697 Augmentation Crossing Rail Track ( South Eastern RLY. K.M. 234/10 -11) in between Bikna Rly. Station and Bankura Rly. station in Mobarakpur mouza, P.S. Bankura,by HDD method with 300 mm (OD) MS Casing Pipe with 150 mm dia. MS carrier pipe for Rising main pipe line under Augmentation of CHERABASTA (Zone - K) under Bankura - I, II & Barjora Block W/S Scheme (BRGF Ph - I Project) under Bankura Sadar Sub - Division of Bankura Division, PHE Dte. Assistant Engineer ORD/000192/2025-2026 1327/BQA 17/06/2025 45 GOPAL CHANDRA CHOWDHURY 47.66 0.00 0 0
Total 486.89 207.34 42.58