Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 407.85 362.91 88.98  
1 NORTH 24 PARAGANAS North 24 Pgs W/S Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Ichhlampur Zone-II Block- Bongaon, Dist-North 24 Parganas. , SM/10101 Augmentation Detail route Survey, Design and preparation of Augmentation DPR in connection with " Providing functional household tap connection to every Household with in Ichhlampur (Zone-II) Water Supply Scheme in North 24 Pgs. District under North 24 Pgs. W/S. Division-I P.H.E. Dte." ASSISTANT ENGINEER (CIVIL), NWSSD-I JUNIOR ENGINEER (CIVIL) ORD/000140/2021-2022 1187/NWSD-I 31/12/2021 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD. 3.80 3.80 100 1
2 NORTH 24 PARAGANAS North 24 Pgs W/S Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Ichhlampur Zone-II Block- Bongaon, Dist-North 24 Parganas. , SM/10101 Augmentation Laying of Distribution pipe line including all necessary works at distribution system and Providing Functional House hold Tap Connection (FHTC) including supplying, laying, fitting, fixing of 15 mm NB PVC, schedule 80/20 mm OD HDPE (PE 100, PN 16) pipe with all necessary works including proposed Rising Main system within command area of Ichhlampur Zone-II Water Supply Scheme under North 24 Parganas Water Supply Division-I, PHE. Dte. ASSISTANT ENGINEER (CIVIL), NWSSD-I JUNIOR ENGINEER (CIVIL) ORD/000018/2022-2023 526/NWSD-I 25/04/2022 90 H. I. ENTERPRISE 335.97 345.83 102.93 85
3 NORTH 24 PARAGANAS North 24 Pgs W/S Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Ichhlampur Zone-II Block- Bongaon, Dist-North 24 Parganas. , SM/10101 Augmentation Material Requisition To Resource Division RTOR000006/2022-2023 608/NWSD-I 17/05/2022 Resource Division 11.15 0.00 0 0
4 NORTH 24 PARAGANAS North 24 Pgs W/S Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Ichhlampur Zone-II Block- Bongaon, Dist-North 24 Parganas. , SM/10101 Augmentation Material Requisition To Resource Division RTOR000011/2022-2023 650/NWSD-I 23/05/2022 Resource Division 24.21 0.00 0 0
5 NORTH 24 PARAGANAS North 24 Pgs W/S Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Ichhlampur Zone-II Block- Bongaon, Dist-North 24 Parganas. , SM/10101 Augmentation Repair and renovation works of R.C.C. Elevated Reservoir OF 350 CUM, Pump House at Head Works Site, Special Repair & Renovation of Boundary Wall at Head Work Site & other allied works at Ichhlampur Zone-II W/S Scheme Under Bongaon Block In The District Of North 24 Pargana(S) Under N 24 Pgs W/S Div-I, Phe Dte. ASSISTANT ENGINEER (CIVIL), NWSSD-I JUNIOR ENGINEER 1 ORD/000135/2023-2024 1394/NWSD-I 05/09/2023 60 SAHA CONSTRUCTION & CO. 31.49 13.28 42.17 12
6 NORTH 24 PARAGANAS North 24 Pgs W/S Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Ichhlampur Zone-II Block- Bongaon, Dist-North 24 Parganas. , SM/10101 Augmentation Material Requisition To Resource Division RTOR000022/2024-2025 1309/NWSD-I 30/08/2024 Resource Division 1.23 0.00 0 0
Total 407.85 362.92 88.98