Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 534.9 365.62 68.35  
1 NORTH 24 PARAGANAS Eastern Mechanical Providing FHTC (Functional Household Tap Connection) of augmentation for Ground Water Based Piped Water Supply Scheme for Bayra in Bagdah Block of North 24 Parganas District under North 24 Pgs Water Supply Division-I, P.H.E. Dte. , SM/10415 Augmentation Supply, delivery & installation of Submersible Pumping Machinery alongwith allied electro- mechanical works and chlorinator(in connection with Aug. work related to FHTC) at Pump House No.II under Bayra W/S Scheme District of 24 Pgs. (N) ORD/001905/2022-2023 6150 / EMD 14/08/2022 30 TAMAL ENTERPRISE 13.22 10.93 82.68 1
2 NORTH 24 PARAGANAS Eastern Mechanical Providing FHTC (Functional Household Tap Connection) of augmentation for Ground Water Based Piped Water Supply Scheme for Bayra in Bagdah Block of North 24 Parganas District under North 24 Pgs Water Supply Division-I, P.H.E. Dte. , SM/10415 Augmentation Supply, delivery & installation of Submersible Pumping Machinery alongwith allied electro- mechanical works and chlorinator(in connection with Aug. work related to FHTC) at Pump House No.I under Bayra W/S Scheme District of 24 Pgs. (N), ORD/001912/2022-2023 6149/-EMD 14/08/2022 30 DEY ENTERPRISE 13.22 10.93 82.68 1
3 NORTH 24 PARAGANAS North 24 Pgs W/S Division I Providing FHTC (Functional Household Tap Connection) of augmentation for Ground Water Based Piped Water Supply Scheme for Bayra in Bagdah Block of North 24 Parganas District under North 24 Pgs Water Supply Division-I, P.H.E. Dte. , SM/10415 Augmentation Laying of Distribution pipe line including all necessary works at distribution system & Providing Functional House hold Tap Connection (FHTC) including supplying, laying, fitting, fixing of 15 mm NB PVC, schedule 80/20 mm OD HDPE (PE 100, PN 16) pipe with all necessary works including proposed Rising Main system within command area of Bayra Water Supply Scheme in Bagdah Block under district North 24 Parganas Water Supply Division-I, PHE. Dte. ASSISTANT ENGINEER (CIVIL), NWSSD-I JUNIOR ENGINEER (CIVIL) ORD/000048/2022-2023 867/NWSD-I 21/07/2022 90 H. I. ENTERPRISE 306.66 313.23 102.14 98
4 NORTH 24 PARAGANAS North 24 Pgs W/S Division I Providing FHTC (Functional Household Tap Connection) of augmentation for Ground Water Based Piped Water Supply Scheme for Bayra in Bagdah Block of North 24 Parganas District under North 24 Pgs Water Supply Division-I, P.H.E. Dte. , SM/10415 Augmentation Material Requisition To Resource Division RTOR000024/2022-2023 877/NWSD-I 22/07/2022 Resource Division 26.15 0.00 0 0
5 NORTH 24 PARAGANAS North 24 Pgs W/S Division I Providing FHTC (Functional Household Tap Connection) of augmentation for Ground Water Based Piped Water Supply Scheme for Bayra in Bagdah Block of North 24 Parganas District under North 24 Pgs Water Supply Division-I, P.H.E. Dte. , SM/10415 Augmentation Construction of 250 cum capacity 20 Mtr. staging height RCC Over Head Reservoir (including pile foundation), pipe connection and cost of pipes, specials, Construction Boundary Wall & Service Road at Pump House and head work site, Augmentation of Bayra Water Supply Scheme in Bagdah Block of North 24 Parganas District under North 24 Parganas W/S Division-I, PHE Dte. ASSISTANT ENGINEER (CIVIL), NWSSD-I JUNIOR ENGINEER (CIVIL) ORD/000057/2023-2024 640/NWSD-I 26/05/2023 360 M/S. BUILDWELL 156.30 22.55 14.43 20
6 NORTH 24 PARAGANAS North 24 Pgs W/S Division I Providing FHTC (Functional Household Tap Connection) of augmentation for Ground Water Based Piped Water Supply Scheme for Bayra in Bagdah Block of North 24 Parganas District under North 24 Pgs Water Supply Division-I, P.H.E. Dte. , SM/10415 Augmentation Sinking of 1 no. 300 mm. x 200 mm. dia. 250 mtr. Deep tube well by D.R. Rig method at Head Work Site at Boyra Water Supply Scheme under Bagdah Block within the jurisdiction of North 24 Pgs Water Supply Division- I, P.H.E. Dte. ASSISTANT ENGINEER (CIVIL), NWSSD-I JUNIOR ENGINEER (CIVIL) ORD/000249/2023-2024 2028/NWSD-I 13/12/2023 30 ACME CONSTRUCTION 19.35 7.98 41.24 100
Total 534.89 365.63 68.36