Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
3 490.29 0 0  
1 BANKURA Bankura Division Construction and commissioning of FHTC (Functional House Hold Tap Connection) in mouzas of Rejuvenation of Sarberia water supply scheme (including left out BRGF Mouzas) Block - Chhatna, Dist - Bankura under Jal Swapna & Jal Jeevan Mission Programme. , SM/11823 Retrofitting Construction and Commissioning of 'FHTC (Funtional House Hold Tap Connection) in mouzas of Rejuvenation of SARBERIA W/S Scheme ( Zone-I) (including Left out BRGF Mouzas] Block - Chhatna, Dist.- Bankura under JAL SWAPNA & Jal Jeevan Mission programe under Bankura Sadar Sub - Division of Bankura Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000370/2023-2024 2032/BQA 24/07/2023 981 M/S TARUN KUMAR PATRA 356.78 0.00 0 46
2 BANKURA Bankura Division Construction and commissioning of FHTC (Functional House Hold Tap Connection) in mouzas of Rejuvenation of Sarberia water supply scheme (including left out BRGF Mouzas) Block - Chhatna, Dist - Bankura under Jal Swapna & Jal Jeevan Mission Programme. , SM/11823 Retrofitting Crossing Rail Track ( South Eastern RLY. K.:BG- 245/17-19) in between Jhantipahari Rly. Station (JPH) & Chhatna Rly. station (CJN) , P.S.Chhatna ,by Jack Pushing method with 400 mm (OD) Spirally welded MS Casing Pipe with 200 mm dia. MS carrier pipe under Augmentation of Sarberia & its adjoining mouzas Water Supply Scheme under Bankura Sadar Sub - Division of Bankura Division, PHE Dte. Assistant Engineer Junior Engineer ORD/001967/2024-2025 687/BQA 12/03/2025 60 M/S TARUN KUMAR PATRA 73.54 0.00 0 1
3 BANKURA Bankura Division Construction and commissioning of FHTC (Functional House Hold Tap Connection) in mouzas of Rejuvenation of Sarberia water supply scheme (including left out BRGF Mouzas) Block - Chhatna, Dist - Bankura under Jal Swapna & Jal Jeevan Mission Programme. , SM/11823 Retrofitting Crossing Rail Track ( South Eastern RLY. K.M Bg-. 218-2 /4) in between Rly. Station Bankura (BQA) & Onda Gram (ODM) Rly. station in Salghata mouza, P.S. Bankura,by Jack Pushing method with 400 mm (OD) Spirally welded MS Casing Pipe with 200 mm dia. MS carrier pipe under Augmentation of Sub-Surface water based water supply scheme (Left out from BRGF Mouza) for Onda under Bankura Sadar Sub-Division of Bankura Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001958/2024-2025 684/BQA 12/03/2025 60 GOPAL CHANDRA CHOWDHURY 59.97 0.00 0 100
Total 490.29 0.00 0