Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
4 21,679.69 243 1.12  
1 NORTH 24 PARAGANAS Central Drilling Augmentation of ground water based piped water supply scheme for Mirjanagar to accommodate FHTC , SM/11702 Augmentation Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 300 JHARGRAM SPV PRIVATE LIMITED 21,339.76 0.00 0 11
2 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Mirjanagar to accommodate FHTC , SM/11702 Augmentation Acceptance cum work order for Sinking of 1 no. 300mm. x 200 mm. big dia 300 mtr deep Tube well by Direct Rotary Rig method at Pump House 2 using PVC pipe & strainer having 300 mm Dia 42 mtr. long Housing Pipe and 200mm Dia 30 mtr. long filter for Augmentation of Mirjanagar Water Supply Scheme in Basirhat - II Block of Basirhat Sub- Division under Barasat Division, PHE Dte. Assistant Engineer ORD/000771/2024-2025 3259/BD 25/11/2024 30 ANJALI ENTERPRISE. 21.75 0.00 0 0
3 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Mirjanagar to accommodate FHTC , SM/11702 Augmentation Acceptance cum work order for Restoration of roads under different water supply schemes of Basirhat II Block within Basirhat Sub-Division under Barasat Division P.H.E.Dte. Assistant Engineer ORD/001010/2024-2025 3554/BD 16/12/2024 30 M/S MAA TARA ENTERPRISE 29.52 0.00 0 0
4 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Mirjanagar to accommodate FHTC , SM/11702 Augmentation Formal work order for Laying of DI/UPVC distribution pipeline and Providing FHTC (Functional Household Tap Connection ) for augmentation of Mirjanagar water supply scheme in Basirhat-II block of North 24 Parganas District under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000779/2022-2023 3476/BD 01/12/2022 90 SUPER SKILL. 288.66 243.00 84.18 90
Total 21,679.69 243.00 1.12