Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 367.02 87.9 23.95  
1 BANKURA Onda Bankura Division Proposed Ground water based Kantabari pipe water supply scheme under Bankura Division, Block - Onda, Dist - Bankura. , SM/17578 New Material Requisition To Resource Division RTOR000041/2023-2024 1120/BQA 12/05/2023 0 Resource Division 1.42 0.00 0 0
2 BANKURA Onda Bankura Division Proposed Ground water based Kantabari pipe water supply scheme under Bankura Division, Block - Onda, Dist - Bankura. , SM/17578 New Material Requisition To Resource Division RTOR000125/2023-2024 2732/BQA 03/10/2023 0 Resource Division 2.09 0.00 0 0
3 BANKURA Onda Bankura Mechanical Proposed Ground water based Kantabari pipe water supply scheme under Bankura Division, Block - Onda, Dist - Bankura. , SM/17578 New Proposed Ground water based Kantabari pipe water supply scheme under Bankura Division, Block - Onda, Dist - Bankura. BILL/00134/2023-2024 28/06/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 2.50 0.00 0 0
4 BANKURA Onda Bankura Division Proposed Ground water based Kantabari pipe water supply scheme under Bankura Division, Block - Onda, Dist - Bankura. , SM/17578 New Soil Investigation work for the proposed construction of RCC Over Head Reservoir under Bankura Sadar Sub- Division & Khatra Sub- Division of Bankura Division, P.H.E. Dte. (2nd Call) Assistant Engineer Junior Engineer ORD/000861/2023-2024 2953/BQA 31/10/2023 60 K S GROUP 5.18 0.00 0 70
5 BANKURA Onda Bankura Division Proposed Ground water based Kantabari pipe water supply scheme under Bankura Division, Block - Onda, Dist - Bankura. , SM/17578 New Soil Investigation work for construction of OHR (200 CUM CAPACITY) under Proposed Ground water based Kantabari pipe water supply scheme under Bankura Division, Block - Onda, Dist - Bankura under Bankura Sadar Sub Division of Bankura Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000897/2023-2024 3048/BQA 06/11/2023 30 K S GROUP 0.58 0.58 100 100
6 BANKURA Onda Bankura Division Proposed Ground water based Kantabari pipe water supply scheme under Bankura Division, Block - Onda, Dist - Bankura. , SM/17578 New Preparation of piped network system & design the same including Route Survey using DGPS & all related failed work for technical data and JJM compliant data collection preparation and supply of Geo reference drawing (CAD-GIS) layout of plan of the zone wise command area of water distribution and transmission network (WD & TN) Showing all requisite design physical features including cost and estimate of different real component of PWSS like OHR, TW,PUMP HOUSE, B/W electronica component etc. including preparation and submission of DPR booklet of PWSS for Kantabari (JL No- 265) mouza under Onda Block all complete in consultation with PHED Planning Wings and clearance from SLSSC under Bankura Sadar Sub-Division of Bankura Division, PHE Dte. ORD/001089/2021-2022 283\BSD 21/03/2022 15 INDRANIL DUTTA & ASSOCIATES 3.63 3.63 100 95
7 BANKURA Onda Bankura Division Proposed Ground water based Kantabari pipe water supply scheme under Bankura Division, Block - Onda, Dist - Bankura. , SM/17578 New Material Requisition To Resource Division RTOR000260/2023-2024 193/BQA 22/01/2024 0 Resource Division 2.09 0.00 0 0
8 BANKURA Onda Bankura Division Proposed Ground water based Kantabari pipe water supply scheme under Bankura Division, Block - Onda, Dist - Bankura. , SM/17578 New SUPPLY, DELIVERY, CONSTRUCTION, COMMISSIONING AND COMPLETION OF ALL CIVIL WORKS INCLUDING ALL ALLIED, RELATED AND ENABLING WORKS FOR KANTABARI PIPED WATER SUPPLY SCHEME UNDER BANKURA SADAR SUB- DIVISION OF BANKURA DIVISION P.H.E. DTE. BLOCK- ONDA, DIST- BANKURA UNDER JJM INCLUDING TRIAL RUN FOR 3 MONTHS AND O&M FOR A PERIOD OF 3 YEARS UNDER BANKURA DIVISION,PHE Dte. Assistant Engineer Junior Engineer ORD/000495/2023-2024 2345/BQA 14/08/2023 871 GOUTAM BHATTACHRYYA 260.01 83.69 32.19 49
9 BANKURA Onda Bankura Division Proposed Ground water based Kantabari pipe water supply scheme under Bankura Division, Block - Onda, Dist - Bankura. , SM/17578 New Construction of Guard Room and Boundary Wall at Kantabari OHR Site under Proposed Ground Water based Kantabari Pipe Water Supply Scheme under Bankura Division, Block:- Onda. Assistant Engineer Junior Engineer ORD/001403/2024-2025 46/BQA 02/01/2025 212 RAHIBUDDIN MANDAL 22.09 0.00 0 5
10 BANKURA Onda Bankura Mechanical Proposed Ground water based Kantabari pipe water supply scheme under Bankura Division, Block - Onda, Dist - Bankura. , SM/17578 New Acceptance cum Formal work order for the work of Providing and installation of High lift and Low Lift pumping machineries and other electro mechanical accessories at CWR site at mouza Punisole for Augmentation of Aguriband Punisole (Zone E) and Adj. mouzas piped water supply scheme in the Block Onda under Bankura Mechanical Division PHE Dte Block Bankura-I Dist Bankura Assistant Engineer Estimator ORD/001009/2024-2025 2042/BMD 07/03/2025 120 M.S. ENTERPRISE 67.43 0.00 0 0
Total 367.02 87.90 23.95