Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 1,272.21 691.42 54.35  
1 NORTH 24 PARGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Dakshin Bhebia Zone-I to accommodate FHTC , SM/12123 Augmentation Material Requisition To Resource Division RTOR000238/2022-2023 930/BD 22/03/2023 0 Resource Division 86.74 0.00 0 0
2 NORTH 24 PARGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Dakshin Bhebia Zone-I to accommodate FHTC , SM/12123 Augmentation Material Requisition To Resource Division RTOR000165/2023-2024 4508/BD 28/11/2023 0 Resource Division 33.88 0.00 0 0
3 NORTH 24 PARGANAS Eastern Mechanical Augmentation of ground water based piped water supply scheme for Dakshin Bhebia Zone-I to accommodate FHTC , SM/12123 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.I & II (Zone-I)(Rep.) and Pump house no-III (New) under Dakshin Bhebia W/S Scheme with Pump House No-I and II under Ramnagar W/S scheme District of 24 Pgs. (N) Assistant Engineer Junior Engineer ORD/001158/2023-2024 4808/EMD 09/08/2023 30 A.G ENTERPRISE. 53.18 0.00 0 40
4 NORTH 24 PARGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Dakshin Bhebia Zone-I to accommodate FHTC , SM/12123 Augmentation Strengthening and improvement of RIDF road BILL/00602/2024-2025 BP-2024-25-220 02/09/2024 0 EXECUTIVE ENGINEER (HPIU), WBSRDA ,BARASAT DIVISION 45.30 0.00 0 0
5 NORTH 24 PARGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Dakshin Bhebia Zone-I to accommodate FHTC , SM/12123 Augmentation Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line, Construction of 600 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap and providing Functional Household Tap Connection in connection with Augmentaion of Dakshin Bhebia water supply scheme (Zone-I), Hasnabad Block under Hasnabad Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000781/2023-2024 2593/BD 28/08/2023 1097 H.I.ENTERPRISE. 937.45 684.96 73.07 65
6 NORTH 24 PARGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Dakshin Bhebia Zone-I to accommodate FHTC , SM/12123 Augmentation Acceptance cum work order for Surging and development of Big dia tubewell by Carrying out surging and back blowing of existing tube well including installation of suitable education pipes of adequate diameter upto required depth along with suitable airline pipes for injecting compressed air under pressure at the appropriates depth inside the tube well within Hasnabad Sub-Division PHE Dte. under Barasat Division P.H.E Dte. Assistant Engineer Junior Engineer ORD/001181/2024-2025 172/BD 15/01/2025 210 EFFLUENT & WATERTREATMENT ENGINEERS (P) LTD. 30.65 0.00 0 60
7 NORTH 24 PARGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Dakshin Bhebia Zone-I to accommodate FHTC , SM/12123 Augmentation Acceptance cum work order for Sinking of 3 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at Ph No.-1, 2 & 3 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Dakshin Bhebia w/s scheme (Z-I), Hasnabad block under Hasnabad Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001016/2024-2025 3577/BD 18/12/2024 90 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 77.52 6.46 8.33 68
8 NORTH 24 PARGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Dakshin Bhebia Zone-I to accommodate FHTC , SM/12123 Augmentation Acceptance cum work order for Construction of additional 1 no. switch room cum chlorine room (5.40x3.60) with sanitary and water supply arrangement including plinth protection in connection with augmentation of Dakshin Bhebia W/s scheme (Z-I), Hasnabad block under Hasnabad Sub-Division, P.H.E. Dte. Assistant Engineer ORD/001934/2024-2025 1024/BD 28/03/2025 75 ABDUR RAHIM GAZI 7.49 0.00 0 0
Total 1,272.21 691.42 54.35