Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
4 115.31 22.05 19.12  
1 NORTH 24 PARGANAS Eastern Mechanical Augmentation of ground water based piped water supply scheme for Rajapur to accommodate FHTC , SM/17408 Augmentation Supply, Delivery Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator in connection with Aug. work related to FHTC at Pump House No.I and II Rep. under Rajapur Block Baduria WS Scheme District of 24 Pgs. N ORD/001215/2023-2024 4872/EMD 14/08/2023 30 S.G. TECHNICAL SERVICES 26.07 0.00 0 0
2 NORTH 24 PARGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Rajapur to accommodate FHTC , SM/17408 Augmentation Route Survey, Design Drawing & DPR Preparation for RAJAPUR Water Supply Scheme in Baduria Block under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/001984/2021-2022 356/BHTSD 14/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.16 4.13 99.28 0
3 NORTH 24 PARGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Rajapur to accommodate FHTC , SM/17408 Augmentation Material Requisition To Resource Division RTOR000048/2023-2024 1279/BD 25/04/2023 0 Resource Division 66.17 0.00 0 0
4 NORTH 24 PARGANAS Eastern Mechanical Augmentation of ground water based piped water supply scheme for Rajapur to accommodate FHTC , SM/17408 Augmentation Supply, delivery & installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator in connection with Aug. work related to FHTC at Pump House No.I & II under RAJAPUR W/S Scheme (Block : Tehatta I) Dist.- Nadia. NIET No.- 39 of EE/EMD of 2022-23 (Sl. No.- 09) Assistant Engineer Junior Engineer ORD/000029/2023-2024 1608/EMD 26/04/2023 617 A.S. ENTERPRISE 18.91 17.92 94.76 40
Total 115.30 22.05 19.12