Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 270.69 155.89 57.59  
1 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Kamlabas to accommodate FHTC , SM/11602 Augmentation Repairing & Renovation of 02Nos. Pump House and allied works at Kamlabas water supply scheme under Bongaon Sub-Division, P.H.E.Dte. Assistant Engineer Junior Engineer ORD/002955/2021-2022 592/BON 22/12/2021 21 MONDAL & CO.(BON) 2.52 2.31 91.67 1
2 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Kamlabas to accommodate FHTC , SM/11602 Augmentation Material Requisition To Resource Division RTOR000153/2022-2023 1259/BD 25/04/2023 Resource Division 17.95 0.00 0 0
3 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Kamlabas to accommodate FHTC , SM/11602 Augmentation Formal work order for Laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) for Augmentation of Kamalabas Water Supply Scheme under Bongaon Sub-Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000836/2022-2023 3630/BD 12/12/2022 90 BANERJEE CONSTRUCTION. ( BARASAT) 181.45 131.10 72.25 0
4 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Kamlabas to accommodate FHTC , SM/11602 Augmentation Acceptance cum work order for Sinking of 1 (one) no. 300 mm. x 200 mm. dia. Tube well 250 mtr deep replacement T/W by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Augmentation of Kamlabas Water Supply Scheme (2nd T/W Site) under Bongaon Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001012/2023-2024 2829/BD 15/09/2023 30 SAHA CONSTRUCTION & CO 16.14 6.73 41.7 100
5 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Kamlabas to accommodate FHTC , SM/11602 Augmentation Acceptance cum work order for Construction of Boundary wall at 2nd Tube Well site and Construction of Approach Road at Head Work & 2nd T/W site under Augmentation of Kamlabas Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. Assistant Engineer ORD/001750/2023-2024 558/BD 22/02/2024 45 S.S. INFRASTRUCTURE 10.36 0.00 0 0
6 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of ground water based piped water supply scheme for Kamlabas to accommodate FHTC , SM/11602 Augmentation New service connection at P.H.No- II of Kamalabas water supply scheme under EMSD-I ,PHE Dte. In 24Pgs(N). BILL/05527/2023-2024 BP-348-23-24 21/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 3.90 0.00 0 null
7 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Kamlabas to accommodate FHTC , SM/11602 Augmentation Acceptance cum work order for Sinking of 1 (one) no. 300 mm. x 200 mm. dia. 250 mtr deep Replacement Tubewell by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Augmentation of Kamalabas Water Supply Scheme (H/W Site) under Bongaon Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001151/2023-2024 2944/BD 27/09/2023 30 JOY GURU ENTERPRISE 16.12 6.65 41.25 100
8 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Kamlabas to accommodate FHTC , SM/11602 Augmentation Construction of 3.60 mtr. X 3.00mtr. size Switch room with sanitary and water supply arrangement incl. plinth protection at 2nd Tube Well site at Kamlabas w/s scheme Bagdah block within the jurisdiction of Bongaon Sub-Division, under Barasat Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/002274/2023-2024 211/Bon 27/02/2024 45 MONDAL & CO.(BON) 4.39 0.00 0 0
9 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Kamlabas to accommodate FHTC , SM/11602 Augmentation Acceptance cum work order for Construction of Boundary wall at Head Work site for Augmentation of Kamlabas Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001738/2023-2024 534/BD 21/02/2024 45 REAL TIME 12.89 6.63 51.44 100
10 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Kamlabas to accommodate FHTC , SM/11602 Augmentation Emergent works for repairing pipe line, FHTC refining, ferrule wash with supply of sluice valve and construction of valve chamber under Augmentation work at Kamlabas W/S Scheme Bagdah block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000322/2024-2025 490/Bon 04/04/2024 15 MONDAL & CO.(BON) 4.97 2.47 49.7 100
Total 270.70 155.88 57.58