Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 7,949.37 66.14 0.83  
1 NORTH 24 PARGANAS Barasat Arsenic Division SURFACE BASED PWSS FOR BARASAT-II BLOCK , SM/19040 Augmentation Survey, Design Drawing & DPR Preparation for Surface Based PWSS for Barasat-II Block under Barasat Arsenic Division, P.H.E. Dte. Assistant Engineer, HQ-I, Barasat Arsenic Division Junior Engineer ORD/000241/2023-2024 539/B.Ar.D. 13/03/2024 21 UMWELT ENGINEER PVT. LTD. 66.14 66.14 100 100
2 NORTH 24 PARGANAS Barasat Arsenic Division SURFACE BASED PWSS FOR BARASAT-II BLOCK , SM/19040 Augmentation Material Requisition To Resource Division RTOR000011/2023-2024 244/B.Ar.D. 06/02/2024 0 Resource Division 4,012.31 0.00 0 0
3 NORTH 24 PARGANAS Barasat Arsenic Division SURFACE BASED PWSS FOR BARASAT-II BLOCK , SM/19040 Augmentation Laying, fitting, fixing, jointing etc of Primary & Secondary Rising Main and Construction of Ground Level Reservoir (GLR) Capacity 1100 CUM with all allied works of Barasat-II Block for Surface Based PWSS for Barasat-II Block in the district of North 24 Parganas under Barasat Arsenic Division, PHE Dte. Assistant Engineer, HQ-I, Barasat Arsenic Division Junior Engineer ORD/000211/2023-2024 159/B.Ar.D. 25/01/2024 730 SUPRITI ENTERPRISE 2,710.36 0.00 0 10
4 NORTH 24 PARGANAS Eastern Mechanical SURFACE BASED PWSS FOR BARASAT-II BLOCK , SM/19040 Augmentation Providing Mechanical / Electrical Equipment for 11/0.433 KV Sub-station along with pumping station and disinfection arrangement Integrated Surface Water Based PWSS for Barasat-II Blocks in the District of North-24-Parganas. 1) Acceptance Order No. 211/MC-III dt. 01.03.2024 2) Administrative Approval No. 3497/PHE-28011/135/2023-SCHM CELL - of PHE Dept. dt. 17.11.2023 3) NIET No.-27/SEMCIII/WBPHED OF 2023-2024 (vide memo.no. 66/MC-III, Dated 13.01.2024) Assistant Engineer Junior Engineer ORD/003082/2023-2024 757/EMD 06/03/2024 756 B.T. PROJECTS PVT. LTD 780.00 0.00 0 25
5 NORTH 24 PARGANAS Barasat Arsenic Division SURFACE BASED PWSS FOR BARASAT-II BLOCK , SM/19040 Augmentation Restoration of damaged UPVC pipeline and withdrawing relaying of DI/HDPE pipe distribution System including specials all complete and necessary road restoration work for the scheme of "Surface Based PWSS for Barasat-II Block in the district of North 24 Parganas under Barasat Arsenic Division, PHE Dte". Assistant Engineer, HQ-I, Barasat Arsenic Division Junior Engineer ORD/000146/2024-2025 593/B.Ar.D. 26/03/2025 180 SUPRITI ENTERPRISE 380.56 0.00 0 20
Total 7,949.37 66.14 0.83