Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 203.73 114.8 56.35  
1 NORTH 24 PARAGANAS Barasat Arsenic Division Augmentation of Ground Water Based Piped Water Supply Scheme for RAJAPURA to accommodate FHTC under Jal Swapna Mission under Hasnabad Block in North 24 Parganas District under Barasat Arsenic Division, PHE Dte. , SM/13761 Augmentation Material Requisition To Resource Division RTOR000027/2022-2023 27/B.Ar.D. 05/01/2023 Resource Division 1.72 0.00 0 0
2 NORTH 24 PARAGANAS Barasat Arsenic Division Augmentation of Ground Water Based Piped Water Supply Scheme for RAJAPURA to accommodate FHTC under Jal Swapna Mission under Hasnabad Block in North 24 Parganas District under Barasat Arsenic Division, PHE Dte. , SM/13761 Augmentation Repair and Renovation works of Existing R.C.C. Elevated Reservoir of Capacity 250 Cu.m. at Rajapura W/S Scheme of Hasnababad Block under Barasat Arsenic Division, PHE Dte. Assistant Engineer, Barasat Arsenic Sub-Division Junior Engineer ORD/000195/2022-2023 276/B.Ar.D. 06/02/2023 60 MONDAL ENTERPRISE 11.21 8.61 76.81 1
3 NORTH 24 PARAGANAS Barasat Arsenic Division Augmentation of Ground Water Based Piped Water Supply Scheme for RAJAPURA to accommodate FHTC under Jal Swapna Mission under Hasnabad Block in North 24 Parganas District under Barasat Arsenic Division, PHE Dte. , SM/13761 Augmentation Preparation of Augmentation DPR for Rajapura Water Supply Scheme under Barasat Arsenic Division, PHE Dte. Assistant Engineer, Barasat Arsenic Sub-Division Junior Engineer ORD/000024/2023-2024 1030/B.Ar.D 28/04/2023 21 SIRCON ENGINEERING SERVICES 0.98 0.98 100 100
4 NORTH 24 PARAGANAS Barasat Arsenic Division Augmentation of Ground Water Based Piped Water Supply Scheme for RAJAPURA to accommodate FHTC under Jal Swapna Mission under Hasnabad Block in North 24 Parganas District under Barasat Arsenic Division, PHE Dte. , SM/13761 Augmentation Laying of distribution system including specials all providing Functional House hold Tap Connection (FHTC) from existing and new proposed distribution system system within command area for Augmentation of Ground Based Water Supply Scheme at Rajapura at Hasnabad Block in North 24 Pgs District under Barasat Arsenic Division, PHE Dte. Assistant Engineer, Barasat Arsenic Sub-Division Junior Engineer ORD/000048/2023-2024 1621/B.Ar.D. 12/07/2023 60 B S ENTERPRISE 48.59 32.09 66.04 100
5 NORTH 24 PARAGANAS Barasat Arsenic Division Augmentation of Ground Water Based Piped Water Supply Scheme for RAJAPURA to accommodate FHTC under Jal Swapna Mission under Hasnabad Block in North 24 Parganas District under Barasat Arsenic Division, PHE Dte. , SM/13761 Augmentation Laying of distribution System Including specials all Providing Functional House Hold Tap Connection (FHTC) from existing and new proposed distribution system within command area for Augmentation of Ground Based Water Supply Scheme at Rajapura at Hasnabad Block in North 24 Pgs District under Barasat Arsenic Division, PHE Dte. Assistant Engineer, Barasat Arsenic Sub-Division Junior Engineer ORD/000155/2022-2023 2326/BArD 06/12/2022 90 SAKTI ENTERPRISE 115.75 73.12 63.17 100
6 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme for RAJAPURA to accommodate FHTC under Jal Swapna Mission under Hasnabad Block in North 24 Parganas District under Barasat Arsenic Division, PHE Dte. , SM/13761 Augmentation Providing, installation and commissioning of submersible pumping machinery along with allied Electro-Mechanical works for Newly Sinkinng Tube Well in connection to Accommodate FHTC at Pump House No.-I , II Zone-I under Rajapura ground water based water supply scheme under Block_ Sandeshkhali-I Dist. - North 24PGS under EMD, PHE Dte. WBPHED/EE/EMD/NIeT-37 of 2023-24 (Sl no. 12) Assistant Engineer ORD/003196/2023-2024 944/EMD 18/03/2024 30 PADMA ENGINEERING CO. 25.48 0.00 0 0
Total 203.73 114.81 56.35