Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 330.36 214.45 64.91  
1 NORTH 24 PARGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Hariharpur to accommodate FHTC , SM/11601 Augmentation Repairing & Renovation of 02Nos. Pump House and allied works at Hariharpur water supply scheme under Bongaon Sub-Division, P.H.E.Dte. Assistant Engineer Junior Engineer ORD/002973/2021-2022 521/ BON 28/10/2021 21 ANKIT CONSTRUCTION 2.51 2.46 98.01 1
2 NORTH 24 PARGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Hariharpur to accommodate FHTC , SM/11601 Augmentation Material Requisition To Resource Division RTOR000152/2022-2023 1256/BD 25/04/2023 0 Resource Division 12.08 0.00 0 0
3 NORTH 24 PARGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Hariharpur to accommodate FHTC , SM/11601 Augmentation Formal work order for Laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) for Augmentation of Hariharpur Water Supply Scheme, Bagdah Block under Bongaon Sub-Division, PHE Dte. Assistant Engineer Junior Engineer ORD/001006/2022-2023 175/BD 19/01/2023 900 M/S R.K. ENTERPRISE 173.76 114.27 65.76 62
4 NORTH 24 PARGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Hariharpur to accommodate FHTC , SM/11601 Augmentation Acceptance cum work order for Sinking of 1 (one) no. 300 mm. x 200 mm. dia. 250 mtr deep Replacement Tubewell by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Augmentation of Hariharpur Water Supply Scheme (H/W Site)within the jurisdiction of BongaonSub-Division, under Barasat Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001116/2023-2024 2939/BD 27/09/2023 30 JOY GURU ENTERPRISE 16.11 15.08 93.61 100
5 NORTH 24 PARGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Hariharpur to accommodate FHTC , SM/11601 Augmentation Acceptance cum work order for Repairing and renovation of Compressor Room for AIRP, Construction of Approach Road at 2nd Tube Well site and Construction of Boundary wall and Approach Road at Head Work and 2nd T/W site under Augmentation of Hariharpur Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001781/2023-2024 625/BD 28/02/2024 45 JEET ENTERPRISE. 7.66 7.66 100 100
6 NORTH 24 PARGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Hariharpur to accommodate FHTC , SM/11601 Augmentation Acceptance cum work order for Renovation of 35 Cum/hr of capacity AIRP and allied works at Head work site for Augmentation of Hariharpur Water Supply Scheme under Bongaon Sub-Division, Barasat Division P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001765/2023-2024 511/BD 20/02/2024 60 DEBAPRASAD MONDAL. 38.43 38.24 99.51 100
7 NORTH 24 PARGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Hariharpur to accommodate FHTC , SM/11601 Augmentation Acceptance cum work order for Construction of Boundary wall at Head Work site for Augmentation of Hariharpur Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001791/2023-2024 648/BD 29/02/2024 30 A.D.ENTERPRISE. 13.35 13.34 99.93 100
8 NORTH 24 PARGANAS Eastern Mechanical Augmentation of ground water based piped water supply scheme for Hariharpur to accommodate FHTC , SM/11601 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.I & II (Replacement) under Kaniara W/S Scheme, Kamalabas W/S Scheme and Hariharpur W/S Scheme District of 24 Pgs. (N). Assistant Engineer Junior Engineer ORD/001172/2023-2024 4800/EMD 09/08/2023 511 H.K. DAS & CO. 66.46 23.40 35.21 90
Total 330.37 214.46 64.91